| Location: | Florida |
|---|---|
| Posted: | Mar 16, 2026 |
| Due: | Apr 8, 2026 |
| Agency: | City of Bradenton |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Progressive Design-Build Services for Lift Station 8 Relocation and Collection System Improvements Phase 1
Addenda: 2
Release Date: 3/11/2026
Due Date: 4/8/2026
The City of Bradenton is seeking proposals from qualified respondents to provide progressive design build services to furnish and install a replacement facility for the existing Lift Station 8 Relocation and Collection System Improvements Phase 1, which shall include an upsized lined wet well, new pumps, upsized discharge piping and all necessary electrical and instrumentation components. The new location will be constructed at 1302 4 th Ave W Bradenton, FL 34205.
The existing lift station sits 12 feet from the Manatee River and is located in an AE FEMA flood zone. As part of the City's ongoing resiliency efforts and hardening of the sanitary collection system, it is prudent to move the lift station out of the floodplain. The City has received grant funding for a portion of the design-build effort and the project is subject to AIS, Davis-Bacon, and other State and Federal requirements attached to funding.

With GovernmentContracts, you can:
...Bid Number: FB-26-0109 Bid Title: Lift Station 4 & Pump Station 8 Rehabilitation ...
City of Flagler Beach
Bid Due: 9/30/2026
...Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date ...
City of Deerfield Beach
Bid Due: 10/08/2026
...Project: Pump Station Control Panels and Other Enclosures Ref. #: ITB-26-00393 Type: ITB ...
Hillsborough County
Bid Due: 9/29/2026
...26-C-00018 26-C-00018 Gunlock Pump Station Force Main Replacement View Details Posted: Tuesday... Project(s): ...
City of Tampa
Bid Due: 10/20/2026