REQUEST FOR COMPETITIVE SEALED PROPOSALS
(RFCSP)
Solicitation No. CO-00900
Sealed proposals are requested by the San Antonio Water System for the for the Steven M. Clouse WRC Biosolids System Upgrades Project, SAWS Job No. 22-6502. The project includes but is not limited to construction of a new centralized biosolids building with new solids screen presses, thickening, and dewatering equipment; new cake storage silos within the building; new maintenance, office, and storage spaces within the building; construction of two new pump stations, parking lot, access road, sidewalks, and yard piping; replacement of pumps, piping, and accessories at two existing pump stations; demolition of the existing sludge screening, thickening, and dewatering facilities; associated site/civil, mechanical, structural, architectural, electrical and instrumentation and controls work.
To view additional project information, as well as obtain the plans and specifications for this project, visit our website located at www.saws.org and click on the Business Center. Then select Bidder, Consultant, and Vendor Registration, which is located on the left-hand side of the screen. Select the Register Now button and proceed with registration.
For difficulties downloading plans and specifications, contact the Contracting Department at 210- 233-3341.
A non-mandatory Pre-Proposal Meeting and Site Visit (immediately following the pre-proposal meeting) will be held at 10:00 AM (CDT) on July 24, 2026, at the Steven M. Clouse Water Recycling Center, Cafeteria, Building 16, 3495 Valley Rd., San Antonio, Texas 78221. See Attachment A, Site Visit Procedures, to attend the Pre-Proposal meeting and Site Visit meeting. Please arrive 30 minutes early to check in at the guard station prior to the non-mandatory Pre-Proposal Meeting.
For questions regarding this solicitation, technical questions or additional information, please contact Stephen Muñiz, Contract Administrator, in writing via email to: stephen.muniz@saws.org until 3:00 PM (CDT) on August 10, 2026. Answers to the questions will be posted to the web site by 3:00 PM (CDT) on August 17, 2026, as a separate document or included as part of an addendum. Be advised that firms responding to this RFCSP ( Respondents) are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or COSA officials regarding this RFCSP up until the contract is awarded as outlined in the Instructions to Respondents .
Proposals will be received electronically only, until 2:00 PM (CDT), September 1, 2026. Electronicproposals will be received via the secure SAWS FTP site. See the Electronic Proposal Opening Instructions attachment for additional information regarding an electronic proposal submittal. Electronic proposals shall be accompanied by a bid bond in an amount not less than five percent of the total proposal price. (Or, if providing SAWS with a cashier's check or certified check in an amount not less than five percent of the total proposal price, SAWS will request this within 24 hours from the Respondent who did not submit a bid bond). Proposals will then be publicly opened and read aloud by Contract Administration via WebEx.
Link: https://saws.webex.com
Meeting Number: 2497 514 1862
Meeting Password: CO-00900
Join by Phone: +1-469-210-7159 US Toll (Dallas)
+1-408-418-9388 US Toll
210-233-2090 Local Only
Respondents will need to submit a request by August 31, 2026, at 2:00 PM (CDT) to receive access to the File Transfer Protocol (FTP) site via email to stephen.muniz@saws.org . Respondent’s email requesting access to the FTP site shall provide the legal name of the Respondent’s company and the intended recipient’s email address and phone number. No requests for FTP site access will be accepted after August 31, 2026, at 2:00 PM (CDT).
|
Evaluation Criteria Form Jul. 17, 2026 |
|
|
|
Specifications: Vol. 1 Jul. 17, 2026 Note: You must be logged in to access this document |
|
|
|
Specifications: Vol. 2 Jul. 17, 2026 Note: You must be logged in to access this document |
|
|
|
Specifications: Vol. 3 Jul. 17, 2026 Note: You must be logged in to access this document |
|
|
|
Specifications: Vol. 4 Jul. 17, 2026 Note: You must be logged in to access this document |
|
|
|
Specifications: Vol. 5 Jul. 17, 2026 Note: You must be logged in to access this document |
|
|
|
Supplement 3 Jul. 17, 2026 Note: You must be logged in to access this document |
|
|
|
Supplement 4 Jul. 17, 2026 Note: You must be logged in to access this document |
|
|
|
Drawings: Vol. 1 Jul. 17, 2026 Note: You must be logged in to access this document |
|
|
|
Drawings: Vol. 2 Jul. 17, 2026 Note: You must be logged in to access this document |
|
|
|
Asbestos Report Jul 17, 2026 Note: You will be prompted to login to access this document. |
|
|
|
Lead Report Jul 17, 2026 Note: You will be prompted to login to access this document. |
|
|
|
Geotechnical Data Report Jul 17, 2026 Note: You will be prompted to login to access this document. |
|
Questions? Please contact
Stephen Muniz
at 210-233-2950
|
Receive Email Updates
|
Registration Agreement
Evaluation Criteria Form
The intent of this document is to provide Respondents a structure for their responses. There are no page limits for the RFCSP, the Evaluation Criteria forms are required forms and do not have page or character limitations.
