West Ripon Road Overlay Project

Location: California
Posted: Mar 17, 2026
Due: Apr 1, 2026
Agency: City of Ripon
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
West Ripon Road Overlay Project

Department: Engineering
Start Date: 03/17/2026
Close Date: 04/01/2026 3:00 PM

SEALED BIDS will be received by the City Clerk of the City of Ripon at 259 N. Wilma Ave., Ripon, California until 3:00 pm, Wednesday, April 1, 2026 for the West Ripon Road Overlay Project.

NO PRE-BID MEETING AND JOB WALK.

Bid Set Project Documents:
Plans: West Ripon Road Overlay Plans (PDF)
Specs: West Ripon Road Overlay Specifications (PDF)

Addendums:

Bid Results:

Notice of Intent to Award:

Disclaimer Regarding Project Bid Documents & AB 2036 Compliance

This website is a free service provided by the City of Ripon ("City") for review and download of project bid documents. This site is the only sites for prospective bidders to obtain information and digital copies of official City bid documents.

The City does not warrant, represent, or guarantee the accuracy or completeness of any bid documents and/or information retrieved from any third party source. The City is not responsible for any loss or damage including, but not limited to, time, money, or goodwill arising from errors, inaccuracies or omissions in any third party bid documents and/or information.

Be advised that the information contained on this website may change over time and without notice to prospective bidders. It is the responsibility of each prospective bidder to check this website on a DAILY bases through the close of bids for any applicable addenda or updates.

City bid documents are provided electronically and free of charge. Each prospective bidder must download and print all bid documents for review and bid. It is the responsibility of each prospective bidder to verify the completeness of their printed bid documents before submitting a bid and accompanying executed addenda acknowledgement, and other required forms.

