Request for Qualifications Lion's Park Shoreline Protection

Location: Ohio
Posted: May 5, 2026
Due: May 19, 2026
Agency: City of Sanduskey
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Description Opening Date/Time Closing Date/Time


Request for Qualifications


Lion's Park Shoreline Protection



May 05, 2026
7:00
AM



May 19, 2026
12:00
PM

Attachment Preview

City of Sandusky, Ohio
Lions Park Shoreline Project
Request for Qualifications
Issue Date 5/5/26
Advertisement Dates, Sandusky Register: 5/5/26 & 5/12/26
Response Due Date: 5/19/26
Communications Restrictions
Please note the following policy concerning communication between Consultants and the City
of Sandusky during the announcement and selection process:
During the time period between advertisement and the announcement of final consultant
selection, communication with consultants (or their agents) shall be limited as follows:
Communications which are strictly prohibited:
Any discussions or marketing activities related to this specific project.
Allowable communications include:
Technical or scope of services questions specific to the project or RFP requirements.
Invitation
The City invites qualified professional planning and design firms to submit qualifications to undertake the
Lions Park Shoreline Restoration and Preservation project. Qualification packages are due no later than
12:00 PM on Tuesday, May 19, 2026.
Project Description
The Lions Park Shoreline project will preserve and enhance 950 feet of Sandusky Bay shoreline for the
next generation and serve as a model for other waterfront communities to protect against erosion and
increase public access. The project will add usable beach area, increase accessibility for all ages, improve
water quality, create shoreline and near-shore habitat for Great Lakes native flora and fauna species,
enhance fishing, and protect the shore from erosion. This project will consist of detailed design and
permitting of the conceptual design completed in 2025 in the Lions Park Shore Restoration project.
Estimated Project Cost
Estimated Project Cost is $2.75M including detailed design and permitting.
Estimated Date of Authorization
City staff expects to award the project in June 2026 after reviewing the qualifications packages submitted
and receiving approval from City Commission to award the project.
Project Schedule
Qualifications Due to City:
Selection of Design Consultant:
Target Design Completion:
Bidding and Contractor Selection:
Target Construction Start:
Target Construction Completion:
May 19, 2026
June 2026
Oct 31, 2026
Q4 2026/Q1 2027
Q1 2027/Q2 2027
Q4 2027
Suspended or Debarred Firms
Firms included on the current federal or state list of firms suspended or debarred are not
eligible for selection.
Compliance with Title VI of the Civil Rights Act of 1964
The City of Sandusky, in accordance with Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42
U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it
will affirmatively ensure that any contract entered into pursuant to this advertisement, all
bidders including disadvantaged business enterprises will be afforded full and fair opportunity
to submit bids in response to this invitation and will not be discriminated against on the
grounds of race, color, national origin, sex, age, disability, low-income status, or limited
English proficiency in consideration for an award.
Draft Scope of Services
The anticipated Scope of Services is included below.
1. Review available background information including the Lions Park Shore Restoration project and
preferred design concept, existing geographical and topographical information.
2. Conduct a site visit and kick off meeting to finalize project work plan and gather field data.
3. Conduct survey and base mapping to understand existing conditions including infrastructure,
topography, site boundaries, and ownership.
4. Bathometric analysis to the extent necessary for design and permitting.
5. Conduct public engagement to build on the conceptual (roughly 30%) design and inform the 60%
schematic design before moving into detailed design. This is expected to include stakeholder
engagement with subject matter experts to inform the potential and desired species and ecosystem
outcomes of the project.
6. Prepare phased and final design contract documents for Owner review for the selected alternatives.
This may include landscape and hardscape elevation and details, green infrastructure, schematic
design, plan sheets and typical (cross) sections, specifications, plan narrative, visualizations and
exhibits, construction phasing plan, site materials, signage, planting plan, engineer’s cost estimate, and
all other items required for a complete detailed design for a design-bid-build format. Meet with the
City to review submittal comments as needed.
7. Provide any needed permit documentation, environmental approvals, Stormwater Pollution
Prevention Plans, and agency coordination to accomplish the project. Ex.: Shoreline Structure Permit
and any USACE permitting required.
8. Provide limited professional services for bidding and construction phases to assist in contractor
selection, answer design-related questions and review drawings and submittals.
9. If authorized – provide construction engineering and inspection services, possibly under subsequent
contract.
10. If authorized – services during construction such as attendance at construction progress meetings,
review of installations on-site, and review of any substitutions during constriction phase.
Requirements for Selection Process
A. Instructions for Preparing and Submitting Qualifications
1. Provide the information requested in the Letter of Interest Content (Item B below), in
the same order listed, in a letter signed by an officer of the firm. Do not send additional
forms, resumes, brochures, or other material.
2. Submittals shall be limited to twelve (12) 8½" x 11" single-sided pages. Page count
does not include (optional) cover or divider pages.
3. Please adhere to the following requirements in preparing:
a. Use legible font sizes (11- to 12-point for body copy) and maintain margins no
less than 0.5" on all sides for text content.
b. Include page numbers at the bottom of each page.
c. Use 8½" x 11" sized format only.
d. If paper copies are provided, do not provide tabbed inserts or other features that may
interfere with printing or machine copying.
B. Submittal Content
1. Cover letter
2. Qualifications of your firm to complete the requested services.
3. List significant sub-consultants, their current prequalification categories and the percentage of
work to be performed by each sub-consultant.
4. List the Project Manager and other key assigned staff members, including key sub-consultant
staff. Include project engineers for important disciplines and staff members that
will be responsible for the work, and the project responsibility of each. Address the experience
of the key staff members on similar projects, staff qualifications, and related projects your
proposed team has been involved in, and to what extent their involvement was.
5. Provide a description of your Project Approach, including expected schedule.
6. Provide examples and imagery of comparable completed projects, locations and references.
Items 1 through 6 must be included within the 12-page body of the submittal. Any remaining
space may be utilized to provide pertinent personnel resumes or additional information
concerning general qualifications.
Submittal
Submissions are to be delivered electronically in a single PDF document.
To:
Arin Blair, AICP, Chief Planner, ablair@cityofsandusky.com
Cc:
Josh Snyder, Interim Director, Public Works, jsnyder1@cityofsandusky.com
Melissa Vassallo, Project Coordinator, mvassallo@cityofsandusky.com
Reference Documents and Attachments
Consultant Selection Rating Form
Lions Park Shore Restoration project (concept 3 is preferred concept to move into design)
Lions Park Shoreline Restoration
Evaluation Form
City of Sandusky
Lions Park Shoreline Project
Name of Firm:
__________________________________________________________________
Name of Evaluator:
__________________________________________________________________
Criteria
1 Strength of project manager and
strength/experience of key team members
and proposed subcontracted firms key
personnel
2 Past performance and experience with
projects of similar scope and size
3 Project approach, which includes all listed
items in the Scope of Work
4 Project Schedule
Max
Points
20
30
30
20
Total Score
Score
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

2026 CMSD School Sites The 2026 CMSD School Sites RFQ invites professional real

City of Cleveland

Bid Due: 6/30/2026

Follow Base Wide Microgrid A&E Type C Services Active Contract Opportunity Notice ID

DEPT OF DEFENSE

Bid Due: 7/06/2026

Project: OWNER'S ADVISOR AND DESIGN SERVICES FOR MERCY WEST ADVANCED TREATMENT SYSTEM Ref.

City of Cincinnati

Bid Due: 6/23/2026

Sandusky River Wall SREB-5 Rehabilitation Design, June 30, 2026 LEGAL NOTICE The City

Tiffin city

Bid Due: 6/30/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.