4. #26-1014 - Request for Qualifications - Engineering Services for Sanitary Sewer Force Main Conveyance System Project

Location: North Carolina
Posted: Apr 7, 2026
Due: May 5, 2026
Agency: Catawba County
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
Publication URL: To access bid details, please log in.

4. #26-1014 - Request for Qualifications - Engineering Services for Sanitary Sewer Force Main Conveyance System Project


Attachment Preview

REQUEST FOR QUALIFICATIONS
ENGINEERING SERVICES
SANITARY SEWER FORCE MAIN CONVEYANCE SYSTEM PROJECT
RFQ NO. 26-1014
Date of Issue: April 7, 2026
Qualifications Statement Due Date: May 5, 2026
Time: 5:00 PM ET
Issued for:
Catawba County Utilities & Engineering
Water and Sewer Division
25 Government Drive
Newton, North Carolina 28658
(828) 465-8261
Issued by:
Catawba County Purchasing Manager
25 Government Drive
Newton, North Carolina 28658
(828) 465-8224
1|Page
INTRODUCTION
Catawba County (hereinafter “County”) is soliciting the submittal of qualification
statements from experienced Engineering Firms (hereinafter “Firm) interested in
providing services for the development of a Preliminary Engineering Report (PER)
including route alternatives, project cost estimates, environmental impacts, etc.;
Engineering design including all necessary drawings and specifications; All necessary
permitting; Project bidding and award; Construction Administration and inspection
services, for a force main sanitary sewer conveyance system project estimated to be
22,000 linear feet to 61,000 linear feet in distance connecting to the Future Slanting
Bridge Sanitary Sewer Lift Station to the existing Hickory-Catawba Wastewater
Treatment Plant. The Conveyance System will be designed to convey 1.5 MGD, and
expandible to convey 3.0 MGD. This project is anticipated to include work within and
outside the NCDOT right-of-way. The property acquisition for this project will be
performed by others, but the Firm will be asked to obtain permits to locate the
conveyance system in NCDOT right-of-way where applicable. Eligible firms must have
demonstrated experience in the wastewater project development from PER through
project certification.
Catawba County reserves the right to reject any and all submittals. This submittal
request is neither a contractual offer nor a commitment to purchase services. The
County assumes no contractual obligation as a result of the issuance of this request,
the preparation or submission of a qualifications statement by a Firm, the evaluation
of statements or final selection.
PURPOSE
This Request for Qualifications (RFQ) is being issued by County for the purpose of
soliciting Statements of Qualifications from firms for providing services for the design
and construction administration and inspection for a force main sanitary sewer
conveyance project in the southeastern part of Catawba County.
RFQ SCHEDULE
The table below shows the intended schedule for this RFQ. Catawba County will make
every effort to adhere to this schedule.
Event
Issue RFQ
Submitted Written Questions
Provide Responses to Questions
Submit Proposals
Contract Award
Contract Effective Date
Responsibility
County
Firms
County
Firms
County
County
Date and Time
April 7, 2026
April 23, 2026 at 5:00 PM
April 27, 2026 at 5:00 PM
May 5, 2026 at 5:00 PM
TBA
Upon execution
The qualifications statement shall be submitted no later than 5:00 PM on May 5,
2026. No submittals will be accepted after the deadline.
Once the submittals have been reviewed, the County reserves the right to shortlist
Firm(s) and request that the Firm(s) conduct a presentation and be interviewed by the
selection committee.
2|Page
RFQ QUESTIONS
Written questions shall be emailed to tinawright@catawbacountync.gov by the date and
time specified above. Firms should enter “RFQ # 26-1014 Questions” as the subject
for the email. Questions received prior to the submission deadline date, the County’s
response, and any additional terms deemed necessary by the County will be posted in
the form of an addendum to the Catawba County website,
https://www.catawbacountync.gov/county-services/purchasing/bid-notices/ and
shall become an Addendum to this RFQ. No information, instruction or advice provided
orally or informally by any County personnel, whether made in response to a question
or otherwise in connection with this RFQ, shall be considered authoritative or binding.