Respondents should provide answers to the questions below in the order and spaces provided to ensure continuity between Respondent's submissions.
When responding to the questions below, Respondents should use the space provided in this form, unless otherwise indicated.
If all fields are not completed, the proposal may be deemed non-responsive.
1. Team Qualifications and Experience (15 Points)
Organizational Structure and Information of the Prime Contractor
Provide current business organizational structure, type of business structure, and stability of organization.
Provide total number of employees and annual company revenues as of December 31, 2025.
Provide Debarment history for the company for the last ten (10) years.
Provide any litigation, arbitration, and claims history for the last three (3) years and any litigation, arbitration, and claims history with SAWS regardless of the year they occurred.
Indicate the number of years performing contracting/construction work under current legal business name and/or previous legal business name(s).
Provide company financial information as mentioned in the Supplementary Instructions to Respondents.
Proposed Team Structure and Key Personnel Roles and Responsibilities
(Prior to responding to this section, refer to the Supplementary Instructions to Respondents for definitions and other requirements.)
Provide a 1-page organizational chart that describes the composition of the team for this project. The chart shall include proposed Key Personnel for the Prime Contractor and Key Subcontractor(s). The chart shall also include percent availability (as percentage of total individual's workload) for Key Personnel (Prime and Key Subcontractor(s)) and their proposed role for the duration of the Project.
(Insert Organizational Chart here or in the next page.)
Provide a clear description of the proposed team identifying Key Subcontractor(s), their role on the project, and teaming history. If the Prime Contractor has not worked previously with proposed Key Subcontractor(s), describe the proposed approach for ensuring successful completion of the project in accordance with Contract Documents.
(Use the table provided below. Add rows as needed based on the proposed team for this project.)
Describe teaming history between Prime Contractor and proposed Key Subcontractor(s):
Describe Proposed approach for managing Subcontractor(s), including Key Subcontractor(s):
Provide a clear description of the proposed team's Key Personnel roles and responsibilities, including Key Personnel from Key Subcontractor(s).
(Use the table provided below. Add rows as needed based on the proposed team composition for this project.)
Qualifications and Experience of Key Personnel Proposed for this Project
Using separate 8 12" x 11" sheet(s), titled "Team Qualifications and Experience - Resume" inserted immediately following this section:
Provide resumes for Key Personnel for the Prime Contractor and Key Subcontractor(s) identified on the organizational chart, one per person, not to exceed one (1) page each with the Project Manager's resume being first.
(As part of this criteria, use the check boxes below as a checklist to help ensure the information above is understood and information provided follows the guidelines listed above.)
Project Manager's resume is first
Resumes for all Key Personnel for the Prime Contractor have been included
Resumes for all Key Personnel for the Prime Contractor have been identified on the organizational chart
Resumes for all Key Personnel for the Prime Contractor do not exceed one (1) page each
Resumes for all Key Personnel for the Key Subcontractor(s) have been included
Resumes for all Key Personnel for the Key Subcontractor(s) have been identified on the organizational chart
Resumes for all Key Personnel for the Key Subcontractor(s) do no exceed one (1) page each
All resumes provided include the following information:
Name, job title, education
Number of years of total professional experience
Number of years/months with current firm
Number of years/months of experience in proposed role for this project
Description of professional qualifications to include degrees, licenses, certifications, and associations
Brief overview of professional experience
Detailed description of capabilities and experience relevant to this project
List of all other active projects the team member is assigned to for the duration of the Project, to include the phase and percentage of time allocated to each of the other projects. For each project included in each resume, please clearly identify whether the project is with current firm or part of the person's past professional experience.
Note: Insert 1-page resumes here for Key Personnel for the Prime Contractor and Key Subcontractor(s) identified on the organizational chart.)
One (1) resume per page.
END OF TEAM QUALIFICATIONS AND EXPERIENCE CRITERIA
2. Quality, Reputation, and Ability to Deliver Projects on Schedule and within Budget (20 Points)
Prime Contractor On-Time Completion on Similar Projects in the Past twenty (20) Years
Use the tables provided below to respond to the following:
List and describe three (3) completed projects within the last twenty (20) years of similar size, scope, and complexity to the work described in the Contract Documents for this Project. Respondents should provide references with contact information to include a valid, recently verified email and telephone number for each project listed. Projects must be within the U.S.A. but are not limited to only the State of Texas.
Key Personnel must have participated in a minimum of one (1) of the three (3) projects listed. Proposed Project Superintendent must have participated in a minimum of one (1) of the three (3) projects listed. Project Manager must have participated in a minimum of one (1) of three (3) projects listed. Other Key Personnel must have participated in a minimum of one (1) of the three (3) projects listed. Key Personnel's role on project reference must have been the same as the role proposed for this Project.
All reference projects provided must be of similar size, scope, and complexity to the project in the solicitation and must have been completed in the last twenty (20) years
If valid contact information is not provided, the project will not be considered and the Respondent's score for this criterion may be reduced and/or Respondent's proposal may be deemed non-responsive.
