| Location: | Vermont |
|---|---|
| Posted: | May 27, 2026 |
| Due: | Jun 18, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Addison Keywords: Construction (Non Building), Paving Contractor Bid Description: The primary goal of the project is to remove and replace concrete sidewalks in targeted locations throughout the community to improve pedestrian safety, accessibility, and overall infrastructure quality. Questions during Bid - Questions shall be emailed to Cathy Foutch of Otter Creek Engineering at Foutch@ottercrk.com by June 11, 2026. Contractors are encouraged to copy Robert M. Clark, P.E., Clark@ottercrk.com. Project Components – The project consists of all work necessary to remove and replace concrete sidewalks that the Town has selected for rehabilitation, the work includes the following: • Seminary Street Ext. a. Replacement of forty-five panels (225ft) that run consecutively. Starting point is an orange paint mark with an arrow pointing East located on the sidewalk in front of #60 Seminary St Ext. The end point will be an orange paint mark with an arrow pointing West located on the sidewalk just East of Old College Farm Rd. This section also includes the following replacements: b. Replacement of 2 panels (10ft) in front of 66 Seminary Street Ext. c. Replacement of 7 panels (35ft) in front of 68 Seminary Street Ext. d. Replacement of 11 panels (55ft) in front of 72 Seminary Street Ext. • Washington Street Ext. a. Replacement of 104 panels (520ft) that run consecutively. Starting point is an orange paint mark with an arrow pointing south located on the sidewalk south of the southern entrance to Colonial Dr. The end point will be an orange paint mark with an arrow pointing north located on the sidewalk in front of the cemetery. Note: leave the two asphalt driveway entrances as is at the animal hospital. • Seymour Street a. Replacement of thirty panels (150ft) that run consecutively. Starting point is an orange paint mark with an arrow pointing north located on the sidewalk in front of #12 Seymour St. The end point will be an orange paint mark with arrow pointing south located in front of #18 Seymour St. • 60 Court Street a. 1 panel (5ft) • 64 Court Street a. 3 panels (15ft) • 202 Weybridge Street a. 3 panels (15ft) • 669 Weybridge Street a. 4 panels (20ft) • 681 Weybridge Street a. 4 panels (20ft) • 93 Monroe Street a. 26 panels (130ft) & concrete curb install • Main Street and Mill Street Intersection a. 4 panels (20ft) & granite curb reinstall • Buttolph Drive a. 19 panels (95ft) • Elm Street a. 4 panels (20ft) The Town of Middlebury will mark locations using paint that directs the Contractor to the limits of replacement. It is the Contractors responsibility for confirming the scope of replacement for each site with the Town of Middlebury before conducting any work. Contractors must provide all concrete slips to the Town of Middlebury and Otter Creek Engineering.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...with the project team, including the City's selected engineering consultant ("Engineer") and Owner's ...
State Government of Vermont
Bid Due: 7/31/2026
...for Proposal Locations: Washington Keywords: Architect and Engineering (Building), Architect... and Engineering (Non-Building), ...
State Government of Vermont
Bid Due: 8/10/2026
...Keywords: Engineering , Consultant Services, Administrative Support Services, Construction Management... administration, contract management, ...
State Government of Vermont
Bid Due: 8/03/2026