| Location: | New York |
|---|---|
| Posted: | Apr 23, 2025 |
| Due: | May 16, 2025 |
| Agency: | The New York State Contract Reporter |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Description: Implementation of a road closure and detour plan, removal of the existing culvert and replacement with a new precast concrete three-sided frame founded on cast-in-place concrete stub walls and footings, all necessary excavations and backfilling to set the new culvert, cast-in-place concrete wingwalls, temporary waterway diversion structures and cofferdams, new steel bridge railing, new box beam guide rail installation, and site restoration. The total reconstruction length is approximately 125 feet. Due Date: 05/16/2025 10:00 AMContract Term: 1 year Location: Columbia County Route 7, Town of Austerlitz Ad Type: General
|

With GovernmentContracts, you can:
...in length. There are also options for aluminum railings & hand rails and ...
DEPT OF DEFENSE
Bid Due: 8/05/2026
...spalled and/or cracked concrete. Clean and paint steel elements such as doors, railings, ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 8/03/2026
...protection specialties; stairs and railings; and installation of loading dock and food service ...
State Government of New York
Bid Due: 8/17/2026