| Location: | Florida |
|---|---|
| Posted: | Mar 30, 2025 |
| Due: | Apr 16, 2025 |
| Agency: | State Government of Florida |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ITB-12117 |
| Publication URL: | To access bid details, please log in. |
| Code | Description |
| 72121008 | Warehouse construction and remodeling service |
| 72121300 | Automotive garage and service station construction services |
| 72121301 | Automotive garage construction service |
| 72121400 | Specialized public building construction services |
| 72141102 | Land grading service |
| 72151901 | Foundation building service |
| 72152700 | Concrete installation and repair services |
| 72152710 | Foundation and footing construction service |
March 28, 2025
NOTICE TO APPLICANTS
ADDENDUM NO. TWO (2)
Crystal River State Park- Boat Barn
DEP BID NO. BDC47-24/25
TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.
NOTICE
It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Laurinda Micheels, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.
_______________________________________
Signature of Contractor and Date
The following statements supersede & supplement the corresponding items in the specifications & drawings:
1. Question: Can a pole barn with sides be an approved equal for this project?
Answer: Please refer to Sheet G101 in the construction drawings. If the “pole barn with sides” matches what is specified under the “Carport Specific Notes”, then it may be acceptable.
2. Question: Found in the notes, the GC puts together a SOV. Will the awarded GC be able to make a progress draw(s)?
Answer: The GC, General Contractor, may submit a payment request to FDEP, in increments of no less than a month, for completed work.
3. Question: Please verify the elevation and location of the benchmark.
Answer: Please refer to the Existing Conditions C100 and Site Plan C102 in the drawing set and the included Topographic Survey. Sheet C100 and the Topographic Survey show the Benchmarks which include the elevation and locations of each. Sheet C102 provides the location of the proposed building corners.
4. Question: Who is responsible to hire and pay for the Archeological Resource Manager who the documents say is required?
Answer: The Florida Department of Environmental Protection.
In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.
Please direct all questions to:| Description | Date/Time |
| Addendum 2 BDC47-24/25 Crystal River State Park - Boat Barn | Mar 29, 2025, 2:43:40 AM |

With GovernmentContracts, you can:
...Title: NORTHEAST TRANSFER STATION SCALE HOUSE REMODELING Opening Date: 6/8/2026 2:00:00 PM... of ...
Miami-Dade County
Bid Due: 6/08/2026
...services 72111001 Single family home remodeling addition and repair service 72111002 Single family ...
State Government of Florida
Bid Due: 7/06/2026
...service 72121006 Prefabricated industrial building erection and remodeling service 72152400 Window...
State Government of Florida
Bid Due: 10/01/2026
...and remodeling service 72121100 Commercial and office building construction services 72121101 Commercial...
State Government of Florida
Bid Due: 6/11/2026