| Location: | California |
|---|---|
| Posted: | May 7, 2026 |
| Due: | Jun 9, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | NAVMWR-26-R-0038 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg. 485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility.
The Work includes, but not limited to:
1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility “pot holing”) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Contracting Officer’s Representative (COR).
2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and requirements. The Contractor shall refer to Section H for additional information regarding design submittal requirements.
3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging,
delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work.
Additional information provided in attached RFP.
| May 15, 2026 | [Solicitation (Updated)] BOWLING CENTER AND F&B UPGRADES |
| Jun 1, 2026 | [Solicitation (Updated)] BOWLING CENTER AND F&B UPGRADES |
| Jun 11, 2026 | [Solicitation (Updated)] BOWLING CENTER AND F&B UPGRADES |
| Jun 16, 2026 | [Solicitation (Updated)] BOWLING CENTER AND F&B UPGRADES |
| Jun 23, 2026 | [Solicitation (Updated)] BOWLING CENTER AND F&B UPGRADES |

With GovernmentContracts, you can:
...Project ID: Title: RFQ 902761 Landscape Chemical Addenda: 0 Release Date: 9/4/2026 Due ...
Alameda County
Bid Due: 10/15/2026
...Bid Number: RFP 2026-06 Bid Title: LANDSCAPE MAINTENANCE ON-CALL CONTRACT Category: Maintenance... the ...
City of Seaside
Bid Due: 10/01/2026
...Basic Information Title WATER CONSERVATION LANDSCAPE SERVICES - IFB 26C335002 Agency Dept... UNSPSC ...
State Government of California
Bid Due: 10/06/2026
...Landscape Maintenance Services - Mather Commerce Center Department: Public Works Category: Public..., through ...
City of Rancho Cordova
Bid Due: 10/01/2026