ADDENDUM #1
jsfa
Project:
Date:
Owner:
Architect:
CESAR CHAVEZ H.S. THEATRE RENOVATION
2929 Windflower Lane
Stockton, CA 95212
April 10, 2026
Stockton Unified School District
1944 El Pinal Drive
Stockton, CA 95212
John Sergio Fisher & Associates
5567 Reseda Boulevard, Suite 209
Los Angeles, CA 91356
A. This Addendum of clarifications, modifications, changes, additions, and/or deletions contained
herein shall be considered part of the Bid Documents for the above referenced Project as
though it had been issued at the same time and shall be incorporated integrally with the
Construction Documents for the project. Where provisions of the following supplementary
data differ from those of the Original Bid Documents, this Addendum shall govern and take
precedence.
B. Bidders are hereby notified that they shall make any adjustments in their estimates as a
result of this Addendum. It will be understood that each bidder's proposal is submitted with
full knowledge of all modifications and supplemental data specified herein.
1. CHANGES AND ADDITIONS TO THE BID DOCUMENTS
SPECIFICATIONS:
Item No. 1.01 Section 11 06 10 Theatrical Rigging Systems and Controls
REVISED
Item No. 1.02 Section 11 06 50 Theatrical Lighting Fixtures
REVISED
Item No. 1.03 Section 11 06 40 Theatrical Lighting Controls
REVISED
Item No. 1.04 Section 14 42 16 Inclined Platform Wheelchair Lift
REVISED
Cesar Chavez Theatre Renovation
Addendum 1
Page 1 of 1
STOCKTON UNIFIED SCHOOL DISTRICT SPECIFICATIONS
NOVEMBER 4, 2025
John Sergio Fisher & Associates, Inc.
Cesar Chavez HS Theatre Renovation
SECTION 11 06 10
THEATRICAL RIGGING SYSTEMS AND CONTROLS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Rigging package hoists. (Prodigy P1)
B. Rigging cable management. (Traditional Cable Management)
C. Rigging controls. (Foundation)
1.2 SCOPE OF WORK
A. One company is to be responsible for all aspects of stage rigging equipment
installation. Work in this Section: Includes furnishing labor, materials, tools,
transportation services, supervision, etc., to complete installation of stage rigging
equipment and other items as described in these specifications, as illustrated on
accompanying drawings; or as directed by the Owner's Representative.
1.3 RELATED SECTIONS
A. Related Documents: Drawings and general provisions of Contract, including General
and Supplementary Conditions and Division 1 Specification sections, apply to work
of this section.
B. Section 11 06 40 - Theatrical Lighting Controls.
C. Section 11 06 50 - Theatrical Lighting Fixtures.
1.4 REFERENCES
A. American National Standards Institute (ANSI):
1. ANSI E1.4-1 - Entertainment Technology - Manual Counterweight Rigging
Systems.
2. ANSI E1.6-1 - Entertainment Technology - Powered Hoist Systems.
B. Canadian Standards Association (CSA):
1. CSA C22.2 - General requirements - Canadian Electrical Code, Part II,
Includes Update No. 1.
C. Intertek's Electrical Testing Labs (ETL).
D. Federal Communications Commission (FCC).
E. Restriction of Hazardous Substances Directive (RoHS):
1. RoHS 2011/65/EU - Restriction of the Use of Certain Hazardous Substances in
Electrical and Electronic Equipment Directive
F. Underwriters Laboratories (UL or Ulus):
1. UL 61010 - Safety Requirements for Electrical Equipment.
11 06 10 Theatrical Rigging Systems and Controls
Page 1 of 15
STOCKTON UNIFIED SCHOOL DISTRICT SPECIFICATIONS
NOVEMBER 4, 2025
John Sergio Fisher & Associates, Inc.
Cesar Chavez HS Theatre Renovation
G. Underwriters Laboratories Canada (cUL).
1.5 SUBMITTALS
A. Submit under provisions of Section 01 33 00 – Submittals.
B. Product Data:
1. Manufacturer's data sheets on each product to be used.
2. Preparation instructions and recommendations.
3. Storage and handling requirements and recommendations.
4. Typical installation methods.
5. Shop Drawings: Provide expedited submittal of shop drawings within 14 days
after award of Contract.
6. Shop Drawing Information: Submit completed package at one time. Partial
submittal will be rejected.
7. Drawings: Complete details, dimensions, product types, equipment locations,
clearances, guides, cables, sets, Contractor fabricated equipment, and other
details required to describe the Work.
8. Scale; Equipment Layouts: 1:50; 1/4 inch equals 1 ft (6 mm equals 305
mm).
9. Scale; Equipment Details, Mounting, and Other Details: 1:25; 1/2 inch
equals 1 ft (13 mm equals 305 mm).
10. Each Sheet to have Designated Space for the Following: Approval stamp,
Project name, Supplier's name, address, telephone number, and email, and
Date submitted.
11. Variations from Construction Documents and Specifications: Indicate by
arrow and boxed caption.
12. Approval of Submitted Equipment: Obtained prior to equipment purchase or
fabrication.
