Switchboard and Motor Control Center (MCC) Panel Replacement Service

Location: Virginia
Posted: May 7, 2026
Due: May 21, 2026
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation No: W91QF526QA004
Publication URL: To access bid details, please log in.
Follow
Switchboard and Motor Control Center (MCC) Panel Replacement Service
Active
Contract Opportunity
Notice ID
W91QF526QA004
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
AMC
Sub Command
ACC
Sub Command 2
MISSION INSTALLATION CONTRACTING COMMAND
Sub Command 3
FDO EUSTIS
Office
W6QM MICC FT LEE
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Sources Sought (Original)
  • Original Published Date: May 07, 2026 02:39 pm EDT
  • Original Response Date: May 21, 2026 12:00 pm EDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Jun 05, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: No Set aside used
  • Product Service Code: J030 - MAINT/REPAIR/REBUILD OF EQUIPMENT- MECHANICAL POWER TRANSMISSION EQUIPMENT
  • NAICS Code:
    • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • Place of Performance:
    Radford , VA 24141
    USA
Description

SOURCES SOUGHT NOTICE



Notice Type: Sources Sought / Request for Information (RFI)

Title: Switchboard and Motor Control Center (MCC) Panel Replacement Service

Location: ALTESS Data Center, Radford Army Ammunition Plant, Radford, VA



1.0 Introduction and Purpose



This is a Sources Sought Notice issued for market research and planning purposes only. This is NOT a solicitation, Request for Proposal (RFP), Request for Quotation (RFQ), or Invitation for Bid (IFB). It does not constitute a commitment by the Government to issue a contract, nor will the Government pay for any information submitted in response to this notice.



The purpose of this Sources Sought is to identify qualified and capable sources (including Small Businesses, 8(a), Service-Disabled Veteran-Owned, HUBZone, and Women-Owned Small Businesses) that can provide the required removal, installation, and integration services for switchboards and Motor Control Center (MCC) panels at the ALTESS data center.



2.0 Background and Scope Summary



The Contractor shall provide removal of one (1) Westinghouse switchboard and Motor Control Center (MCC) panel located in RM 241, and one (1) GE switchboard to include associated Motor Control Center (MCC) panel located in RM 119, and provide customized installation of one (1) Eaton (or equal) switchboard and Motor Control Center (MCC) panel located in RM 241, and one (1) Eaton (or equal) switchboard and Motor Control Center (MCC) panel located in RM 119 located within the ALTESS data center located on site in Radford, VA 24141-1061.



Specific Tasks:




  • GE Fused Switchboard and Motor Control Center (MCC): GE fused switchboard and motor control center (MCC) panel replacement service shall include:



Room 119 Equipment Removal & Installation Services:




  • Removal of existing GE Fused Switchboard and MCC panel and all associated components.

  • Disconnect two (2) hot water pumps from GE MCC during removal.

  • Hot water pumps must be temporally powered via alternate source until new MCC panel is operational. Hot water pumps will be reconnected to new MCC and functionally tested.

  • Enclosed starters must be provided (if applicable)

  • Removal of all feeder circuits from GE switchboard to GE MCC.

  • Through circuits identified during demolition shall be rerouted to maintain operation of assigned equipment.

  • One (1) circuit passes through to feed the Air Handler Unit (AHU) -1, and its associated CTs and Trane controls integration components shall be moved.

  • All old unused control circuits within MCC shall be removed back to their origination points.

  • Identified control circuits will be going to the existing Powers Controls hand-off-auto (HOA) board in RM 119.

  • All controls wiring, current transformers (CTs), and components supporting Trane Building Automation System (BAS) and/or Schneider Electric StruxureWare monitoring systems shall be kept intact and reinstalled into new MCC panel.

    • All work tied to the BAS system shall only be verified and recommissioned by a certified Trane Authorized Controls technician to include full functional testing.

    • All Schneider Electric StruxureWare monitoring systems metering components shall be verified and functional tested prior to project completed and installation of new MCC.



  • Removal of all HOAs from the Powers Controls HOA board in RM 119.

  • Installation of a one (1) new customized Eaton (or equal) Switchboard and MCC Panels

  • Install new HOAs into new MCC doors of associated buckets.

  • Installation of a new MCC panel.

    • Panel to include sufficient amount of motor starter buckets (approximately 11 current active).

      • Panel to supply all current loads, and additional feeder buckets to refeed six (6) existing lighting panel feeds from the GE Switchboard (five (5) existing 200A feeds and one (1) existing 100A feed), and provisional spots for future equipment.





  • Refeed new MCC overhead from 800A breaker to existing 208v Square-D panel in RM 119.

  • Disconnect and reroute six (6) existing lighting panel feeds using the GE switchboard as a junction box to reconnect to new MCC panel.

    • Upon reconnection, old GE switchboard shall be covered by sheet metal.

      • All work and repowering the six (6) existing panels from the new MCC shall be done after hours, on weekends when the facility is not occupied.







Westinghouse Fused Switchboard and Motor Control Center (MCC): Westinghouse fused switchboard and motor control center (MCC) panel replacement service shall include:



Room 241 Equipment Removal & Installation Services:




  • Removal of existing Westinghouse Fused Switchboard and MCC panel and all associated components.

  • Disconnect two (2) hot water pumps and two (2) existing sewer ejection compressors from existing Westinghouse fused switchboard MCC panel during removal.

    • Hot water pumps and sewer ejection compressors must be temporally powered via alternate source until new MCC panel is operational. Hot water pumps will be reconnected to new MCC and functionally tested.