Attachment Preview

GENERAL NOTES
1. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE
RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF
THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS
REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING
HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE CITY
HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE
PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE
SOLE NEGLIGENCE OF THE CITY OF RfPON.
2. THE CONTRACTOR SHALL NOTIFY MEMBERS OF THE UNDERGROUND SERVICE ALERT
(U.S.A.) 48 HOURS IN ADVANCE OF PERFORMING EXCAVATION WORK BY CALLING THE
TOLL-FREE NUMBER {800-642-2444).
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL EXISTING
FACILITIES INCLUDING LAMPHOLES. MANHOLES, HYDRANT MARKERS, SURVEY MONUMENTS,
AND WATER VALVES, £CT., WITHIN THE CONSTRUCTION AREA.
4. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE
WITHOUT WRITTEN AUTHORIZATION FROM THE CITY ENGINEER.
5. THE CONTRACTOR SHALL EXPOSE EXISTING STORM DRAINS, SANITARY SEWERS, AND
WATER LINES WHERE CONNECTION IS TO BE MADE SO THAT HE CAN VERIFY EXISTING
FLOWLINES AND LOCATIONS BEFORE THE START OF CONSTRUCTION.
6. THE CONTRACTOR SHALL CHECK WITH THE UTILITY COMPANIES AND VERIFY ALL UTILITY
LOCATIONS. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL
EXISTING UTILITIES SO THAT NO DAMAGE RESULTS TO THEM DURING THE PERFORMANCE
OF THIS CONTRACT. THE CONTRACTOR SHALL BE REQUIRED TO COOPERATE WITH OTHER
CONTRACTORS AND UTILITY COMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND
SERVICES TO THE DEVELOPMENT.
7. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAGMEN OR
OTHER DEVICES NECESSARY TO PROVIDE FOR PUBLIC SAFETY IN ACCORDANCE WITH THE
CURRENT ISSUE OF "MANUAL OF TRAmc CONTROLS WARNING SIGNS, LIGHTS AND
DEVICES" FOR USE IN PERFORMANCE OF WORK UPON HIGHWAYS PUBLISHED BY THE
STATE OF CALIFORNIA BUSINESS AND TRANSPORTATION AGENCY.
8. CONTRACTOR SHALL REMOVE ALL EXISTING BERMS, STRUCTURES AND BARRICADES,
PAVING AND/OR OIL SCREENINGS WITHIN SPECIFIC AREAS TO BE IMPROVED.
9. THE omcE OF THE CITY ENGINEER SHALL BE NOTIFIED AT LEAST 48 HOURS IN
ADVANCE OF ANY WORK.
10. ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION SHALL BE DONE IN ACCORDANCE
WITH THE REQUIREMENTS OF THE CITY OF RfPON, DEPARTMENT OF PUBLIC WORKS
STANDARD PLANS AND SPECIFICATIONS, AND THE LATEST EDITION OF THE STATE OF
CALIFORNIA, DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS.
11. CAS AND ELECTRICAL UTILITIES, TELEPHONE AND CABLE TV UNDERGROUND WORK
SHALL BE COMPLETED PRIOR TO CONSTRUCTION OF THE CURB, GUTTER, SIDEWALK
12 IF REQUIRED, THE CONTRACTOR SHALL ADEQUATELY DEWATER THE TRENCH AREA IN
ADVANCE OF TRENCHING FOR UTILITIES, ETC. LOCATION OF WELLS FOR USE IN
DEWATER/NG MUST BE APPROVED BY THE ENGINEER.
13. THE CITY OF RIPON OR ASSOCIATED UTILITY COMPANY AND RESIDENCES TO BE
AFFECTED SHALL BE NOTIFIED IMMEDIATELY UPON ANY UTILITY SERVCI E DISRUPTION.
A 48-HOUR NOTICE SHALL BE GIVEN FOR ANY PLANNED DISRUPTION.
14. DUST SHALL BE CONTROLLED PER SECTION 10 OF THE STATE OF CALIFORNIA,
DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS AND THE CITY OF RIPON'S
SPECIF/CATIONS.
15. AN ENCROACHMENT PERMIT SHALL BE OBTAINED FROM THE CITY OF RfPON,
