REQUEST FOR PROPOSALS
Turn-Key Construction of Gunnison County Impound Building
Issued By:
Gunnison County
200 E. Virginia Ave., Gunnison, CO 81230
Contact:
John Cattles, Assistant County Manager for Operations & Sustainability
Email: jcattles@gunnisoncounty.org
Introduction & Purpose
Gunnison County is soliciting fixed-fee, turn-key construction proposals for a new Impound
Building. Fully engineered plans are attached.
Gunnison County wishes to construct the building before the end of the year 2026.
Project Description
Construction of a 43’ x 30’ engineered shop/garage structure per attached drawings.
Heating system to be air-source mini-split.
No water or sewer services.
Contractor must include extension of electric service from transformer to the East of the
site.
Scope of Work
Turn-key delivery including all materials, labor, subcontractor work, utilities, finishes, and
commissioning.
Site visit
Site visit is encouraged and can be arranged by contacting John Cattles at
jcattles@gunnisoncounty.org
Bid Requirements
Bids must include breakdowns for materials, labor, subcontractors, overhead, and profit.
Bond & Insurance Requirements
Proposers must provide proof of general liability insurance and a letter of intent from their
surety indicating bonding capacity su^icient for the project.
Proposal Submission Instructions
Bids are due Monday, August 24 at 5:00 PM. Proposals must be submitted via email to
jcattles@gunnisoncounty.org.
Selection Process
Evaluation based on clarity, experience, cost structure, and schedule.
Attachments
Engineered Plan Set: “26-0056 Gunnison County – 43x30 Garage” (dated 08/06/26).
Proposal Submission Form
Company Name:
_____________________________________________
Primary Contact:
_____________________________________________
Email:
_____________________________________________
Phone Number:
_____________________________________________
Business Address:
_____________________________________________
Total Fixed Bid Amount:
_____________________________________________
Material Cost Breakdown: (attach material list)
_____________________________________________
Labor Cost Breakdown:
_____________________________________________
Subcontractor Cost Breakdown:
_____________________________________________
Overhead & Profit:
_____________________________________________
Proposed Schedule:
_____________________________________________
Bonding Capacity Letter Attached (Yes/No):
_____________________________________________