| Location: | Pennsylvania |
|---|---|
| Posted: | Jul 8, 2025 |
| Due: | Aug 13, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Northampton, Bucks County, Municipal Authority |
| Publication URL: | To access bid details, please log in. |
Project Description: This Contract includes the construction of a water main extension with water services and curb stops located in the right-of-way for each adjacent residential property and additional connections offered to residences with current water main access. Full public water service connections will be offered to each property located adjacent to the extension however the total number of full connections to be made is subject to each homeowner’s willingness to accept the connection offer from NBCMA. The project includes the horizontal directional drill
installation of 8-inch water main, water main taps, fire hydrants, automatic flushing station/sampling station, services, meter pits, plumbing connections, disconnection of wells and all appurtenances. Construction will occur in the State Highway, Township Road, rights-of-way and easement areas on private property. Contractor shall be responsible for providing all necessary erosion and sedimentation controls and restoration (the “Project”).

With GovernmentContracts, you can:
...Plumbing Upgrade Phase 3 Design. This announcement is being issued in accordance with ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/22/2026
...County, PA Design Firm: Martina Bacarella Architect Project Description: Keystone Human Services...-Barre area ...
PennBid
Bid Due: 6/16/2026
...County, State: Cambria County, PA Design Firm: Upstreet Architects, Inc. Project Description: Sealed... ...
PennBid
Bid Due: 7/06/2026
..., State: Bucks County, PA Design Firm: N/A Estimated Contract Value: The County ...
PennBid
Bid Due: 6/22/2026