27C-430-1780 Fiske School Playground Installation Project (Labor Only)
| Location: |
Massachusetts |
| Posted: |
Apr 8, 2026 |
| Due: |
Apr 23, 2026 |
| Agency: |
Commonwealth of Massachusetts |
| Type of Government: |
State & Local |
| Category: |
- Y - Construction of Structures and Facilities
|
| Solicitation No: |
BD-26-1344-00400-00410-127521 |
| Publication URL: |
To access bid details, please log in. |
|
Header Information
|
|
Bid Number:
|
BD-26-1344-00400-00410-127521
|
Description:
|
27C-430-1780 Fiske School Playground Installation Project (Labor Only)
|
Bid Opening Date:
|
04/23/2026 03:00:00 PM
|
|
Purchaser:
|
George Saraceno
|
Organization:
|
Town of Wellesley
|
|
Department:
|
00400 - Public Works
|
Location:
|
00410 - Public Works - Engineering
|
|
Fiscal Year:
|
26
|
Type Code:
|
SS - Statewide Solicitation
|
Allow Electronic Quote:
|
Yes
|
|
Alternate Id:
|
|
Required Date:
|
04/02/2026
|
Available Date
:
|
04/08/2026 12:00:00 AM
|
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
Pre-bid Conference 4/15/2026 at 10:00 AM Fiske School Playgrounds (non-mandatory)
|
|
Bulletin Desc:
|
The project involves work on two separate playgrounds at the Fiske School referred to as the Upper and Lower Playground Areas. The Lower Playground area is proposed to remove and replace the existing playground, including engineered wood fiber and pip walkways. The Upper Playground Areas consist of removing EWF, pip walkways, and swing set. Most of the playground Equipment will remain with some modifications to the existing equipment. Both Upper and Lower Playgrounds.
|
|
|
Ship-to Address:
|
Doug Stewart
20 Municipal Way
Public Works
Engineering
Wellesley, MA 02481
US
Email: dstewart@wellesleyma.gov
Phone: (781) 235-7600 Ext. 3300
|
Bill-to Address:
|
Jan Oleson
20 Municipal Way
Public Works
Engineering Accounts Payable
Wellesley, MA 02481
US
Email: joleson@wellesleyma.gov
Phone: (781) 235-7600 Ext. 3300
|
Print Format:
|
Bid Print
|
File Attachments:
|
NOTICE TO BIDDERS~1.pdf
|
Form Attachments:
|
|
|
Required Quote Attachments
|
|
|
Item # 1:
(
49-24
-
15
)
|
The project involves work on two separate playgrounds at the Fiske School referred to as the Upper and Lower Playground Areas. The Lower Playground area is proposed to remove and replace the existing playground, including engineered wood fiber and pip walkways. The Upper Playground Areas consist of removing EWF, pip walkways, and swing set. Most of the playground Equipment will remain with some modifications to the existing equipment. Both Upper and Lower Playgrounds will include a timber edging and wall in some locations as shown on the plans. The property is owned by the Town of Wellesley and is under the jurisdiction of the School Department. The project design is by the Department of Public Works in conjunction with the DPW Park and Tree Division. Project oversight will be by the Town of Wellesley DPW Park & Tree Division.
|
|
U N S P S C Code:
|
49-24-15
Playground equipment
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.