| Location: | Georgia |
|---|---|
| Posted: | Apr 9, 2026 |
| Due: | May 14, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Bid Date: Thursday, May 14, 2026
Bid Time: 10:00 a.m.
Contact: Mandy Soares, (706) 863-8800
Sewerage system rehabilitation including 238 L.F. of 8-inch dig and replace existing sewer line, rehabilitation of and 1,153 L.F. of 8-inch and 4,411 L.F. of 10-inch sanitary sewer sanitary sewer using trenchless pipe replacement, including cleaning, pre and post video, rehabilitating 22 existing manholes, 47 L.F. replace concrete sidewalk, 54 S.Y. asphalt replacement, 10 L.F. remove and replace existing curb and gutter, by-pass pumping, and appurtenances.

With GovernmentContracts, you can:
...booster pumping station building from Gwinnett County Water Resources in March of this ...
State Government of Georgia
Bid Due: 8/19/2026
...decommissioned water booster pumping station located at 2407 Main Street, Duluth Georgia, 30096... ...
City of Duluth
Bid Due: 8/19/2026
..., including, but not limited to, mobilization/demobilization, bonds, insurance, bypass pumping...
City of Covington
Bid Due: 7/30/2026
..., connections to the existing sewer system, bypass pumping, adjustment of an existing ...
State Government of Georgia
Bid Due: 8/27/2026