Project #1
Project #2
Project #3
The Respondent shall provide a list of all current and recently completed treatment plant construction projects facilities, improvements/expansions to existing wastewater treatment plants, and wastewater facility rehabilitation projects performed in the last five (5) years for all Utility Owners in the State of Texas. Respondent shall provide the following information for each project.
(Use the table provided below to respond. Repeat the table as many times as needed to provide the information requested for all relevant projects.)
Project #1
The Respondent shall provide a list of all projects currently under construction in which Key Personnel are involved, as identified in the organizational chart provided in the response for this RFCSP, and the expected completion date that demonstrates Respondent's ability to start and complete the work required by the project.
(Use the table provided below to respond. Insert additional rows to the table above, as needed.)
Key Subcontractor(s) Performance on Similar Projects in the Past Ten (10) Years
(Use the tables provided below to respond)
Provide a list of two (2) projects that the identified Building Subcontractor has completed within the last ten (10) years. The projects must be of similar size, scope, and complexity to the work described in the Contract Documents. Subcontractor's Project Manager and Project Superintendent shall have participated in a minimum of one of the two (2) projects. Key Personnel's role on project reference must have been the same as the role proposed for this Project.
Provide a list of two (2) projects that the identified Electrical Subcontractor has completed within the last ten (10) years. The projects must be of similar size, scope, and complexity to the work described in the Contract Documents. Subcontractor's Project Manager and Project Superintendent shall have participated in a minimum of one of the two (2) projects. Key Personnel's role on project reference must have been the same as the role proposed for this Project.
Provide a list of two (2) projects that the identified Instrumentation & Controls Subcontractor has completed within the last ten (10) years. The projects must be of similar size, scope, and complexity to the work described in the Contract Documents. Subcontractor's Project Manager and Project Superintendent shall have participated in a minimum of one of the two (2) projects. Key Personnel's role on project reference must have been the same as the role proposed for this Project.
If Prime Contractor is planning to self-perform the Work in accordance with the Contract Documents and no Key Subcontractor(s) have been identified in the Response, Respondent shall provide a list of two (2) additional projects, for each Key Subcontractor role being replaced, that were of similar scope to the Work that would have been performed by the Key Subcontractor being replaced and that have completed in the State of Texas within the last ten (10) years. Prime Contractor's Key Personnel shall have participated in a minimum of one (1) of the two (2) projects listed, for each Key Subcontractor role being replaced. Describe the role served by the proposed staff on those projects.
If valid contact information is not provided, the project will not be considered and the Respondent's score for this criterion may be reduced and/or Respondent's proposal may be deemed non-responsive.
Key Building Subcontractor Performance Project #1
Name of Sub-Contractor:
Key Building Subcontractor Performance Project #2
Name of Sub-Contractor:
Key Electrical Subcontractor Performance Project #1
Name of Sub-Contractor:
Key Electrical Subcontractor Performance Project #2
Name of Sub-Contractor:
Key Instrumentation and Controls Subcontractor Performance Project #1
Name of Sub-Contractor:
Key Instrumentation and Controls Subcontractor Performance Project #2
Name of Sub-Contractor:
c. Prime Contractor Safety Performance on Similar Projects
i. Provide records showing Total Recordable Incident Rate (TRIR) for each year for the past three (3) years for the Prime Contractor with backup documentation. If Respondent's TRIR for any year provided is greater than four (4), the Respondent shall provide documentation detailing measures, additional training, and steps taken to improve Respondent's safety record.
ii. Provide records detailing all formal Complaints, Inquiries, Investigations, and/or Violations by OSHA or any state or local level OSHA program for the past three (3) years for the Prime Contractor with backup documentation.
iii. List all fatalities in the company's safety history for the Prime Contractor. If Respondent has had fatalities in their record, please provide a detailed description of corrective measures taken, new or additional safety training provided, and process improvements made to prevent near-miss incidents and fatalities since the occurrence of the fatality.
Key Subcontractor(s) Safety Performance on Similar Projects
Provide records showing Total Recordable Incident Rate (TRIR) for each year for the past three (3) years for the Key Subcontractor(s) with backup documentation. If Key Subcontractor's TRIR for any year provided is greater than four (4), Respondent shall provide documentation detailing measures, additional training, and steps taken to improve Key Subcontractor's safety record.
Provide records detailing all formal Complaints, Inquiries, Investigations, and/or Violations by OSHA or any state or local level OSHA program for the past three (3) years for Key Subcontractor(s) with backup documentation.
List all fatalities in the company's safety history for the Key Subcontractor(s). If Key Subcontractor(s) had fatalities in their record, please provide a detailed description of corrective measures taken, new or additional safety training provided, and process improvements made to prevent near-miss incidents and fatalities since the occurrence of the fatality.
If valid contact information is not provided, the project will not be considered and the Respondent's score for this criterion may be reduced and/or Respondent's proposal may be deemed non-responsive.
