BRT Steam Vault Renewal

Location: Ohio
Posted: May 4, 2026
Due: Jun 4, 2026
Agency: Ohio Facility Construction Commission
Type of Government: State & Local
Category:
  • D - Automatic Data Processing and Telecommunication Services
Solicitation No: OSU-260140
Publication URL: To access bid details, please log in.
Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated Project Cost Q&A Short List Notes
2026/05/04 6/4/2026 OSU-260140 The Ohio State University Local Higher Education BRT Steam Vault Renewal A/E TBD N/A TBD

Attachment Preview

Request for Qualifications (Registered Design Professional*)
State of Ohio Standard Forms and Documents
Administration of Project: Local Higher Education
Project Name BRT Steam Vault Renewal
Project Location Biomedical Research Tower (0112)
City / County Columbus / Franklin
Owner
The Ohio State University
Delivery Method General Contracting
No. of paper copies requested (stapled, not bound)
0
Response Deadline 06/04/2026
2:00 PM local time
Project Number
OSU-260140
Project Manager
Al Stazzone
Contracting Authority Local Higher Education
Prevailing Wages State
No. of electronic copies requested (PDF)
1
* “Registered Design Professional includes any architect holding a certificate issued under section 4703.10 of the Revised
Code, any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or any engineer
holding a certificate issued under section 4733.14 of the Revised Code.” (Ohio Building Code section 4101:1-2-01 Definitions)
Submit the Statements of Qualifications (Form F110-330) via email to 330Submittals@osu.edu. In the subject line, include the
project number and name for RFQ you are responding to. See Section J of this RFQ for additional submittal instructions.
Submit all questions regarding this RFQ in writing to Al Stazzone at stazzone.1@osu.edu with the project number included in
the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC
website at https://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the party
submitting a question will not be included on the Q&A document.
Project Overview
A. Project Description
The Ohio State University is seeking qualifications from firms to relocate the university maintained High-Pressure Steam
station and equipment from the Biological Research Tower (BRT) steam vault to mechanical room 190M in the facility
The selected AE will be expected to use Target Value Budget/Design to align scope and cost to maximize alignments
based on the approved budget.
The proposed project delivery method for this project is General Contracting.
The university will be part of the selection process for selection of the Hazardous Material Consultant.
BIM and LEED will not be part of this project.
This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of
meeting this prerequisite and is responsible to support their consultants to meet this requirement. The Asset Tagging
Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website
(https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards;
Building Information Modeling (BIM).
B. Scope of Services
This request is for Architect/Engineer (A/E) to provide full engineering, design and construction management services.
The initial design documents shall include initial site planning and project phasing options. These initial documents will
develop performance requirements for vehicle and pedestrian circulation, the analysis of temporary steam to minimize
impacts on the Biological Research Tower mission. Services will also include Hazardous Material verification and cost
estimating services.
The project and construction budget as listed in this RFQ is estimated.
For projects advertised with an appropriately developed Program of Requirements (POR), upon award of the Agreement,
commence with Design. For projects without such a POR, upon award of the Agreement, commence by developing the
Program of Requirements.
The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf.
F110-02-2024-OCT
Publish Date: [leave blank]
Page 1 of 5
Request for Qualifications (Registered Design Professional) continued
The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and
clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed
cost components to address the Owner’s project requirements. Participate in the Encouraging Growth, Diversity & Equity
(EDGE) Program as required by statute and the Agreement. Required Professional Liability Insurance will be per Exhibit A
– A/E Terms and Conditions Article 7.2.6.
As required by the Agreement, and as properly authorized, provide the following categories of services: Program
Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support,
Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types.
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required
for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.
The selected A/E will be required to sign the standard agreement. No modifications to the requirements in the agreement
will be accepted.
During the construction period, provide not less than 8 hours (excluding travel time) on-site construction administration