13. Rejected Shop Drawings: Correct and resubmit in manner specified.
14. Submit the following items for Architect's approval, prior to fabrication:
a. Stage plan view.
b. Stage side section view.
c. Gridiron Layout: Stage equipment.
d. Electrical Riser Diagrams: Necessary power and control wiring for
rigging equipment and systems.
e. Plan and Elevation Views: Power, motor and control hardware locations
and layout.
f. Custom Panels: Dimensions for panel layouts, finishes and materials.
g. Details of installation and erection, including adjoining conditions and
necessary clearances.
h. Variations from Construction Documents and Specifications: Indicate by
arrow and boxed caption.
C. Discrepancies: If there are discrepancies in the specifications, the Contractor must
ask the Architect for clarification. If no clarification is requested, the Architect's
judgment will rule.
D. Record Drawings and Data: Within 30 days of final test and installation completion,
submit the following to the Architect.
1. Three complete sets of "as built and approved" drawings showing systems
and elements as installed, including field modifications and adjustments.
11 06 10 Theatrical Rigging Systems and Controls
Page 2 of 15
STOCKTON UNIFIED SCHOOL DISTRICT SPECIFICATIONS
NOVEMBER 4, 2025
John Sergio Fisher & Associates, Inc.
Cesar Chavez HS Theatre Renovation
2. Three sets of maintenance data including a list indicating replacement parts
lists for all items of equipment, wiring diagrams, control diagrams, any and
all keys for cabinets, racks, key operated switches etc. and complete
operation manuals.
3. Three Certificates of Guarantee.
1.6 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing products
specified in this section with a minimum five years documented experience.
B. Installer Qualifications: Company specializing in performing Work of this section
with minimum two years documented experience with projects of similar scope and
complexity.
C. Source Limitations: Provide each type of product from a single manufacturing
source to ensure uniformity.
1.7 PRE-INSTALLATION CONFERENCE
A. Convene a conference approximately two weeks before scheduled commencement
of the Work. Attendees shall include Architect, Contractor and trades involved.
Agenda shall include schedule, responsibilities, critical path items and approvals.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Store and handle in strict compliance with manufacturer's written instructions and
recommendations.
B. Protect from damage due to weather, excessive temperature, and construction
operations.
1.9 PROJECT CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within
limits recommended by manufacturer for optimum results. Do not install products
under environmental conditions outside manufacturer's recommended limits.
1.10 WARRANTY
A. Manufacturer's standard limited warranty unless indicated otherwise.
B. Installer: Guarantees the work result this specification defines, including materials
and workmanship for three years from date of full acceptance of work in
accordance with the following conditions.
1. Warranty must be in effect on materials and equipment for three years from
date of system commissioning under following conditions.
a. Maintaining warranty requires annual inspection of system by a factory
trained and certified contractor.
b. The three-year warranty is contingent upon annual inspection at end of
the first and second years of service. The end user is responsible for
making arrangements for each inspection with the contractor identified
on the Motor Controller or a factory certified inspector/installer.
11 06 10 Theatrical Rigging Systems and Controls
Page 3 of 15
STOCKTON UNIFIED SCHOOL DISTRICT SPECIFICATIONS
NOVEMBER 4, 2025
John Sergio Fisher & Associates, Inc.
Cesar Chavez HS Theatre Renovation
c. If annual inspection is not performed at the end of the first or second
year of service, the warranty becomes void at the end of that service
year
d. Warranty Inspection Reports Must be sent to factory by the inspecting
contractor within 10 days of completing inspection.
2. Nothing in this guarantee shall cause repair or replacement by Contractor
where negligence, neglect or improper operation by Owner has caused failure
of any equipment installed as defined by this specification.
1.11 SYSTEM INTEGRATOR
A. System Integrator: Contractor may utilize to coordinate and assist the installation
of motorized rigging equipment as specified. This may include but not be limited to
all motorized rigging and miscellaneous equipment.
1. The following companies have prior approval as System Integrator:
a. System Integrator Company: Musson Theatrical Inc
890 Walsh Ave
Santa Clara, CA 95050
Tel: 408-986-0210
Fax: 408-986-9552
http://www.musson.com
b. System Integrator Company:
LVH Entertainment Systems
1801 Highland Ave Unit E
Duarte, CA 91010
Tel: 805-278-4584
Fax: 805-278-7709
http://www.lvhent.com/
c. System Integrator Company:
Polaris Lighting Inc
Floyd Payne
624 Irving Ave
Glendale, CA 91201-2029
Tel: 818-265-0330
Fax: 818-265-0333
floyd@PolarisLA.com
d. System Integrator Company:
PipeGrid.Com
Jason Davis
220 East Bonita Ave, Ste 103
San Dimas, CA 91773
Tel: 626-201-4785
jason@pipegrid.com
e. System Integrator Company:
LVH Entertainment Systems
1801 Highland Ave Unit E
Duarte, CA 91010
Tel: 805-278-4584
Fax: 805-278-7709
http://www.lvhent.com/
11 06 10 Theatrical Rigging Systems and Controls
Page 4 of 15
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.