END OF QUALITY, REPUTATION, AND ABILITY TO DELIVER PROJECTS ON SCHEDULE AND WITHIN BUDGET CRITERIA
3. Project Approach, Schedule, and Availability (15 Points)
Project Approach
Provide a narrative of the project approach describing how the Respondent will complete this project. Include key milestones, specific critical processes and critical path items, submittals and shop drawings, phases and/or sequencing, coordination of trades and disciplines, permits, approvals, coordination with SAWS staff, coordination with other contractors and projects, coordination with permitting agencies and project stakeholders, and procurement of critical equipment and materials anticipated to complete the project work. Identify potential risks and describe proposed mitigation measures to ensure on-time completion of the Project.
Explain how Respondent will coordinate with other utility providers (e.g., CPS Energy) involved in the project to ensure timely completion of their activities as they relate to this project. Explain how Respondent will coordinate with Owner's Treatment Operations and Maintenance staff throughout the Project. Describe how the Respondent will coordinate with property owners and business owners being impacted by the Project. Describe the Respondent's approach for securing permits (e.g., ROW, SWPPP, etc.) and/or complying with permit requirements for which the System is the permit holder (TCEQ, EAA, Tree Permit, City of San Antonio, Bexar County, etc.).
Provide a description of proposed sequence of critical path construction activities, coordination with subcontractors for various trades and disciplines, advanced coordination with Owner, pre-commissioning plan and preparation, post-commissioning plan, post-commissioning demolition plan and other creative means to ensure the facility always remains fully operational. Provide a description of any proposed shutdown plans, sequence of critical path construction activities, coordination with subcontractors for various trades and disciplines, advanced coordination with Owner, pre-shutdown plan and preparation, post-shutdown plan, and opportunities for reduced downtime.
Provide a description of the approach specifically addressing the procurement of the following items: dewatering and thickening centrifuges; pumps; motors; polymer systems; cake hoppers; electrical equipment including variable frequency drives (VFDs) and motor control centers (MCCs); instrumentation and controls equipment including programmable logic controllers (PLCs), electrical actuators, and servers/switches; large quantity concrete deliveries for the construction of the building; and any other equipment and materials that the contractor anticipates having a long lead time and potential impacts to the schedule.
Provide any innovative ideas for cost savings (construction sequencing, method or construction duration, supply chain management and logistics, procurement of critical items, and availability of materials and equipment) for this project.
Provide a Quality Management Plan (QMP) describing how the Prime Contractor will ensure that the necessary steps, safeguards, subcontractor oversight, QC processes, and document controls will be implemented in a rigorous manner as to ensure the completeness, workmanship, accuracy, and timely completion of the Project.
Project Schedule and Unforeseen Conditions
Provide a critical path method (CPM) schedule in Primavera or Microsoft Project. The schedule shall include milestones, specific critical processes and critical path items, construction phases, permits and approvals, coordination with stakeholders, security clearances, and procurements anticipated to complete the project work. The anticipated notice to proceed (NTP) for this Project is November 16, 2026. Respondent shall use this date for developing the proposed project schedule.
Use separate sheet(s), titled "Project Approach including Delivery Schedule - CPM Milestone Schedule" inserted immediately following this Section. 11" x 17" paper is permitted.
Explain how Respondent will complete the project within the schedule taking into account the existing commitments identified in Section 2.a.iv.
.
Identify long-lead time items and critical path shop drawing submittals.
Provide details for the procurement and delivery of dewatering and thickening centrifuges, pumps, motors, polymer tanks, cake hoppers, electrical, instrumentation and controls equipment, large quantity concrete deliveries for the construction of the building and other equipment and/or materials that the contractor anticipates having a long lead time and potential impacts on the schedule
Describe the Respondent's approach towards mitigating and managing unforeseen conditions should they be encountered during the construction of this Project
From past project experience, list and describe any previous instances in which the Contractor has encountered unforeseen conditions.
Identify whether a recovery plan was required.
Describe the nature of the issue and whether it was promptly resolved or resulted in the Respondent being asked to demobilize.
As part of the criteria, use the check boxes below as a checklist to help ensure guidelines are met. Repeat the table below as many times as needed to provide the information requested.
Describe the Respondent's approach towards mitigating and managing unforeseen conditions should they be encountered during the construction of this Project.
SAWS, in reviewing Respondents' proposals, is looking for Respondents that can meet all necessary milestones and complete the work within the Contract time given for completion. A Respondent's inability to meet milestones and complete the Work in the time provided may result in the Respondent's score for these criteria being reduced and/or Respondent's proposal deemed non-responsive.
Availability of Key Personnel and Equipment
Describe availability of Key Personnel (Respondent and Key Subcontractor(s)) that will be specifically assigned to this Project.
Describe availability of equipment and facilities that will be specifically utilized for this Project.
Corresponding with the organizational chart provided, list the available workforce for the various disciplines required for this project including the number of work crews, and number of personnel for each skill classification proposed to complete the work.
