| Location: | South Carolina |
|---|---|
| Posted: | Nov 10, 2025 |
| Due: | Dec 9, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H27-Z550 |
| Publication URL: | To access bid details, please log in. |
The project consists of the full remodeling of 1,772 sf of office area to be used as a research lab to include demolition, spatial reconfiguration new finishes, plumbing, mechanical, electrical and fire protection systems. The project also includes 4,283 sf of installation of new flooring. ceiling and wall finishes.

With GovernmentContracts, you can:
...Method: Design-Bid-Build Construction Cost Range: $2,000,000 to $2,500,000 Agency Project Coordinator... suspended ceilings, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $1,750,000 to $2,250,000 Agency Project... in a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...:00pm Project Location: 4700 Broad River Road, Columbia SC Project Delivery Method: Design-Bid-Build...-filter, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/06/2026
...elevation boardwalk and structures; electrical and mechanical improvements; plumbing; playground.../contractors for Construction Manager ...
City of Clemson
Bid Due: 6/30/2026