services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site
representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having
relevant and appropriate types of construction administration experience.
The project team (Owner / A/E / Contractor) will be required to utilize the University’s Project Management System, for all
compatible services required by the University.
The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors,
and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within
Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here:
https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.”
Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using the
e-Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio
State University Project Closeout Standards can be accessed via the OSU FOD vender resource website
(https://fod.osu.edu/resources) under Post Construction / Close Out.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. High Pressure Steam Systems
2. Mechanical Engineering
3. Civil Engineering
4. Structural Engineering
5. Hazardous Materials
6. Sustainable Design Experience
For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330),
projects must be designed by the Lead Firm.
C. Estimated Budget / Funding
State Funding:
$0
Other Funding:
$2,600,000
Construction Cost: $2,000,000
Total Project Cost: $2,600,000
D. Anticipated Schedule
Professional Services Start:
Construction Notice to Proceed:
Substantial Completion of all Work:
Professional Services Completed:
08 / 26
05 / 27
05 / 28
07 / 28
E. Estimated Basic Fee Range (see note below)
F. EDGE Participation Goal
7.54% to 9.05%
Percent of initial Total A/E Fee:
5%
NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents,
(5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. The
Basic Fee includes all professional design services and consultant services necessary for proper completion of the Basic Services, including
F110-02-2024-NOV
Publish Date: [leave blank]
Page 2 of 5
Request for Qualifications (Registered Design Professional) continued
validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules for the
project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above. The Basic
Fee excludes any Additional Services required for the project.
G. Basic Service Providers Required (see note below)
Lead A/E Discipline: Mechanical Engineering
Secondary
Civil Engineering
Disciplines:
Structural Engineering
H. Additional Service Providers Required
Survey
Hazardous Material Consultant
NOTE: The lead A/E shall be (1) any architect holding a certificate issued under section 4703.10 of the Revised Code, (2) any landscape
architect holding a certificate issued under section 4703.36 of the Revised Code, or (3) any engineer holding a certificate issued under section
4733.14 of the Revised Code.
I. Evaluation Criteria for Selection
Demonstrated ability to meet Owner’s programmed project vision, scope, budget, and schedule on previous
projects.
Demonstrated ability to meet Owner’s Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf.
Previous experience compatible with the proposed project (e.g., type, size).
Relevant past work of prospective firm’s proposed consultants.
Past performance of prospective firm and its proposed consultants.
Qualifications and experience of individuals directly involved with the project.
Proposer’s previous experience (numbers of projects, sizes of projects) when working with its proposed
consultants.
Design quality and demonstrated ability of prospective firm and its proposed consultants to provide design
services which represent the University’s Design Guidelines for Buildings and Landscape buildings-
landscape.pdf
Specification writing credentials and experience.
Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPM
schedules as a project management resource.
Approach to and success of using partnering and Alternative Dispute Resolution.
Proximity of prospective firms to the project site.
Proposer’s apparent resources and capacity to meet the needs of this project.
The selected A/E and all its consultants must have the capability to use the Internet within their normal business
location(s) during normal business hours.
Interested A/E firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program
form in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract
with and use EDGE-certified Business Enterprise(s), as a part of the A/E’s team. The Intent to Contract and to Perform
and / or waiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must be
attached to the A/E’s Technical Proposal. Both forms can be accessed via the OFCC website at https://ofcc.ohio.gov. The
Intent to Contract and to Perform form is again required at the Fee Proposal stage.
If the A/E firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a
completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform forms
signed by both parties with its Statement of Qualifications.
