| Location: | North Carolina |
|---|---|
| Posted: | Oct 1, 2026 |
| Due: | Nov 3, 2026 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY27-ITBCon-27 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Project consists of two
separate projects, 805 Lynn St. and 3653 Trailer Dr. The proposed plans for the 805 Lynn St. project calls for installation of 308LF of 48" RCP along a new alignment that shifts the system away from the apartment complex. There is also a 139LF section of 15" RCP to be CIPP lined. 3653 Trailer Dr. aims to realign the existing 24" system to a new outfall point into the stream. The design also requires lining 100LF of 24" CMP with CIPP at the upstream end of the system. The estimated cost for this project is $1,397,338.

With GovernmentContracts, you can:
...Project: 9832 Grasmere Drive Storm Drainage Improvement Project Ref. #: FY27-ITBCON-25 Department.... Storm ...
City of Charlotte
Bid Due: 11/05/2026
...Project: Storm Water Repair and Improvement FY2027-D-PR Ref. #: FY27-ITBCon-34 Department... this contract ...
City of Charlotte
Bid Due: 11/19/2026
...Project: Collective Storm Drainage Improvement Project - Series AJ Ref. #: FY27-ITBCon-19...@charlottenc.gov Close ...
City of Charlotte
Bid Due: 12/03/2026
...Project: 9832 Grasmere Drive Storm Drainage Improvement Project Ref. #: FY27-ITBCON-25 Department.... Storm ...
City of Charlotte
Bid Due: 11/05/2026