| Location: | California |
|---|---|
| Posted: | Feb 7, 2025 |
| Due: | Mar 19, 2025 |
| Agency: | Los Angeles County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | BRC0000582 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | BRC0000582 | ||
| Title: | Camp Glenn Rockey Security System Upgrades Project | ||
| Department: | Public Works | ||
| Bid Type: | Construction | Bid Amount: |
N/A |
| Commodity: | CONSTRUCTION SERVICE, GENERAL (DIGGING, DITCHING, ROAD GRADI | ||
| Description: |
The proposed Scope of Work for this project includes multiple enhancements to existing security infrastructure, including installation of a new security booth approximately 8-feet by 6-feet and one camera post, which would augment video monitoring of activities in the parking lot; installation of a new speed bump at the driveway entry; the addition of code compliant accessible path of travel to the facility entrance; installation of a new backup generator with a 24-hour fuel tank; replacement of existing manual transfer switch with an automatic transfer switch; and the addition of an annunciator panel and appurtenant electrical upgrades at the pump house. The generator would provide supplemental backup power to support uninterrupted flow of water to the facility. Additionally, the existing nonnative trees that are required to be removed would be replaced with live oak trees at the pump house location. To view, print or download the project documents, please visit https://dpw.lacounty.gov/contracts/Opportunities.aspx
The proposed Scope of Work for this project includes multiple enhancements to existing security infrastructure, including installation of a new security booth approximately 8-feet by 6-feet and one camera post, which would augment video monitoring of activities in the parking lot; installation of a new speed bump at the driveway entry; the addition of code compliant accessible path of travel to the facility entrance; installation of a new backup generator with a 24-hour fuel tank; replacement of existing manual transfer switch with an automatic transfer switch; and the addition of an annunciator panel and appurtenant electrical upgrades at the pump house. The generator would provide supplemental backup power to support uninterrupted flow of water to the facility. Additionally, the existing nonnative trees that are required to be removed would be replaced with live oak trees at the pump house location.
To view, print or download the project documents, please visit https://dpw.lacounty.gov/contracts/Opportunities.aspx |
||
| Open Day: | 2/4/2025 | Close Date: |
3/19/2025 11:00:00 AM |
| Contact Name: | Michael Sanchez | Contact Phone: | (626) 300-2085 |
| Contact Email: | misanchez@dpw.lacounty.gov | ||
| Last Changed On: | 2/6/2025 7:03:33 PM |

With GovernmentContracts, you can:
...a Government Furnished 200kW Generator with an automatic transfer switch. Project will require ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/16/2026