END OF PROJECT APPROACH, SCHEDULE, AND AVAILABILITY CRITERIA
| Team Member | Company Name | Proposed Role | Worked with in the Past |
|---|---|---|---|
| Prime Contractor | |||
| Key Subcontractor #1 | Yes No | ||
| Key Subcontractor #2 | Yes No | ||
| Key Subcontractor #3 | Yes No | ||
| Key Subcontractor #4 | Yes No | ||
| Key Subcontractor #5 | Yes No |
| Team Member | Proposed Key Personnel Role | Name of Key Personnel | Included in Org Chart? |
|---|---|---|---|
| Prime Contractor | Project Manager | Yes No | |
| Prime Contractor | Project Superintendent | Yes No | |
| Prime Contractor | Other: | Yes No | |
| Key Subcontractor #1 | Project Manager | Yes No | |
| Superintendent | Yes No | ||
| Other: | Yes No | ||
| Key Subcontractor #2 | Project Manager | Yes No | |
| Superintendent | Yes No | ||
| Other: | Yes No | ||
| Key Subcontractor #3 | Project Manager | Yes No | |
| Superintendent | Yes No | ||
| Other: | Yes No |
| Project Name: | |
|---|---|
| Utility/Owner name: | |
| Utility/Owner Project Manager's name and contact information to include a valid, recently verified email and telephone number: | |
| Proposed Contractor's Key Personnel who participated on this project: | |
| Key Personnel's role on this project: | |
| Project completed within the last twenty (20) years: | Yes No |
| Project has similar size, scope, and complexity to the work described in the Contract Documents: | Yes No |
| Detailed project description and explanation for why it is comparable to the size, scope and complexity for this item: (Note: please include sufficient project details so similarity and applicability of project reference can be determined. Include details like facility footprint, greenfield or rehabilitation, wastewater treatment facility capacity in mdg, hydraulic throughput per thickening and dewatering centrifuge unit in gpm, number and model of thickening and dewatering centrifuges, capacity of pump station in mgd, number of pumps, type of pumps, capacity of each pump (gpm or mgd), materials of construction for yard piping and pipe diameter, building modifications (if any), shutdowns duration, original vs new capacity of wastewater treatment plant, building construction, and other specific project details.) | |
| Original bid/price and final construction in place costs: | |
| Total costs for all change orders, as well as an explanation regarding the reason for specific change orders: | |
| Construction Contract Notice to Proceed (NTP) Date: | |
| Identify whether the project was completed on-time and within budget: | On-time: Yes No Within budget: Yes No |
| Original Contract Time (specify Calendar Days or Working Days): | |
| Original Contract Substantial Completion Date and Actual Substantial Completion Date: | |
| Original Contract Completion Date and Actual Completion Date: | |
| Actual number of days beyond the original contract: | |
| Actual number of days added through change orders. If Contract time extensions were added to the contract as a result of Prime Contractor's responsibilities, provide a short explanation of each. | |
| The recovery schedule/plan and implementation of such, if it was required. If a recovery/plan schedule was implemented, describe whether the project was successfully brought back on schedule. Please discuss, as necessary and deemed appropriate. | |
| Brief description of the respondent's approach to successful teamwork with the Utility/Owner and/or Engineer. |
| Project Name: | |
|---|---|
| Utility/Owner name: | |
| Utility/Owner Project Manager's name and contact information to include a valid, recently verified email and telephone number: | |
| Proposed Contractor's Key Personnel who participated on this project: | |
| Key Personnel's role on this project: | |
| Project completed within the last twenty (20) years: | Yes No |
| Project has similar size, scope, and complexity to the work described in the Contract Documents: | Yes No |
| Detailed project description and explanation for why it is comparable to the size, scope and/or complexity for this item: (Note: please include sufficient project details so similarity and applicability of project reference can be determined. Include details like facility footprint, greenfield or rehabilitation, wastewater treatment facility capacity in mdg, hydraulic throughput per thickening and dewatering centrifuge unit in gpm, number and model of thickening and dewatering centrifuges, capacity of pump station in mgd, number of pumps, type of pumps, capacity of each pump (gpm or mgd), materials of construction for yard piping and pipe diameter, building modifications (if any), shutdowns duration, original vs new capacity of wastewater treatment plant, building construction, and other specific project details.) | |
| Original bid/price and final construction in place costs: | |
| Total costs for all change orders, as well as an explanation regarding the reason for specific change orders: | |
| Construction Contract Notice to Proceed (NTP) Date: | |
| Identify whether the project was completed on-time and within budget: | On-time: Yes No Within budget: Yes No |
| Original Contract Time (specify Calendar Days or Working Days): | |
| Original Contract Substantial Completion Date and Actual Substantial Completion Date: | |
| Original Contract Completion Date and Actual Completion Date: | |
| Actual number of days beyond the original contract: | |
| Actual number of days added through change orders. If Contract time extensions were added to the contract as a result of Prime Contractor's responsibilities, provide a short explanation of each. | |