For all Statements of Qualifications, please identify the EDGE-certified Business Enterprises, by name, which will
participate in the delivery of the proposed professional services solicited in the RFQ.
F110-02-2024-NOV
Publish Date: [leave blank]
Page 3 of 5
Request for Qualifications (Registered Design Professional) continued
Interested A/E firms must indicate on their Statement of Qualifications, the locations where their services will be
performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D
related to providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting
purchases from or investment in any Russian institution or company. Failure to do so may cause their Statement of
Qualifications to be rejected.
J. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at https://ofcc.ohio.gov.
Electronic submittals should be combined into one PDF file saved with the form name, project number listed on the RFQ
and your firm’s name (ex. F110-330_OSU-nnnnnn_Firm Name). Use the “print” feature of Adobe Acrobat or similar
software for creating a PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go
to Advanced, then PDF Optimizer.
Statements of Qualifications must be submitted electronically by email. Submittals are limited to one email with a
maximum file size of 25 MB.
Firms are requested to identify professional registrations, memberships, and credentials including: LEED GA, LEED AP,
LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.
Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.
F110-02-2024-NOV
Publish Date: [leave blank]
Page 4 of 5
Architect / Engineer Selection Rating Form
State of Ohio Standard Forms and Documents
Project Name BRT Steam Vault Renewal
Project Number OSU-260140
Proposer Firm
City, State, Zip
Selection Criteria
1. Primary Firm Location, Workload and Size (Maximum 10 points)
a. Proximity of firm to project site
b. Amount of fees awarded by Contracting Authority in
previous 24 months
c. Number of licensed professionals
Less than 50 miles
50 miles to 100 miles
More than 100 miles
Less than $200,000
$200,000 to $1,000,000
More than $1,000,000
Less than 2 professionals
2 to 10 professionals
More than 10 professionals
2. Primary Firm Qualifications (Maximum 30 points)
a. Project management lead
b. Project design lead
c. Technical staff
d. Construction administration staff
Experience / ability of project manager to
manage scope / budget / schedule / quality
Experience / creativity of project designer to
achieve owner’s vision and requirements
Experience / ability of technical staff to create
fully coordinated construction documents
Experience / ability of field representative to
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 20 points)
a. Key discipline leads
b. Proposed EDGE-certified Consultant participation*
Experience / ability of key consultants to
perform effectively and collaboratively
One point for every 2 percent increase in
professional services over the EDGE
participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration
b. OSU Sustainability Standards or LEED** project
experience
c. BIM project experience
d. Team organization
Less than 2 sample projects
2 to 4 sample projects
More than 4 sample projects
LEED v4.0 or v4.1 projects
OSU Sustainability Standards projects
Training and knowledge
Direct project experience
Clarity of responsibility / communication
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance
b. Experience with similar projects / delivery methods
c. Budget and schedule management
d. Knowledge of Ohio Capital Improvements process
Past performance as indicated by
evaluations and letters of reference
Less than 3 projects
3 to 6 projects
More than 6 projects
Performance in completing projects within
original construction budget and schedule
Less than 3 projects
3 to 6 projects
More than 6 projects
Value
5
5
5
1
2
2
0
1
2
Max
=3
0 - 10
0 - 10
0-5
0-5
Max
= 20
0 - 15
0-5
1
2
3
Max
=3
1
Max
2
=2
1
Max
3
=3
0-2
0 - 10
0-3
4-6
7 - 10
0-5
0-1
2-3
4-5
Score
* Must be comprised of professional design services consulting firm(s) and NOT the lead firm – For more
information on scoring this and other criteria refer to Document F199-01 – PS Selection Rating Rubric.
** Leadership in Energy & Environmental Design administered by Green Building Certification Inc.
Notes:
Evaluator:
Name
Subtotal
F110-02-2024-OCT
Signature
Publish Date: [leave blank]
Date
Page 5 of 5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Local Higher Education Mansfield - Ovalwood Chiller & Cooling Tower Replacement A/E $1,699,000 ...

Ohio Facility Construction Commission

Bid Due: 6/09/2026

...Solicitation Type Description Close 26-05-139 RFQ Outdoor Metal Storage Shed Replacement Project at ...

Cuyahoga Metropolitan Housing Authority

Bid Due: 6/19/2026

...Follow Request for White Paper_Landing Gear Test Facility (LGTF) Drop Tower Modernization... for ...

DEPT OF DEFENSE

Bid Due: 7/01/2026

.... Lowest and best bid will be awarded the project. Ship To P005006 ...

State Government of Ohio

Bid Due: 6/09/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.