Firms shall rely only on written material contained in an Addendum to this RFQ.
SUBMISSION OF QUALIFICATIONS
The qualifications statement must be submitted with one (1) original, one (1) copy and
one (1) electronic copy on flash drive. When responding to this RFQ, please follow all
instructions carefully. Please submit proposal contents according to the outline
specified. Failure to follow these instructions may be considered a non-responsive
submission and may result in immediate elimination from further consideration. The
qualifications statement should be sent to the address indicated in the table below.
Mailing address for delivery of
proposal via US Postal Service
RFQ Number: RFQ 26-1014
Catawba County Government Center
Attn: Purchasing Department
Post Office Box 389
Newton, North Carolina 28658
Office Address of delivery by any
other method (hand delivery,
overnight, or any other carrier)
RFQ Number: RFQ 26-1014
Catawba County Government Center
Attn: Purchasing Department
25 Government Drive
Newton, North Carolina 28658
IMPORTANT NOTE: All qualifications shall be physically delivered to the office address
listed above on or before the submission deadline in order to be considered timely,
regardless of the method of delivery. This is an absolute requirement. All risk of late
arrival due to unanticipated delaywhether delivered by hand, U.S. Postal Service,
courier or other delivery service is entirely on the Firm(s). It is the sole responsibility of
the Firm to have the qualifications physically in this Office by the specified time and
date of opening.
BACKGROUND
History of Utilities in the SECC
The Catawba County Board of Commissioners (BOC) has long recognized the role of
proactive infrastructure planning in establishing and maintaining a climate conducive
to fostering quality growth and development. Over time, the BOC has governed in such
a way that acknowledges the support role played by water and sewer infrastructure in
facilitating and enabling market-driven development, rather than pushing or propelling
that growth. In the early 2000’s, through an extensive public process involving design
charrettes and citizen-based committees, Catawba County developed the Sherrills Ford
Small Area Plan, in which the need for water and sewer investment and the notion of
3|Page
land use driving infrastructure requirements was explicitly laid out. This Land Use Plan
was updated in 2024.
The BOC also has a strong and long-standing tradition of partnership and collaboration.
As such, Catawba County operates a water and sewer utility system through a series of
partnership agreements involving municipalities within the region. Catawba County
offers these services to its citizens through contract with partner jurisdictions for
maintenance and operation of water and sewer systems, participating in various cost-
share models for the funding of line extensions and infrastructure investments to
support this approach. This series of agreements, some of which are specifically
discussed below, has evolved over time to yield a service delivery system whereby County
residents and businesses are afforded access to utilities provided by the County’s
municipal partners on behalf of the County.
WATER
The City of Hickory is the primary supplier of drinking water to the citizens of Catawba
County. As such, Catawba County entered into a contract with the City of Hickory in
August of 2000 for the provision of long-term supply of municipal water to Southeastern
Catawba County (SECC) through 2040. Thus, the SECC water distribution loop was a
needed benefit for the citizens of the SECC area, the towns of Maiden and Catawba, and
the cities of Claremont and Conover, ensuring the continuous flow of drinking water by
providing a fortified distribution system. All cities could benefit from the SECC loop in
the event of a catastrophic event involving their water distribution systems.
The SECC water distribution loop was developed in three separate, but co-dependent
phases. Between 2000 and 2016, Catawba County, in partnership with City of Hickory,
constructed the water loop from the Conover interconnect, south along Sherrills Ford
Road to NC Highway 150. From NC Highway 150, the waterline continued to East
Maiden Road and Olivers Cross Roads, eventually interconnecting with Hickory’s water
system on Startown Road.
SEWER
While the final phase of water was under construction, the County began to extend
