| Location: | Texas |
|---|---|
| Posted: | Feb 17, 2026 |
| Due: | Feb 24, 2026 |
| Agency: | City of Austin |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 2200 KMF1036 |
| Publication URL: | To access bid details, please log in. |
| Type: |
Invitation For Bids (IFB) |
| Status: | Open |
| Solicitation Number: | IFB 2200 KMF1036 |
| Description: | Production Meter Evaluation and Pitot Testing |
| Summary: | This contract will provide evaluation, testing, analysis, and a comprehensive report on 34 flow metering locations throughout the City. The evaluation and pitot testing will measure meter accuracy by confirming the actual amount of water introduced into the water distribution system from the Davis, Ullrich, and Handcox Water Treatment Plants. |
| Authorized Contact Names: | |
|
Solicitation Specific
Questions: |
Brenita Wilkison (512) 9743164 brenita.selement@austintexas.gov |
|
Small Minority Business
Resources Questions: |
Veronica Hawkins (512) 9749113 smbrcompliancedocuments@austintexas.gov |
| Important Solicitation Dates: | |
|
Solicitation Published: |
01/19/2026 07:20 AM |
|
Response Due: |
Prior to 02/24/2026, 02:00 PM |
|
Response Opening: |
02/24/2026, 03:00 PM |
| Vendor Meetings/Conference, Site Visits (Date/Time): | |
|
Meeting: |
01/27/2026, 11:00 AM See Solicitation Details for more information . |
| Special Notes: |
None Available |
| File Description | Type | Date | |
| Addendum 2-Extension | 02/17/2026 | Download | |
| Addendum #1 | 02/03/2026 | Download | |
| ATTACHMENT - AW-ALL-STN-FacilitySecurity1070-V5.0 | 01/19/2026 | Download | |
| ATTACHMENT - Insurance | docx | 01/19/2026 | Download |
| SUBMITTAL - Employer Certification Wage Theft Ordinance - Responsibility Criteria [Required] | docx | 01/19/2026 | Download |
| SUBMITTAL - Living Wage [Required] | docx | 01/19/2026 | Download |
| SUBMITTAL - Local Business Preference | docx | 01/19/2026 | Download |
| SUBMITTAL - Offeror References [Required] | docx | 01/19/2026 | Download |
| SUBMITTAL - Small Business Preference | docx | 01/19/2026 | Download |
| SUBMITTAL - Subcontracting Plan, No Goals [Required] | docx | 01/19/2026 | Download |
| Solicitation Details, Instructions, Terms and Conditions, and Scope of Work | docx | 02/03/2026 | Download |
| SUBMITTAL - Offer and Acceptance [Required] | docx | 01/19/2026 | Download |
| SUBMITTAL - Prices and Pricing [Required] | xlsx | 02/03/2026 | Download |

With GovernmentContracts, you can:
...distribution system by providing approximately 1,600 linear feet of new 12-inch water line, ...
City of Andrews
Bid Due: 10/20/2026
..., reliability, and sustainability of the community's drinking water distribution system. This... approximately ...
City of Farmers Branch
Bid Due: 11/03/2026
...; 92597-Water Supply, Treatment, And Distribution/Engineering; 92596-Waste Water Treatment... Federal, State and Municipal ...
State Government of Texas
Bid Due: 12/01/2026
...-Construction, Water System/Plants, Main And Service Line; 91391-Maintenance And Repair, Wastewater Treatment... River ...
State Government of Texas
Bid Due: 11/03/2026