| Location: | Federal |
|---|---|
| Posted: | Mar 5, 2025 |
| Due: | Mar 19, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W9128F25SM025 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This Sources Sought is being issued for market research purposes and as part of the resolicitation of Ground Based Strategic Deterrent (GBSD) Integrated Training Center (ITC), F.E. Warren Air Force Base (AFB), Wyoming (WY). The previous Solicitation Number was W9128F24R0034. Please note a Project Labor Agreement is not anticipated as per Class Deviation (CD) 2025-O0002 - Waiver of Project Labor Requirements effective 07 February 2025.
THIS NOTICE IS FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID. NO SOLICITATION IS CURRENTLY AVAILABLE.
The U.S. Army Corps of Engineers, Omaha District is conducting market research to identify sources (Small Businesses and Other-than-Small Businesses) that have the knowledge, skills and capability to perform the work concerning the potential project described below. Responses are requested only from: POTENTIAL PRIME CONSTRUCTION CONTRACTORS WITH COMPANY BONDING CAPABILITY (SINGLE JOB) OF AT LEAST $75M. The responses to this source sought announcement will be used by the Government to make appropriate acquisition decisions for this project.
Responses are to be sent via email to brandon.p.landis@usace.army.mil no later than 2:00 p.m. CDT, 19 March 2025. Questions or concerns surrounding small business matters can be sent to cenwo-sb@usace.army.mil. Please include the Sources Sought Notice Identification Number in the Subject line of any email submission.
Magnitude of Construction: Disclosure of the magnitude of construction, as prescribed in FAR 36.204 and DFARS 236.204, is between $25M and $100M. This project will be primarily funded with MILCON-appropriated dollars. The magnitude of construction for this specific project is projected between $75M and $100M.
Project Location and Description: Construction of the GBSD ITC at F.E. Warren AFB, WY will consist of a two-story structure with a single-story, high-bay volume, stand-alone building. The facility will contain classrooms, administration space, virtual training areas, and training spaces for Security Forces, Cyber Defense, and Operations. The single-story volume contains the maintenance training functions that require high-bay space for vehicles, cranes, and other equipment required for the training mission.The facility will consist of steel-framing and columns on a concrete slab-on-grade, meeting all seismic and mission requirements. Exterior cladding will consist of precast concrete walls with brick wainscot, insulated metal panel accents, and standing seam roof. Building support spaces will include electrical/mechanical service and distribution components/systems, water and sewer, fire protection, lightning protection, security, and communication systems. The second floor of the facility will require secure construction built to Intelligence Community Directive (ICD) 705 Technical Specifications for construction and management of Sensitive Compartmented Information Facilities (SCIF). Additional security may be required within portions of the facility based upon determination for clearance levels based on the training curriculum. Site improvements include clearing, grubbing, grading, minor demolition, paving, walkways, and storm drainage.
Project Period of Performance: 1,095 Calendar Days from construction notice to proceed (NTP).
Project Labor Agreement Requirements: As described above a Project Labor Agreement is not anticipated as per Class Deviation (CD) 2025-O0002 - Waiver of Project Labor Requirements effective 07 February 2025.
Submission Details: All interested, capable, qualified (under NAICS code 236220 – Commercial and Institutional Buidling Construction) and responsive contractors are encouraged to reply to this market survey request. Interested PRIME CONTRACTORS ONLY should submit a narrative demonstrating their experience in construction projects of similar nature for each facility as described above. Narratives shall be no longer than 10 pages. E-mail responses are required.
Please include the following information in your response/narrative:
Responses will be shared with Government personnel and the project management team on a need-to-know basis, but otherwise will be held in strict confidence.
PLEASE NOTE: AT THIS TIME, WE ARE ONLY INTERESTED IN RESPONSES FROM COMPANIES WHO HAVE THE ABILITY TO BE PRIME CONTRACTORS WITH BONDING CAPABILITY (SINGLE JOB) OF AT LEAST $75M. ESTIMATED CONSTRUCTION CONTRACT AWARD WILL BE FIRST/SECOND QUARTER OF FISCAL YEAR 2026.
Telephone inquiries will NOT be accepted.

With GovernmentContracts, you can:
...cyclic maintenance project replaces an aging/obsolete fire alarm control panel (FACP) at the ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 7/06/2026
...Aside: Product Service Code: K042 - MODIFICATION OF EQUIPMENT- FIRE FIGHTING/RESCUE/SAFETY EQUIPMENT... of ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/22/2026
...Aside: Product Service Code: K042 - MODIFICATION OF EQUIPMENT- FIRE FIGHTING/RESCUE/SAFETY EQUIPMENT... of ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/22/2026
...and replace the existing fire suppression control panel for the Photo Vault located ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/22/2026