Tucson Street Improvements from Olive Avenue to Aspen Avenue including Intersection Improvements at Olive Avenue
| Location: |
Oklahoma |
| Posted: |
Mar 4, 2025 |
| Due: |
Mar 28, 2025 |
| Agency: |
City of Broken Arrow |
| Type of Government: |
State & Local |
| Category: |
- Z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No: |
9559880 |
| Publication URL: |
To access bid details, please log in. |
|
Post Date
|
03/04/2025
|
|
Quest Number
|
9559880
|
|
Category Code
|
Architectural/Engineering Services (RFP/RFQ),Design Engineering Services
|
|
Bid/Request Name
|
Tucson Street Improvements from Olive Avenue to Aspen Avenue including Intersection Improvements at Olive Avenue
|
|
Bid Closing Date
|
03/28/2025 03:00 PM CDT
|
|
City
|
Broken Arrow
|
|
County
|
Tulsa
|
|
State
|
OK
|
|
Owner
|
Broken Arrow, City of
|
|
Soliciator
|
Broken Arrow, City of
|
|
Posting Type
|
Request For Qualifications
|
Location Details
|
City:
|
Broken Arrow
|
|
|
County:
|
Tulsa
|
|
|
State/Province:
|
OK
|
|
Request Details
|
Closing Date:
|
Fri, 03/28/2025 03:00 PM CDT
|
|
|
Request Response Information:
|
All A/E firms interested in this project must submit a Statement of Qualifications (SOQ) in accordance with the Statement of Qualifications Requirements. All SOQ’s must be submitted no later than 3:00 pm on March 28, 2025 and should be addressed to Charlie Bright, P.E., Director of the Engineering & Construction, City of Broken Arrow, 485 N. Poplar Avenue, Broken Arrow, Oklahoma, 74012, with the following label: “Tucson Street Improvements from Olive Avenue to Aspen Avenue Including Intersection Improvements at Olive Avenue”.
|
|
Request Description
|
Request Category Code:
|
Architectural/Engineering Services (RFP/RFQ), Design Engineering Services
|
|
|
Description:
|
The project includes the design and production of contractor bid documents for the widening and improvements of an existing two-lane roadway located on Tucson Street between Olive Avenue and Aspen Avenue including the intersection of Tucson Street and Olive Avenue. Tucson Street is a 2-lane asphaltic concrete roadway in this location, with an existing bridge structure. The existing structure is a 3-cell 8’ x 8’ x 48’ RCB, skewed, constructed in 2007. An ODOT Bridge Inspection Report (CN 77, NBI 28736), is attached for reference. This project will also include the design of improvements or replacement of the existing bridge.
|
|
Primary Contact Information
Owner Details
|
Owner Name:
|
Broken Arrow, City of
|
|
|
Address:
|
220 S. First Street, Broken Arrow, OK - 74012
|
|
|
Phone:
|
918-259-7000 x5414
|
|
|
Contact:
|
Jordan Grace
|
|
|
Email:
|
JGrace@brokenarrowok.gov
|
|
Solicitor Details
|
Solicitor Name:
|
Broken Arrow, City of
|
|
|
Design Discipline:
|
Soliciting agent
|
|
|
Address:
|
220 S. First Street, Broken Arrow, OK - 74012
|
|
|
Phone:
|
918-259-7000 x5414
|
|
|
Contact:
|
Jordan Grace
|
|
|
Email:
|
jgrace@brokenarrowok.gov
|
|
Request Document Information
|
Quest eBidDoc™ Delivery Info:
|
Download delivery fee is $0.00 , file size is 2 MB .
Preview
Download
|
|
You must be a plan holder to enter an Online Bid. Do you want to continue?
Yes No
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.