| Location: | California |
|---|---|
| Posted: | May 12, 2026 |
| Due: | Jun 23, 2026 |
| Agency: | Los Angeles County Sanitation Districts |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 85D-G-0011 |
| Publication URL: | To access bid details, please log in. |
Dollar Range: Approx. $525,000 to $875,000
Contact
Irene Chang, Ext. 2175
Email: ichang@lacsd.org
Advertise: 5/12/2026
Walk-Through: 5/28/2026 (MANDATORY) @ 10:00 A.M.
Location: 2800 Workman Mill Rd, Whittier, CA 90601
Bid: 6/23/2026 @ 2:00 P.M.
Award: 7/22/2026
Working Days: 180
Obtain and download electronic Bid Documents, Plan Holders List, and Project Bid Results on Quest Construction Data Network (QuestCDN) .
This project will improve the performance of the existing stormwater capture system to minimize stormwater monitoring and sampling frequency. The project includes replacing and upsizing the existing 15 hp storm water pump to 25 hp submersible pump at Drainage Area 3, installation of approximately 1,270 linear feet of 12-inch PVC pipe, and replacing 170 linear feet of 10-inch PVC pipe.