Open & Competitive Opportunity
• Invitation to Bid
Mackenzie Regional Waste Management Commission
The scope of work for Cell 7 Construction – Phase II Clay Liner and Leachate Collection
System includes, but is not limited to, the following:
1. Rough grading to design grades for Cell 7, roads, and ditching.
2. Hauling, placing, compaction and moisture conditioning a 600 mm thick compacted
clay liner.
3. Subgrade preparation of Cell 7.
4. Supply and installation of the double-sided textured HDPE geomembrane including
all tie-ins to Cell 6 and anchor trenches.
5. Supply and installation of geosynthetic clay liner in leachate trenches and leachate
sump.
6. Supply and installation of geocomposite over the side slopes of Cell 7, and in the
leachate trenches and leachate sump.
7. Supply and installation of non-woven protection geotextile over the HDPE
geomembrane in the cell base.
8. Third-party leak detection testing for the HDPE liner.
9. Supply, loading, hauling and installation of 300mm thick sand protection layer over
the base of the cell.
10. Supply, loading, hauling and installation of 300mm thick drainage layer over the
sand protection layer.
11. Supply and installation of non-woven separation geotextile over the drainage rock
layer.
12. Supply and installation of perforated and non-perforated leachate collection pipes,
including geosynthetics clay liner (GCL), bedding sand, geotextile, geocomposite,
and drainage rock in leachate trenches, as shown on the drawings.
13. Rough grading of the intermediate berm, intermediate berm drainage, and leachate
sump access pad.
14. Subgrade preparation of the access road and leachate sump access pad.
15. Supply, and install of culverts including rip rap, bedding sand, and geotextile as
shown in the drawings.
16. Landscaping including supply and installation of topsoil layer placement and
hydroseeding in ditches as shown on the drawings.
17. Dewatering as required.
18. All associated works to meet the design intent of Cell 7.
APC Reference #
AB-2026-00400
Category
Construction
Posting Date • Time
Jan 15, 2026 • 2:11 pm (MT)
Closing Date • Time
Feb 5, 2026 • 2:00:00 pm (MT)
Region(s) of Delivery
Alberta, High Level
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.