DEPARTMENT OF PUBLIC WORKS, OR ANY OTHER APPLICABLE AGENCIES PRIOR TO
COMMENCEMENT OF WORK WITHIN EXISTING CITY RIGHT-OF-WAY.
16. THE CONTRACTOR SHALL SECURE A TRENCH PERMIT FROM THE CALIFORNIA DIVISION
OF INDUSTRIAL SAFETY PRIOR TO EXCAVATION OF ANY TRENCH OVER FIVE FEET IN
17. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF THE REMOVAL OR RELOCATION OF
ANY DESIGNATED UTILITIES WITH RESPECTIVE UTILITY COMPANIES.
18. SECTION 1540 (a) (1) OF THE CONSTRUCT/ON SAFETY ORDERS (TITLE B CALIFORNIA
ADMINISTRATION CODE SECTION 1540), ISSUED BY THE OCCUPATIONAL SAFETY AND
HEALTH STANDARDS BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONAL SAFETY AND
HEALTH ACT OF 1913, AS AMENDED, WHICH STATES:
"PRIOR TO OPENING AN EXCAVATION EFFORT SHALL BE MADE TO DETERMINE
WHETHER UNDERGROUND INSTALLATION, I.E., SEWER, WATER, FUEL, ELECTRIC
LINES, ETC., WILL BE ENCOUNTERED AND, IF SO, WHERE SUCH UNDERGROUND
INSTALLATIONS ARE LOCATED. WHEN THE EXCAVATION APPROACHES THE
APPROXIMATE LOCATION OF SUCH AN INSTALLATION, THE EXACT LOCATION
SHALL BE DETERMINED BY CAREFUL PROBING OR HAND DIGGING AND WHEN IT
IS UNCOVERED, ADEQUATE PROTECTION SHALL BE PROVIDED FOR THE
EXISTING INSTALLATION. ALL KNOWN OWNERS OF UNDERGROUND FACILITIES
IN THE AREA CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST
48 HOURS PRIOR TO THE START OF ACTUAL EXCAVATION'.
19. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND, ALL DAMAGE OCCURRED TO EXISTING
UNDERGROUND LATERALS, PfPELINES, Etc.
CITY OF RIPON
WEST RIPON ROAD
RESURFACING
PROJECT
SHEET INDEX:
1. COVER SHEET
2. OVERVIEW
3. TREATMENT OUTLINE
4. STRIPING
5. DETAILS
N
SEINl(j.S
CALL USA TOLL FREE
1-800-642-2444
BEFORE PLANTING TREES, TRENCHING, DIGGING FENCE POST HOLES,
BLASTING, GRADING, EXCAVATING, DRILLING, PIPE PUSHING, £CT.,
CALL UNDERGROUND SERVICE ALERT FOR UNDERGROUND CLEARANCE.
USA WILL PROVIDE INFORMATION ABOUT, OR LOCATE ANY AND MARK
UNDERGROUND FACILITIES FOR YOU.
SACRAMENTO
RIPON
CALIFORNIA
APPROVED BY.·
CITY ENGINEER
REVISIONS
NO.
DESCRIPTION
DATE
BY
CITY OF RIPON
259 N. WILMA AVE
RIPON, CA 95366
TELEPHONE: (209) 599-2108
JOB/-
DATE:
2026
SCALE.·
DRAWN BY:
CHECKED BY.·
FILEV:£14_Slmits\W. Ripon flood Overlay Project\Design\Drowings\PDF\Bid Set
CITY OF RIPON
WEST RIPON ROAD RESURFACE PROJECT
COVER SHEET
SHEET
1
OF-
5
N
CITY OF RI P ON
0
120
60
Feet
N
CITY OF RI P ON
0
120
60
Feet
N
CITY OF RI P ON
0
120
60
Feet
NOTES:
1. UNDER WA/ER QUALITY ORDER 99-08-DWQ, IT IS THE OWNER/DEVOPER'S
RESPONSIBILITY TO COMPLY WITH THE STATE OF CALIFORNIA NPDES REGULATIONS.
2. THESE PLANS FOR SEDIMENT AND EROSION CONTROL MEASURES, TO BE USED, AND
SHOWN ON SAID PLANS WILL BE INSTALLED UPON PROJECT COMMENCEMENT AND MAINTAINED IN
OPERABLE CONDITION AT ALL TIMES.
3. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES
DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE AT
CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN
IS IMMINENT.
4. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE
CITY ENGINEER.
5. THE CONTRACTOR SHALL INSTALL ALL EROS/ON/SEDIMET CONTROL DEVICES TO WORKING ORDER TO
THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL.
6. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED
