IFB - Toepfert Apts Roof Replacement

Location: Massachusetts
Posted: Mar 19, 2025
Due: Apr 3, 2025
Agency: Commonwealth of Massachusetts
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: BD-22-1857-HKEHA-HKEHA-114187
Publication URL: To access bid details, please log in.

Bid Solicitation: BD-22-1857-HKEHA-HKEHA-114187
Header Information
Bid Number:
BD-22-1857-HKEHA-HKEHA-114187
Description:
IFB - Toepfert Apts Roof Replacement
Bid Opening Date:
04/03/2025 02:00:00 PM
Purchaser:
Janara Healy
Organization:
Holyoke Housing Authority
Department:
HKEHA - Holyoke Housing Authority
Location:
HKEHA - Holyoke Housing Authority
Fiscal Year:
22
Type Code: Allow Electronic Quote:

No
Alternate Id:

Required Date:
Available Date
:
03/19/2025 12:00:10 PM
Info Contact: Bid Type:
OPEN
Informal Bid Flag:

No
Purchase Method:
Open Market
Pre Bid Conference:
Voluntary Pre-Bid Site Visit - 3/19/2025 @ 10AM, 22 North Summer St. Holyoke MA 01040
Bulletin Desc:
The work consists of:
1. Removal and disposal of existing roofing, including but not limited to PVC membrane, insulation, and flashing, disconnection
2. Disconnection, removal, and replacement of existing HVAC equipment
3. Installation of new EPDM roofing system, including but not limited to insulation, coverboard, and blocking
4. Storm drainage piping to connect the existing roof drain lines to existing site storm drain main lines
BIDDERS: DO NOT PROVIDE QUOTE VIA COMMBUYS
Ship-to Address:
Janara Healy
475 Maple Street
Holyoke, MA 01040
US
Email: jhealy@holyokehousing.org
Phone: (413)539-2217
FAX: (413)539-2227
Bill-to Address:
Janara Healy
475 Maple Street
Holyoke, MA 01040
US
Email: jhealy@holyokehousing.org
Phone: (413)539-2217
FAX: (413)539-2227
Print Format:
Bid Print
Required Quote Attachments
Item Information

Item # 1:

(

72-13

-
00

)



The work consists of:
1. Removal and disposal of existing roofing, including but not limited to PVC membrane, insulation, and flashing, disconnection
2. Disconnection, removal, and replacement of existing HVAC equipment
3. Installation of new EPDM roofing system, including but not limited to insulation, coverboard, and blocking
4. Storm drainage piping to connect the existing roof drain lines to existing site storm drain main lines
BIDDERS: DO NOT PROVIDE QUOTE VIA COMMBUYS

U N S P S C Code:
72-13-00
General building construction

Qty Unit Cost UOM Total Discount Amt. Total Cost

1.0




EA - Each








Manufacturer:

Brand:

Model:

Make:

Packaging:




Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...a catastrophic failure of the existing Ethylene Propylene Diene Monomer (EPDM) rubber roof ...

COMMERCE, DEPARTMENT OF

Bid Due: 6/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.