The following five (5) offerors will be invited to participate in Phase 2 of this acquisition for Solicitation Number: W9126G24R0125, Child Development Center, Lackland Air Force Base, San Antionio, Texas.
StructSure Projects
ATTN: Mr. Kevin Rogers, CEO
903 E 104th St., Suite 140
Kansas City, MO 64131
The Korte Company
ATTN: Mr. Brent Korte, President
5700 Oakland Avenue, Suite 275
St. Louis, MO 63110
The Ross Group Construction
ATTN: Mr. Warren E. Ross, Executive
510 East 2nd Street
Tulsa, OK 74120
SGS, LLC
ATTN: Mr. Eddie Scott, President
2121 Sough Mustang Road
Yukon, OK 73099
Bryan Construction Inc.
ATTN: Mr. Rusty Chamberlain, Executive
5475 Tech Center Drive, Suite 300
Colorado Springs, CO 80919, USA
This project is a Design Build construction of a large child development center utilizing the standard facility design using a Two-Phase Design Build process in accordance with FAR 36.3-Two-Phase Design-Build Selection Procedures. The new facility will include child development areas for infants, pre-toddlers, toddlers, preschoolers, administrative space, lobby areas, public restrooms, storage rooms, kitchen area and playground areas with equipment provided from other appropriations. The construction will consist of concrete foundation, concrete floor slabs, structural steel frame, masonry walls and standing seam metal roof. The project will include all utilities, site improvements, pavements, security systems, passive force protection measures to include perimeter fencing and lighting, and other supporting work necessary to make a complete and usable facility. Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01.
| Mar 7, 2025 | [Solicitation (Updated)] Child Development Center on Lackland Air Force Base, JBSA, Texas |