| Location: | Montana |
|---|---|
| Posted: | Jan 14, 2025 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 69056725C000006 |
| Publication URL: | To access bid details, please log in. |
MT FLAP BOR 2980(1), Sun River Bridge Replacement
Helena-Lewis and Clark National Forest, Lewis and Clark County, Teton County, Montana
The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge.
The project includes construction of a 3 span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. Abutments are founded on both spread footing and piles within an MSE wall fill. Piers are supported on 10 foot diameter drilled shafts. The work may include as an Option demolition of the existing steel truss bridge upon completion of the new structure.
Project length: 0.36 miles

With GovernmentContracts, you can:
...Follow Repair Launch Facility Concrete Active Contract Opportunity Notice ID FA462626R0013 Related... Concrete ...
DEPT OF DEFENSE
Bid Due: 8/04/2026
...Follow Repair Launch Facility Concrete Active Contract Opportunity Notice ID FA462626R0013 Related... (PUBLIC ...
Federal Agency
Bid Due: 8/04/2026
...Follow GAOA Concrete Vault Toilet Installation Active Contract Opportunity Notice ID 1240BH26Q0033... Concrete ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 7/28/2026
...Rehabilitation/Renovation,Concrete Repair ,Concrete Walkway,Doors and Windows,Electrical,Flooring/Carpeting..., Pavement Resurface and Rehabilitation, Lamp/Lighting Interior/Exterior, Concrete ...
St. Louis Housing Authority
Bid Due: 8/27/2026