| Location: | Pennsylvania |
|---|---|
| Posted: | Nov 10, 2025 |
| Due: | Dec 10, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | South Middleton Township Municipal Authority, Cumberland County |
| Publication URL: | To access bid details, please log in. |
Project Description: The work includes all material, labor, and equipment necessary for the replacement of the pumping station including the installation of two new pumps and controls, grinder pit and valve vault, and new flowmeter and including piping, valves, and electrical work as shown on the drawings and as specified, and the replacement of the forcemain in the same trench. This includes bypass pumping and demolition of existing equipment. The project is located in South Middleton Township, Cumberland County.

With GovernmentContracts, you can:
.... * Excavation, stockpiling and backfilling. * Connection to existing electrical utilities * ...
PennBid
Bid Due: 6/19/2026
...Construction and Contract 2026-02E: Electrical Construction Ref. #: Doylestown Township Municipal Authority... County, ...
PennBid
Bid Due: 6/11/2026
...County, PA Design Firm: Ebert Engineering Project Description: The New Morgan Borough Utilities... ...
PennBid
Bid Due: 6/17/2026
...Construction and Contract 2026-02E: Electrical Construction Ref. #: Doylestown Township Municipal Authority... County, ...
PennBid
Bid Due: 7/09/2026