| Location: | Montana |
|---|---|
| Posted: | Jan 14, 2025 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 69056725C000006 |
| Publication URL: | To access bid details, please log in. |
MT FLAP BOR 2980(1), Sun River Bridge Replacement
Helena-Lewis and Clark National Forest, Lewis and Clark County, Teton County, Montana
The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge.
The project includes construction of a 3 span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. Abutments are founded on both spread footing and piles within an MSE wall fill. Piers are supported on 10 foot diameter drilled shafts. The work may include as an Option demolition of the existing steel truss bridge upon completion of the new structure.
Project length: 0.36 miles

With GovernmentContracts, you can:
...Demolition and Removal State-Owned Property - 1016 Kern Street, Missoula MDT is seeking ...
State Government of Montana
Bid Due: 11/13/2026
...Demolition and Removal State-Owned Property - 1010 South Russell Street, Missoula MDT is ...
State Government of Montana
Bid Due: 11/13/2026
...consists of: * Demolition of existing digester gas piping, valves, gas safety equipment, ...
City of Billings
Bid Due: 11/04/2026
...consists of: * Demolition of existing digester gas piping, valves, gas safety equipment, ...
City of Billings
Bid Due: 11/04/2026