| Location: | California |
|---|---|
| Posted: | May 5, 2026 |
| Due: | May 26, 2026 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: GENERAL MUNICIPAL IMPROVEMENTS JOB ORDER CONTRACT 2026-2027 FOR INTERGOVERNMENTAL SERVICE AGREEMENT (IGSA) PROJECTS
Addenda: 0
Release Date: 5/5/2026
Due Date: 5/26/2026
This is a job order contract, which shall be used to provide the City with a readily available workforce for repairs, alterations to existing facilities, emergency repairs and new construction, as the City deems appropriate. In general, the work consists of repair, alteration, replacement and construction of municipal improvements including, but not limited to, curbs, gutters, sidewalks, sidewalk crossings, curb ramps, cross gutters, concrete and hot mix asphalt, dikes, decomposed granite sidewalks, retaining walls, storm drain systems, sewer line systems, lighting, brick surfacing, paver surfacing, interlocking pavers, sawcutting uplifted portions of sidewalks and miscellaneous associated work at such times and locations as required. The work shall be located in the Presidio of Monterey, Ord Military Community, and Camp Roberts - United States Army Signal Activity POM Enclave (CR-UPE).

With GovernmentContracts, you can:
...Contact: Eric van Leeuwen E-Mail 19-745-016 PLANT MIX ASPHALT CONCRETE - EAST SLOPE ...
El Dorado County
Bid Due: 9/14/2028
...of roadway with asphalt concrete. Base Estimate Range between $394,900 and $482,000 06/18/2026 ...
County of San Joaquin
Bid Due: 6/18/2026
...rubberized cape seal, repairing, and resurfacing approximately 4.4 miles of roadway with asphalt ...
County of San Joaquin
Bid Due: 6/25/2026
..., in general, consists of repairing and resurfacing approximately 4.40 miles of roadway ...
County of San Joaquin
Bid Due: 6/18/2026