| Location: | California |
|---|---|
| Posted: | Jun 10, 2025 |
| Due: | Jun 25, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The work is located within the Redwood Highway Frontage Road Utility Undergrounding District in Strawberry. The project includes horizontal directional drilling of dual conduits beneath Highway 101, joint trench excavation, dewatering, shoring, installation of conduit and utility substructures, minor concrete replacement, asphalt milling, and placement of hot mix asphalt (HMA). All conduit and substructures shall be completed in accordance with project requirements and utility company specifications and shall be ready to accept utility installations upon project completion. The contractor shall also prepare and submit all documentation necessary to obtain and comply with encroachment permits from Caltrans and the City of Mill Valley.
 See ENG 2018-19 - Redwood Highway Frontage Road Rule 20A Project for full details.

With GovernmentContracts, you can:
...Basic Information Title IFB 10222937 Geological Exploration Drilling Agency Department of Water...=nQepxA1X74RawBcFpV Category ...
State Government of California
Bid Due: 12/09/2026
...Basic Information Title IFB Geotechnical Exploration Drilling - Southern CA Agency Department... - ...
State Government of California
Bid Due: 11/05/2026
...Follow Industry Day - USACE SPK Geotechnical Drilling and Laboratory Services Active Contract... ...
DEPT OF DEFENSE
Bid Due: 12/10/2026
...of the system within existing County facilities. Installation does not include drilling, cutting, ...
Alameda County
Bid Due: 11/12/2026