| Location: | Iowa |
|---|---|
| Posted: | Nov 1, 2024 |
| Due: | Nov 7, 2024 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912EK25_Lock19_Industry_Day |
| Publication URL: | To access bid details, please log in. |
This event is an opportunity for contractors, engineering firms, and other interested parties to learn more about the upcoming Lock & Dam 19 Project. The project will include extending the riverwall upstream, constructing a bulkhead sill, and constructing bulkhead recesses on the new riverwall extension and existing landwall to allow future dewatering. USACE is requesting input on construction means and methods, construction phasing, and structure of the contract.
The morning session will include a presentation and Q&A opportunity at the Keokuk Public Library (Round Room). After the presentation and Q&A session, attendees are invited to visit the Lock 19.
Locations
Keokuk Public Library
210 n. 5th St.
Keokuk, IA 52632
Lock 19
525 North Water Street
Keokuk, IA 52632
Lock 19 Industry Day Agenda
10:00am – Project Presentation at Keokuk Public Library
Following Presentation – Site Visit to Lock 19
Whether you are a Small or Large Business I encourage you to take advantage of these types of events to network and build those relationships for future collaboration as a prime or subcontractor. The Attendee List will be shared for potential networking opportunities.
A Registration link for the industry day is below.
https://forms.osi.apps.mil/r/n30CTqdjqn

With GovernmentContracts, you can:
...-509-1373 Construction manager: Claire Vorthmann cev@iastate.edu 515-686-0957 Design Professional... West Des Moines Iowa ...
Iowa State University
Bid Due: 10/13/2026
...Construction manager: Claire Vorthmann cev@iastate.edu 515-686-0957 Design Professional: Alyssa Iverson...@mbionline.com McGraw-Hill Construction Dodge ...
Iowa State University
Bid Due: 10/29/2026
...Cho namho-cho@uiowa.edu Estimated Construction Cost: $159,503.00 Pre Bid Date: 9/29/26 Pre Bid... Location: ...
University of Iowa Facilities Management
Bid Due: 10/14/2026
...estimated construction cost range for this project is $150,000 to $250,000. Completion Dates...: ...
State Government of Iowa
Bid Due: 10/27/2026