| The recovery schedule/plan and implementation of such, if it was required. If a recovery/plan schedule was implemented, describe whether the project was successfully brought back on schedule. Please discuss, as necessary and deemed appropriate. | |
| Brief description of the respondent's approach to successful teamwork with the Utility/Owner and/or Engineer. |
| Project Name: | |
|---|---|
| Utility/Owner name: | |
| Utility/Owner Project Manager's name and contact information to include a valid, recently verified email and telephone number: | |
| Proposed Contractor's Key Personnel who participated on this project: | |
| Key Personnel's role on this project: | |
| Project completed within the last twenty (20) years: | Yes No |
| Project has similar size, scope, and complexity to the work described in the Contract Documents: | Yes No |
| Detailed project description and explanation for why it is comparable to the size, scope and/or complexity for this item: (Note: please include sufficient project details so similarity and applicability of project reference can be determined. Include details like facility footprint, greenfield or rehabilitation, wastewater treatment facility capacity in mdg, hydraulic throughput per thickening and dewatering centrifuge unit in gpm, number and model of thickening and dewatering centrifuges, capacity of pump station in mgd, number of pumps, type of pumps, capacity of each pump (gpm or mgd), materials of construction for yard piping and pipe diameter, building modifications (if any), shutdowns duration, original vs new capacity of wastewater treatment plant, building construction, and other specific project details.) | |
| Original bid/price and final construction in place costs: | |
| Total costs for all change orders, as well as an explanation regarding the reason for specific change orders: | |
| Construction Contract Notice to Proceed (NTP) Date: | |
| Identify whether the project was completed on-time and within budget: | On-time: Yes No Within budget: Yes No |
| Original Contract Time (specify Calendar Days or Working Days): | |
| Original Contract Substantial Completion Date and Actual Substantial Completion Date: | |
| Original Contract Completion Date and Actual Completion Date: | |
| Actual number of days beyond the original contract: | |
| Actual number of days added through change orders. If Contract time extensions were added to the contract as a result of Prime Contractor's responsibilities, provide a short explanation of each. | |
| The recovery schedule/plan and implementation of such, if it was required. If a recovery/plan schedule was implemented, describe whether the project was successfully brought back on schedule. Please discuss, as necessary and deemed appropriate. | |
| Brief description of the respondent's approach to successful teamwork with the Utility/Owner and/or Engineer. |
| Project Name: | |
|---|---|
| Utility / Owner Name: | |
| Contact Information: | |
| Date of Notice to Proceed: | |
| Original Contract Time (calendar days or working days): | |
| Original Contract Completion Date: | |
| Actual Contract Completion Date (if not complete, provide % complete based on Contract Time): | |
| Original Bid Price / Price Proposal: | |
| Final Construction In-place Cost (if not complete, provide percent (%) complete based on Contract Value and most recent application for payment): | |
| Was the project completed on-time? | Yes No |
| Was the project completed within budget? | Yes No |
| Key Personnel Name | Company Affiliation | Project Name | % Time Allocated | Project Completion Date |
|---|---|---|---|---|
| Project Name: | |
|---|---|
| Identify if the Project was performed by Sub-Contractor or if Prime Contractor Self-Performed | |
| Utility/Owner name: | |
| Utility/Owner Project Manager's name: and contact information to include a valid, recently verified email and telephone number: | |
| Proposed Key Subcontractor's Key Personnel who participated on this project: | |
| Key Personnel's role on this project: | |
| Project completed within the last ten (10) years: | Yes No |
| Sub-Contractor's Key Personnel involved in this Project were identified on the organizational chart: | Yes No |
| Project has similar size, scope, and complexity to the work described in the Contract Documents: | Yes No |
| Detailed project description and explanation for why it is comparable to proposed Key Subcontractor's role on the Project: | |
| Original bid/price and final construction in place costs: | |
| Total costs for all change orders, as well as an explanation regarding the reason for specific change orders: | |
| Construction Contract Notice to Proceed (NTP) Date: | |
| Identify whether the Project was completed on-time and within budget: | On time: Yes No Within budget: Yes No |
| Original Contract Time (specify Calendar Days or Working Days): | |
| Original Contract Substantial Completion Date and Actual Substantial Completion Date: | |
| Original Contract Completion Date and Actual Completion Date: | |
| Actual number of days beyond the original contract: | |
| Actual number of days added through change orders. If Contract time extensions were added to the contract as a result of Key Sub-Contractor's responsibilities, provide a short explanation of each. | |
| The recovery schedule/plan and implementation of such, if it was required. If a recovery/plan schedule was implemented, describe whether the project was successfully brought back on schedule. Please discuss, as necessary and deemed appropriate. |
| Project Name: | |
|---|---|
| Identify if the Project was performed by Sub-Contractor or if Prime Contractor Self-Performed | |