      • Enclosed starters must be provided (if applicable)





  • Removal of all feeder circuits between the Westinghouse switchboard and MCC.

  • Through circuits identified during demolition shall be rerouted to maintain operation of assigned equipment.

  • All controls wiring, CTs, and components supporting Trane Building Automation System (BAS) and/or Schneider Electric StruxureWare monitoring systems shall be kept intact and reinstalled into new MCC panel.

    • All work tied to the BAS system shall only be verified and recommissioned by a certified Trane Authorized Controls technician to include full functional testing.

    • All Schneider Electric StruxureWare monitoring systems metering components shall be verified and functional tested prior to project completed and installation of new MCC.

      • Most HOAs controlling equipment within the MCC tie back to Johnson Control HOAs in RM 241.





  • Installation of one (1) new customized Eaton (or equal) Switchboard and MCC Panels

  • Installation of a new MCC panel.

    • Panel to include sufficient amount of motor starter buckets (approximately fourteen (14) current active).

      • Panel to supply all current loads, and additional feeder buckets to refeed four (4) existing lighting panel feeds and Johnson Control Panel feed from Westinghouse Switchboard (four (4) existing 200A feeds and one (1) existing 50A feed), and two (2) provisional spots for future equipment.





  • All HOAs shall remain in Johnson Controls HOA panel in RM 241 and wired back to the associated equipment MCC buckets that currently exist.

    • All controls and wiring associated with the Trane Building Automation System (BAS) shall be kept intact and reinstalled into the new MCC panel. All related work shall only be verified and recommissioned by a certified Trane Authorized Controls technician to include full functional testing upon completion of service.



  • Refeed new MCC overhead from 800A breaker to existing 208v Square-D panel in RM 119.

  • Disconnect and reroute four (4) existing lighting panel feeds from the Westinghouse Switchboard (four (4) existing 200A feeds) with the feeder buckets into the new MCC.

    • Upon reconnection, old Westinghouse switchboard shall be removed and properly disposed of.

      • All work and repowering the four (4) existing panels from the new MCC shall be done afterhours, on weekends when the facility is not occupied.





  • Contractor shall provide arc flash, short circuit, and coordination study for the entire ALTESS facility including new equipment provided within this service.

  • Disposal: All GE and Westinghouse fused switchboards, panels, wiring, and harnesses to include any associated debris and parts shall be removed and disposed of at an and approved offsite federal, state, and local disposal site by contractor.

  • Anticipated Period of Performance: July 1, 2026 – June 30, 2027.



3.0 Requested Capability Statement



Interested parties are requested to submit a Capability Statement demonstrating their ability to perform the services described in the SOW. Please provide the following information structured in your response:



Requirement Category



Specific Information Requested



Company Profile



Company Name, Address, CAGE Code, and Unique Entity ID (UEI).



Point of Contact



Name, Title, Phone Number, and Email Address of the primary representative.



Business Size & Socio-Economic Status



Specify your business size under the applicable NAICS code (238210 - Electrical Contractors) and any applicable socio-economic categories (e.g., 8(a), SDVOSB, WOSB, HUBZone).



Technical Capability



Detailed narrative demonstrating the capability to provide, install, and customize Eaton (or equal) switchboards/MCCs. Must explicitly address the ability to provide a certified Trane Authorized Controls technician and integrate with Schneider Electric StruxureWare.



Logistics & Security



Statement of ability to conduct required after-hours/weekend repowering work and comply with Radford Army Ammunition Plant (RFAAP) security and background check requirements.



Past Performance



Briefly describe up to three (3) similar projects completed within the last five (5) years involving data center power infrastructure replacement, BAS integration, and secure facility operations.



4.0 Submission Instructions



Responses should be concise and focused on the capability to meet the Government's requirements.



Submission Detail



Instruction



Page Limit



Maximum of ten (10) pages.



Document Format



PDF or Microsoft Word format.



Submission Email



KO heather.b.jarratt.civ@army.mil, CS kenneth.r.lancaster11.civ@army.mil, and CC: sharon.e.bane.civ@army.mil (COR)



Response Deadline



Thursday, May 21, 2026 at 12:00 PM EST



Subject Line



Sources Sought Response: ALTESS Switchboard & MCC Replacement





Disclaimer: Information received in response to this notice will be used solely for market research and acquisition strategy planning. Proprietary information, if any, should be minimized and MUST BE CLEARLY MARKED. To aid the Government, please segregate proprietary information


Attachments/Links
Contact Information
Contracting Office Address
  • DIRECTORATE OF CONTRACTING 1830 QUARTERMASTER RD BLDG 7124
  • FORT LEE , VA 23801
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • May 07, 2026 02:39 pm EDTSources Sought (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow PRE-DEMOLITION SURVEY VARIOUS BUILDINGS NASA WALLOPS FLIGHT FACILITY SURVEY WALLOPS, VA... - ...

DEPT OF DEFENSE

Bid Due: 6/04/2026

...Renovations to approximately 36,385 SF on the second and third floors of the ...

State Government of Virginia

Bid Due: 6/04/2026

...Follow INDIG Village Demolition Active Contract Opportunity Notice ID N0018926QL133 Related Notice... Aside: ...

DEPT OF DEFENSE

Bid Due: 6/18/2026

...Renovations to approximately 36,385 SF on the second and third floors of the ...

State Government of Virginia

Bid Due: 6/04/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.