| Location: | Virginia |
|---|---|
| Posted: | May 7, 2026 |
| Due: | May 21, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W91QF526QA004 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
SOURCES SOUGHT NOTICE
Notice Type: Sources Sought / Request for Information (RFI)
Title: Switchboard and Motor Control Center (MCC) Panel Replacement Service
Location: ALTESS Data Center, Radford Army Ammunition Plant, Radford, VA
1.0 Introduction and Purpose
This is a Sources Sought Notice issued for market research and planning purposes only. This is NOT a solicitation, Request for Proposal (RFP), Request for Quotation (RFQ), or Invitation for Bid (IFB). It does not constitute a commitment by the Government to issue a contract, nor will the Government pay for any information submitted in response to this notice.
The purpose of this Sources Sought is to identify qualified and capable sources (including Small Businesses, 8(a), Service-Disabled Veteran-Owned, HUBZone, and Women-Owned Small Businesses) that can provide the required removal, installation, and integration services for switchboards and Motor Control Center (MCC) panels at the ALTESS data center.
2.0 Background and Scope Summary
The Contractor shall provide removal of one (1) Westinghouse switchboard and Motor Control Center (MCC) panel located in RM 241, and one (1) GE switchboard to include associated Motor Control Center (MCC) panel located in RM 119, and provide customized installation of one (1) Eaton (or equal) switchboard and Motor Control Center (MCC) panel located in RM 241, and one (1) Eaton (or equal) switchboard and Motor Control Center (MCC) panel located in RM 119 located within the ALTESS data center located on site in Radford, VA 24141-1061.
Specific Tasks:
Room 119 Equipment Removal & Installation Services:
Westinghouse Fused Switchboard and Motor Control Center (MCC): Westinghouse fused switchboard and motor control center (MCC) panel replacement service shall include:
Room 241 Equipment Removal & Installation Services:
3.0 Requested Capability Statement
Interested parties are requested to submit a Capability Statement demonstrating their ability to perform the services described in the SOW. Please provide the following information structured in your response:
Requirement Category
Specific Information Requested
Company Profile
Company Name, Address, CAGE Code, and Unique Entity ID (UEI).
Point of Contact
Name, Title, Phone Number, and Email Address of the primary representative.
Business Size & Socio-Economic Status
Specify your business size under the applicable NAICS code (238210 - Electrical Contractors) and any applicable socio-economic categories (e.g., 8(a), SDVOSB, WOSB, HUBZone).
Technical Capability
Detailed narrative demonstrating the capability to provide, install, and customize Eaton (or equal) switchboards/MCCs. Must explicitly address the ability to provide a certified Trane Authorized Controls technician and integrate with Schneider Electric StruxureWare.
Logistics & Security
Statement of ability to conduct required after-hours/weekend repowering work and comply with Radford Army Ammunition Plant (RFAAP) security and background check requirements.
Past Performance
Briefly describe up to three (3) similar projects completed within the last five (5) years involving data center power infrastructure replacement, BAS integration, and secure facility operations.
4.0 Submission Instructions
Responses should be concise and focused on the capability to meet the Government's requirements.
Submission Detail
Instruction
Page Limit
Maximum of ten (10) pages.
Document Format
PDF or Microsoft Word format.
Submission Email
KO heather.b.jarratt.civ@army.mil, CS kenneth.r.lancaster11.civ@army.mil, and CC: sharon.e.bane.civ@army.mil (COR)
Response Deadline
Thursday, May 21, 2026 at 12:00 PM EST
Subject Line
Sources Sought Response: ALTESS Switchboard & MCC Replacement
Disclaimer: Information received in response to this notice will be used solely for market research and acquisition strategy planning. Proprietary information, if any, should be minimized and MUST BE CLEARLY MARKED. To aid the Government, please segregate proprietary information

With GovernmentContracts, you can:
...emails are not auto-generated. Background: The NWS Radar Next program launched in 2023...
COMMERCE, DEPARTMENT OF
Bid Due: 6/15/2026
...LB Winch w/ Rope, Auto Stop and wireless remote 4-stroke twin cylinder DOHC ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/03/2026
...) Circuit Center, (1) Actuator, (1) Hoffman Auto purge. Remove and replace existing ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/15/2026