| Utility/Owner name: | |
| Utility/Owner Project Manager's name: and contact information to include a valid, recently verified email and telephone number: | |
| Proposed Key Subcontractor's Key Personnel who participated on this project: | |
| Key Personnel's role on this project: | |
| Project completed within the last ten (10) years: | Yes No |
| Sub-Contractor's Key Personnel involved in this Project were identified on the organizational chart: | Yes No |
| Project has similar size, scope, and complexity to the work described in the Contract Documents: | Yes No |
| Detailed project description and explanation for why it is comparable to proposed Key Subcontractor's role on the Project: | |
| Original bid/price and final construction in place costs: | |
| Total costs for all change orders, as well as an explanation regarding the reason for specific change orders: | |
| Construction Contract Notice to Proceed (NTP) Date: | |
| Identify whether the Project was completed on-time and within budget: | On time: Yes No Within budget: Yes No |
| Original Contract Time (specify Calendar Days or Working Days): | |
| Original Contract Substantial Completion Date and Actual Substantial Completion Date: | |
| Original Contract Completion Date and Actual Completion Date: | |
| Actual number of days beyond the original contract: | |
| Actual number of days added through change orders. If Contract time extensions were added to the contract as a result of Key Sub-Contractor's responsibilities, provide a short explanation of each. | |
| The recovery schedule/plan and implementation of such, if it was required. If a recovery/plan schedule was implemented, describe whether the project was successfully brought back on schedule. Please discuss, as necessary and deemed appropriate. |
| Project Name: | |
|---|---|
| Identify if the Project was performed by Sub-Contractor or if Prime Contractor Self-Performed | |
| Utility/Owner name: | |
| Utility/Owner Project Manager's name: and contact information to include a valid, recently verified email and telephone number: | |
| Proposed Key Subcontractor's Key Personnel who participated on this project: | |
| Key Personnel's role on this project: | |
| Project completed within the last ten (10) years: | Yes No |
| Sub-Contractor's Key Personnel involved in this Project were identified on the organizational chart: | Yes No |
| Project has similar size, scope, and complexity to the work described in the Contract Documents: | Yes No |
| Detailed project description and explanation for why it is comparable to proposed Key Subcontractor's role on the Project: | |
| Original bid/price and final construction in place costs: | |
| Total costs for all change orders, as well as an explanation regarding the reason for specific change orders: | |
| Construction Contract Notice to Proceed (NTP) Date: | |
| Identify whether the Project was completed on-time and within budget: | On time: Yes No Within budget: Yes No |
| Original Contract Time (specify Calendar Days or Working Days): | |
| Original Contract Substantial Completion Date and Actual Substantial Completion Date: | |
| Original Contract Completion Date and Actual Completion Date: | |
| Actual number of days beyond the original contract: | |
| Actual number of days added through change orders. If Contract time extensions were added to the contract as a result of Key Sub-Contractor's responsibilities, provide a short explanation of each. | |
| The recovery schedule/plan and implementation of such, if it was required. If a recovery/plan schedule was implemented, describe whether the project was successfully brought back on schedule. Please discuss, as necessary and deemed appropriate. |
| Project Name: | |
|---|---|
| Identify if the Project was performed by Sub-Contractor or if Prime Contractor Self-Performed | |
| Utility/Owner name: | |
| Utility/Owner Project Manager's name: and contact information to include a valid, recently verified email and telephone number: | |
| Proposed Key Subcontractor's Key Personnel who participated on this project: | |
| Key Personnel's role on this project: | |
| Project completed within the last ten (10) years: | Yes No |
| Sub-Contractor's Key Personnel involved in this Project were identified on the organizational chart: | Yes No |
| Project has similar size, scope, and complexity to the work described in the Contract Documents: | Yes No |
| Detailed project description and explanation for why it is comparable to proposed Key Subcontractor's role on the Project: | |
| Original bid/price and final construction in place costs: | |
| Total costs for all change orders, as well as an explanation regarding the reason for specific change orders: | |
| Construction Contract Notice to Proceed (NTP) Date: | |
| Identify whether the Project was completed on-time and within budget: | On time: Yes No Within budget: Yes No |
| Original Contract Time (specify Calendar Days or Working Days): | |
| Original Contract Substantial Completion Date and Actual Substantial Completion Date: | |
| Original Contract Completion Date and Actual Completion Date: | |
| Actual number of days beyond the original contract: | |
| Actual number of days added through change orders. If Contract time extensions were added to the contract as a result of Key Sub-Contractor's responsibilities, provide a short explanation of each. | |
| The recovery schedule/plan and implementation of such, if it was required. If a recovery/plan schedule was implemented, describe whether the project was successfully brought back on schedule. Please discuss, as necessary and deemed appropriate. |