sewer lines in the SECC area in an effort to expand service and spur economic
development, primarily along the NC Highway 150 corridor. Sewer infrastructure began
in 2010 with the northern section, a series of pump stations and force mains from
Sherrills Ford Elementary School along Mollys Backbone Road, then along Brown
Chapel Road, eventually connecting with City of Hickory’s sewer system at the Hickory-
Catawba Wastewater Treatment Plant. Sewer service then expanded along the NC
Highway 150 corridor with a series of gravity sewers, pump stations and, force main
sewers connecting to the northern project at Sherrills Ford Elementary School. Sewer
along the NC Highway 150 corridor was completed in 2019.
While the sewer system along NC Highway 150 was under construction, the Hickory-
Catawba Wastewater Treatment Facility expanded to 1.5 million gallons per day.
SCOPE OF SERVICES
The Firm shall provide professional engineering services to assist with the following:
Finding a sanitary sewer force main route from the future site of the Slanting Bridge
4|Page
Sanitary Sewer Lift Station to the Hickory-Catawba Wastewater Treatment Plant. The
force main will be designed to convey 1.5 MGD upon completion and be expandable to
3.0 MGD. The consultant selected for this project shall prepare design plans and
specifications for force main; Obtain all necessary permits; Prepare bid documents and
assist with bidding the project; Assist the County in evaluating the bids; Provide
construction oversight and inspections services through the construction process; and
prepare the final record drawings for the project. The following tasks comprise the
general scope of work:
1. Project Kickoff Meeting
2. Develop Preliminary Engineering Report showing routing options and
discussing pros and cons of each
3. Survey selected route
4. Prepare any easement maps and descriptions needed for selected route
5. Prepare construction plans and specifications
6. Provide Assistance in preparation of bid documents
7. Provide assistance in responding to bid questions
8. Bid evaluation assistance and recommendation
9. Construction Kickoff Meeting
10. Contract Administration
11. Review submittals and answer RFIs
12. Provide construction oversite and inspection services
13. Review contractor’s invoices and make recommendation for payment
14. Prepare final record drawings in hardcopy and electronic/pdf format on a
flash drive. Electronic record drawings will include surveyed attributes for
inclusion in County’s GIS. Attributes include, but are not limited to, air
release valve location and pipe depth.
The list of tasks above is not meant to be a full description of the work, but a summary
breakdown of the scope in the design and construction of the gravity sewer.
CONTENTS OF QUALIFICATIONS STATEMENT
Respondents must carefully read the information in this “Contents of Qualifications
Statement” section and submit a complete Qualifications Statement responding to each
request for information. Incomplete Qualifications Statements will be considered non-
responsive and are subject to rejection.
Qualifications shall be submitted on 8-1/2 x 11 paper, side bound with Table of
Contents and reference tabs for key sections. Qualifications Statements shall be
limited to 30 pages, printed front and back.
The qualification statement must be submitted with one (1) original, one (1) copy and
one (1) electronic copy on flash drive.
Qualification Statement shall include the following information:
1. Introduction Letter of Transmittal
• Summarize in a brief and concise manner the Firm’s understanding of the scope
of work and make a positive commitment to perform the work in a professional
and timely manner.
5|Page
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Title Main Commodity/Service Category Solicitation # Buyer Phone Submission Deadline Sewer Lateral...

Lumberton Housing Authority

Bid Due: 6/16/2026

...Title Main Commodity/Service Category Solicitation # Buyer Phone Submission Deadline Sewer &...

Lumberton Housing Authority

Bid Due: 6/16/2026

...of small diameter water mains and 4400 LF of small diameter sewer mains ...

State Government of North Carolina

Bid Due: 6/11/2026

...Bid Title: RFQ-ENGINEERING SERVICES FOR LEAD SERVICE LINE REPLACEMENT PHASE 1 AND SEWER... ...

Lumberton city

Bid Due: 6/16/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.