| Location: | Illinois |
|---|---|
| Posted: | May 19, 2025 |
| Due: | Jun 4, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W519TC-25-R-A009 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Army Contracting Command - Rock Island is issuing this pre-solicitation synopsis for W519TC-25-R-A009.
This pre-solicitation synopsis is notice regarding the Repair of the Southwest Patio on Quarters 1 on the Rock Island Arsenal, Rock Island, IL.
This requirement will be a 100% total small business set-aside.
This is a notice that a solicitation is anticipated to be forthcoming and will have all the necessary documents, including a scope of work.
IAW FAR 36.204(e), the magnitude of this project is between $500,000.00 and $1,000,000.00.
Performance and Payment Bonds are required.
The scope of this project includes the demolition of approximately 1,000 square feet (s.f.) of existing composite concrete on metal deck patio slab and associated stairs and railings. Construction of a new composite patio slab will include an integral drainage plane and be sloped for drainage to the south. Steel structure will be added to the top of existing wide flange beams to achieve the desired slab slope. New stairs, railings, and a handicap accessible ramp will be added to improve access to the building.
Three manholes will be removed along with corresponding abandoned drainpipe. Three new storm manholes will be added along with corresponding drainpipe, sump pit, trench drain, and connections to mitigate storm water on the site. A new sewer manhole and sewer pipe will be installed to allow for the installation of the new handicap ramp.
| Jun 5, 2025 | [Solicitation (Original)] Quarters 1 - Southwest Patio Repair |
| Jun 18, 2025 | [Solicitation (Updated)] Quarters 1 - Southwest Patio Repair |
| Jun 30, 2025 | [Solicitation (Updated)] Quarters 1 - Southwest Patio Repair |

With GovernmentContracts, you can:
Follow RFI-Portfolio Management Support Active Contract Opportunity Notice ID TRANSCOM26D005 Related Notice Department/Ind.
DEPT OF DEFENSE
Bid Due: 6/18/2026
Follow Building 138 Repair/Repurpose Active Contract Opportunity Notice ID W519TC-26-R-A032 Related Notice W519TC-26-R-A032
DEPT OF DEFENSE
Bid Due: 6/23/2026
Follow Cooling plate machining Active Contract Opportunity Notice ID RFP382985 Related Notice Department/Ind.
ENERGY, DEPARTMENT OF
Bid Due: 6/22/2026
Follow PLA Survey - Brandon Road Interbasin Project - Increment II - Flushing
DEPT OF DEFENSE
Bid Due: 6/16/2026