| Project Name: | |
|---|---|
| Identify if the Project was performed by Sub-Contractor or if Prime Contractor Self-Performed | |
| Utility/Owner name: | |
| Utility/Owner Project Manager's name: and contact information to include a valid, recently verified email and telephone number: | |
| Proposed Subcontractor's Key Personnel who participated on this project: | |
| Key Personnel's role on this project: | |
| Project completed within the last ten (10) years: | Yes No |
| Sub-Contractor's Key Personnel involved in this Project were identified on the organizational chart: | Yes No |
| Project has similar size, scope, and complexity to the work described in the Contract Documents: | Yes No |
| Detailed project description and explanation for why it is comparable to proposed Key Subcontractor's role on the Project: | |
| Original bid/price and final construction in place costs: | |
| Total costs for all change orders, as well as an explanation regarding the reason for specific change orders: | |
| Construction Contract Notice to Proceed (NTP) Date: | |
| Identify whether the Project was completed on-time and within budget: | On time: Yes No Within budget: Yes No |
| Original Contract Time (specify Calendar Days or Working Days): | |
| Original Contract Substantial Completion Date and Actual Substantial Completion Date: | |
| Original Contract Completion Date and Actual Completion Date: | |
| Actual number of days beyond the original contract: | |
| Actual number of days added through change orders. If Contract time extensions were added to the contract as a result of Key Sub-Contractor's responsibilities, provide a short explanation of each. | |
| The recovery schedule/plan and implementation of such, if it was required. If a recovery/plan schedule was implemented, describe whether the project was successfully brought back on schedule. Please discuss, as necessary and deemed appropriate. |
| Project Name: | |
|---|---|
| Identify if the Project was performed by Sub-Contractor or if Prime Contractor Self-Performed | |
| Utility/Owner name: | |
| Utility/Owner Project Manager's name: and contact information to include a valid, recently verified email and telephone number: | |
| Proposed Subcontractor's Key Personnel who participated on this project: | |
| Key Personnel's role on this project: | |
| Project completed within the last ten (10) years: | Yes No |
| Sub-Contractor's Key Personnel involved in this Project were identified on the organizational chart: | Yes No |
| Project has similar size, scope, and complexity to the work described in the Contract Documents: | Yes No |
| Detailed project description and explanation for why it is comparable to proposed Key Subcontractor's role on the Project: | |
| Original bid/price and final construction in place costs: | |
| Total costs for all change orders, as well as an explanation regarding the reason for specific change orders: | |
| Construction Contract Notice to Proceed (NTP) Date: | |
| Identify whether the Project was completed on-time and within budget: | On time: Yes No Within budget: Yes No |
| Original Contract Time (specify Calendar Days or Working Days): | |
| Original Contract Substantial Completion Date and Actual Substantial Completion Date: | |
| Original Contract Completion Date and Actual Completion Date: | |
| Actual number of days beyond the original contract: | |
| Actual number of days added through change orders. If Contract time extensions were added to the contract as a result of Key Sub-Contractor's responsibilities, provide a short explanation of each. | |
| The recovery schedule/plan and implementation of such, if it was required. If a recovery/plan schedule was implemented, describe whether the project was successfully brought back on schedule. Please discuss, as necessary and deemed appropriate. |
| Company Name(s) | Total Recordable Incident Rate (TRIR) | Total Recordable Incident Rate (TRIR) | Total Recordable Incident Rate (TRIR) |
|---|---|---|---|
| Company Name(s) | 2025 | 2024 | 2023 |
| Prime Contractor |
| Company Name(s) | Total Recordable Incident Rate (TRIR) | Total Recordable Incident Rate (TRIR) | Total Recordable Incident Rate (TRIR) |
|---|---|---|---|
| Company Name(s) | 2025 | 2024 | 2023 |
| Key Subcontractor #1 | |||
| Key Subcontractor #2 | |||
| Key Subcontractor #3 |
| Project Name: | |
|---|---|
| Utility / Owner Name: | |
| Date of Notice to Proceed: | |
| Original Contract Time (calendar days or working days): | |
| Original Contract Completion Date: | |
| Did Project encounter Unforeseen Conditions? | Yes No |
| Describe the nature of the Unforeseen Conditions Issue | |
| Was a Recovery Plan Required? | Yes No |
| Was the Issue Promptly Resolved? | Yes No |
| Was Respondent asked to Demobilize? | Yes No |
| Was Recovery Plan Implemented? | Yes No |
| Was the Project completed On-Time? | Yes No |
| Actual Contract Completion Date: |

With GovernmentContracts, you can:
...Follow BUFFALO MONITOR WELL PLUGGING 2026 Active Contract Opportunity Notice ID 140L0626Q0017... Monitoring ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 9/02/2026
...Follow F--JELA Well Plugging - 2026 Active Contract Opportunity Notice ID 140PS126B0009 Related...: ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 9/03/2026
...Follow GRAY WALL LIVESTOCK WATER WELL Active Contract Opportunity Notice ID 140L0626Q0015 Related... ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 9/08/2026
...of Dry-Well Submersible Pump IFB Purchasing 8/24/2026 9/10/2026 03:00:00 PM (CT)...
San Antonio Water System
Bid Due: 9/10/2026