| Location: | Kentucky |
|---|---|
| Posted: | Mar 16, 2026 |
| Due: | Mar 31, 2026 |
| Agency: | Louisville & Jefferson County Metropolitan Sewer District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 16369 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes the replacement of an 84”x84” gate along with the actuator, stem, stem guides, and other gate appurtenances as required by the manufacturer. This project also includes the replacement of a hydraulic power unit, hydraulic hoses, connections and valves, ventilation upgrades, and associated electrical work as defined in the contract drawings and specifications. This project is located at the 4th Street Flood Pumping Station located at 326 West Main Street, Louisville, KY, 40202.

With GovernmentContracts, you can:
..., electrical, and control systems to extend their service life and ensure compliance ...
The Transit Authority of River City
Bid Due: 8/31/2026
...listed. Assess the current condition of each AHU, including mechanical, electrical, and control... ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/18/2026