WIN CP2000834 26CSP007 Re-Roof and Building Enclosure Repairs

Location: Texas
Posted: Aug 10, 2026
Due: Sep 22, 2026
Agency: State Government of Texas
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 26CSP007
Publication URL: To access bid details, please log in.
WIN CP2000834 26CSP007 Re-Roof and Building Enclosure Repairs
Follow Solicitation
Solicitation ID:

26CSP007

Status:

Posted

Contact Name:

Lana Beranek

Contact Number:

(512) 232-7037

Contact Email:

lana@austin.utexas.edu

Response Due Date:

9/22/2026

Response Due Time:

11:00 AM

Agency/Texas SmartBuy Member Number:

721

Posting Requirement:

21+ Days for Solicitation Notice

State Agency Procurement Certification:

Dual CTCD/CTCM certification

Solicitation Posting Date:

8/10/2026

Last Modified:

8/10/2026 10:08 am

Class/Item Code:

90922-Building Construction, Non;
90924-Building Construction, Commercial And Institutional;
77000-Roofing Materials And Supplies;
91473-Roofing And Siding;

Attachment URL: https://utexas.box.com/s/8k47dfpg5v29w5b4kllqvdbhioaukyzj
Solicitation Description:

F.L. Winship Drama Bldg. (WIN)

Replace approximately 50,000 square feet of roofing on all roof elevations of the Winship building, with the exception of the sky light roof area, using a two-ply modified bitumen roofing system backed by a 25 -year manufacturer’s warranty. Modify all MEP (Mechanical,Electrical,and Plumbing) disciplines as indicated in the sealed construction documents and perform structural roof deck repairs as required. Additionally, complete the following exterior building improvements:

•    Replace approximately 4,000 square feet of windows on the 1960 building elevations.

•    Repair damaged limestone.

•    Repair damaged masonry and repoint all cracked and/or missing mortar joints on the exterior masonry walls of both the 1960 and 1974 building sections.

•    Install fall protection systems as specified in the sealed construction drawings.

•    Preform hazardous materials abatement for all applicable aspects of the project in accordance with the project’s specifications and regulatory requirements.

Preform pre-tab and post tab of all mechanical equipment in the construction drawings and project specifications.

All work shall be completed in accordance with the sealed construction documents, applicable building codes, manufacturer’s requirements, and all governing regulations.

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...fall protection system. The design flows for each of the Aeration Basins are ...

City of League City

Bid Due: 9/23/2026

...fall protection system. The design flows for each of the Aeration Basins are ...

City of League City

Bid Due: 10/01/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.