| Location: | Pennsylvania |
|---|---|
| Posted: | Oct 1, 2026 |
| Due: | Nov 4, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Duncannon Borough, Perry County |
| Publication URL: | To access bid details, please log in. |
Project Description: This Project involves the replacement of the water main under Lincoln Street and 2nd Alley from Cherry Street to North High Street in Duncannon Borough. The contractor's scope of work shall include excavation for test pits and removal of rock as necessary, installation and connection of the proposed 6-inch ductile iron water main to the existing water system, the installation of 4-inch and 6-inch gate valves, valve boxes, ductile iron fittings, and a fire hydrant connection as well as the installation of copper service lines, two ADA ramps, bituminous paving and final restoration of all disturbed areas.

With GovernmentContracts, you can:
...Follow Seaport - CTF Design Services Follow On Active Contract Opportunity Notice ID ...
DEPT OF DEFENSE
Bid Due: 11/06/2026
...Facility: North Shore Garage Project: Design-Build Service - Dry Standpipe System Replacement Pre...
Sports & Exhibition Authority of Pittsburgh and Allegheny County (SEA)
Bid Due: 11/30/2026
...Follow Seaport - CTF Design Services Follow On Active Contract Opportunity Notice ID ...
DEPT OF DEFENSE
Bid Due: 11/06/2026
...Project: Request for Proposals Consulting Design and Engineering Services For Southside Community... of ...
PennBid
Bid Due: 11/09/2026