BY THE CITY ENGINEER DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN
CIRCUMSTANCES WHICH MAY ARISE.
7. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO
PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREATE A HAZARDOUS
CONDITION.
8. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PIAN SHALL BE
INCORPORATED HEREON.
9. GRADED AREAS AROUND THE PROJECT PERIMETE MUST BE DRAINED AWAY FROM THE FACE OF
SLOPE AT THE CONCLUSION OF EACH WORKING DAY.
10. ALL REMOVAL PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE-DAY RAIN PROBABILITY FORECAST EXCEEDS 40%.
11. THE CITY WILL PREPARE A STORM WATER POLLUTION PREVENTION PIAN (SWPPP) FOR THE
PROJECT. THE SWPPP WILL INCLUDE CONSIDERATION OF STORM WATER BEST MANAGEMENT
PRACTICES WHICH SHOULD BE INCORPORATED INTO THE PROJECT DESIGN AS WELL AS
MEASURES WHICH WILL BE IMPLEMENTED DURING THE ONGOING USE OF THE PROPOSED
PROJECT IN ORDER TO MINIMIZE URBAN RUNOFF OR OTHER CONTAMINATION.
12. THE CITY WILL FILE A NOTICE OF INTENT WITH THE REGIONAL WATER QUALITY BOARD.
Flow-+-
rlnlet
--+-Flow
Spillway, 1-bag high
TYPICAL PROTECTION FOR INLET ON SUMP
Gravel begs
2-bags high
r Fa= of Curt,
7---Flow
/Inlet
Spillway, 1-bag high
TYPICAL PROTECTION FOR INLET ON GRADE
Gravel bags
2-bags high
NOTES:
1. Intended for short-term use.
2. Use to inhibit non-storm water flow.
3. Allow for proper maintenance and cleanup.
4. Bags must be removed after adjacent operation is completed.
5. Not applicable in areas with high silts and clays without filter fabric.
FIBER ROLL
NOTES:
A SINGLE RING OF PROTECTION
USED WHEN CB/DI/INLET OR MANHOLE
IS ON AN EXISTING HARD SURFACE, E.G.
ROAD , CONCRETE ECT., DOUBLE RING
OF PROTECTION SHALL BE USED WHEN
CB/DI/MANHOLE IS LOCATED AND
SURROUNDED BY EXISTING LOOSE
GROUND/ EARTH.
"" 2" THK 3/4" A.B. (typ.)
SEE NOTES
BELOW (TYP.)
STAKES PLACED AT CORNERS
AND ENDS TO HOLD IN PLACE
ON EXISTING GROUND.
/
vAR1r0f
WC
�tyP·)
s��Rits
(typ��l
PAVEMENT REPAIR
6" GRIND
6" A.G.
[UNNATDIIVSETUGRRBOEUDND
SCALE: NONE
NOTES: FOLLOW MANUFACTURES SPECS ON JOINING AND APPLYING FIBER ROLLS,
OTHERWISE USE THE ABOVE GUIDELINES. ENDS SHALL BE ABUTTED TOGETHER
RATHER THEN OVERLAPPED.
1. CONTRACTOR AND CITY INSPECTOR SHALL MARK
ALL AREAS TO BE REPAIRED IN FIELD PRIOR
TO WORK BEGINNING.
NO. REVISED BY
DRAWN BY:
AJM
CHECKED BY:
SCALE:
NONE
GENERAL SWPPP
PROTECnON NOTES
CITY OF RIPON
CITY ENGINEER 58093
DATE:
7-5-05
STANDARD NO. SWPPP-1
NO.
REVISED BY
DRAWN BY:
AJM
CHECKED BY:
SCALE:
NONE
STORM DRAININLET
PROTECnON
CITY OF RIPON
DETAIL 1
4'-; ,>"
J4 DOMES O 7.67 NOM. SPACING O C
:a�cc��oc�t=@�©ca�o
J
BODOU�OGC�fDODOUG G
:�:ts•---------0,,,----,.
APPLY ARUOR-BONO (PAl?T NO.
ADA-8125) STRIX:TI
�-li:::::;: : :::::::::Jl[t APPLY ARUOR-SEAL {PAl?f NO. ADA-S125}
PERIME7ER SEAIA//7 Al PERIIJITER OF
AFTER INSTALLING F�NERS. TOOL SMOOTH
TITLO£]
BLEND T1L£ EDGE WlrH ADJACENT SURFACE
EP----,P---1 [ADIIES1V AT PERIMElER ANO
THROUGH CENTER OF Tll£ EACH
WAY ON BOSSED .MEAS
•· 4
0.25" x 1.5" LG COLOR
MATCHED EXPANSION ANCHOR�
(PART NO. ADA-F406-")
f---\'-c-c-���-,Uiif
i
• ,r 4
-1/2" WIDE, 0.03" DEEP BOSS Al
El,---4----<I..--,
UUADNIDIEERSS1IVDEAlOFPE71R1.IEMEFTOER
STRUCTURAL
ANO 7HROUGH
PI.AN-Tl.E
C£ll7ER OF TIL£
4
4
. ,4
DR/11. 0.25" HOLE
ro J.5" DEEP-----..
''
00000 0000�00000000
00000 OOOOOQOOO 000
H- ,,....q!!j!-I-t-0o<>_0o+ 00tftl+0-l0000-o00o00o0'0/'0' ', v-= --:--'r- ��,
v
00
0
000
Ca
000
0000
000000000000' · --",.�-
00000 000000000 000
�0000 0000000000000
OQOOO 000000000 000
00'00
0000000
00
000
00000
0
00
000
0
0
00
00
000
00 00
0
- .
__1
-
NSTALJ.ATION DETAI..
ATTl.EPElaETER
l so• POINTS
0.045" HIGH
C'.45"
NO. REVISED BY
CITY ENGINEER
58093
DATE:
07-20-04
STANDARD NO. SWPPP-2
DRAWN BY:
AJM
CHECKED BY:
SCALE:
NONE
RELDINLET
MANHOLE PROTECnON
CITY OF RIPON
CITY ENGINEER
58093
DATE:
7-5-05
STANDARD NO. SWPPP-5
NO. REVISED BY
PROPOSED GRADE OF MANHOLE FRAME
VALVE BOX FRAME, OR MONUMENT
COVER FRAME.
1" THICKNESS OF 3/8" A.C.
RISER RING
�+-- CLASS "B" CONCRETE
6" (MIN.)
COLLAR AROUND FRAME
NOTES:
ELEVATION OF FRAME SHALL MATCH RN/SH
GRN!E OF ADJACENT PAVEMENT + 1/8'.
ADJUSTING EXISTING FRAMES
PROPOSED GRADE OF MANHOLE FRAME
VALVE BOX FRAME, OR MONUMENT
SOLDIER COURSE SHALL BE INSTALLED AROUND
MANHOLE OR AS DIRECTED BY CITY ENGINEER
(
I 80MM CONCRETE PAVER
ASPHALT DEEP
LIFT REPAIR
CITY OF RIPON
STANDARD NO.
QETAL 1
FIEW LEVEL JIICRO-TEXTURE 41
POINTS PER SQUARE INCH
DETAIL 2
BOSS AROUND PERIMETE
ANO AT CENTER OF TIL£
SEC1g\lA-A
SOUND-ON-CANE AJ./PUFYING
SISmf TYPICAL THROUGHOUT
[ O.OJ" :x 0.875" DIA. TYP. 0
1.51/1.75" 0/C OFFSET
P. C.C. COLLAR BETWEEN
FRAME &- ECCENTRIC CONE VARIES
6" {MIN.}
GAI..ZANIZED OR STAINLESS STEEL
ANCHOR BOLTS
mr PJAN
TRUNf,ATFQ DQMfFAS1FNf8IOCATION
AETAL I
mr �FCT1DN
TRUNf.ATED DOME FASTENER LOCATION
NO. REVISED BY
1f, DRAWN BY:
CHECKED BY:
SCALE:
NONE
TRUNCATED DOMES
ATTACHING TO EXISTING
CONCRETE DETAIL
CITY OF RIPON
APPROVED
NO. REVISED BY
CITY ENGINEER
DATE:
STANDARD NO.
RCE-64107
ST-29a
1f, DRAWN BY:
CHECKED BY:
SCALE:
NONE
NOTES:
ELEVATION OF FRAME SHALL MATCH RN/SH
t GR,4J)E OF ADJACENT PAVEMENT 1/8'.
MINIMUM OF J ANCHOR BOLTS MUST BE USED.
ADJUSTING NEW FRAMES
TRUNCATED DOMES
ATTACHING TO EXISTING
CONCRETE DETAIL
CITY OF RIPON
APPROVED
NO. REV/SEO BY
CITY ENGINEER
DATE:
STANDARD NO.
RCE-64107
ST-29b
DRAWN BY: MCP
CHECKED BY: DJR
SCALE:
NONE
Adjusting street
Facilities to Grade
CITY OF RIPON
CITY ENGi
DATE:
2-2-99
M-6 STANDARD NO.
APPROVED BY.·
CITY ENGINEER
REVISIONS
NO.
DESCRIPTION
DATE
BY
CITY OF RIPON
259 N. WILMA AVE
RIPON, CA 95366
TELEPHON (209) 599-2108
l JOB
DATE:
2026
SCALE:
DRAWN BY.·
CHECKED BY.·
RLEV:/U_Slreels\W. Ripon Road Ovetloy Projecl\Oesign\Drowings\POFjBid Set
CITY OF RIPON
WEST RIPON ROAD RESURFACE PROJECT
DETAILS
SHEET
5
or-
5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...26 - LACC - Subcontracting Opportunity for Digital Signage - Electrical Status Stage ...

City of Los Angeles

Bid Due: 6/19/2026

...Project ID: 060-3051501-NB Title: Service and Maintenance of ID Bureau Digital Imaging Equipment... ...

Orange County

Bid Due: 7/15/2026

...Follow Repair and Modification of HC-130J Aircraft and HC-27J Aircraft Digital Crew Units ...

HOMELAND SECURITY, DEPARTMENT OF

Bid Due: 7/07/2026

...and Installation of Public Safety Video Wall and Digital Control System Audio / ...

Oakland Housing Authority

Bid Due: 6/12/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.