SPECIFICATIONS
AND
CONTRACT DOCUMENTS
Bid No. 26-08
2025 HOUSTON COUNTY SAFETY ACTION PLAN
HOUSTON COUNTY PUBLIC WORKS
PERRY, GEORGIA
February 2026
2018 Kings Chapel Road
Perry, Georgia 31069
478-987-4280
(fax) 478-988-8007
TABLE OF CONTENTS
ITEM
- Invitation to Bid
- Instructions to Bidders
- Notice to Bidders
- Proposal
- Bid Bond
- Agreement
- Performance Bond
- Payment Bond
- Certificate of Owner’s Attorney
- General Conditions
- E-Verify Affidavit
-Certification of Nonsegregated Facilities
- Maps
Page
3
4
10
11
14
16
20
23
26
27
33
34
ATTACHMENT
Houston County, Georgia
2025 Safety Action Plan Funding
Page 2
INVITATION TO BID
2025 Houston County Safety Action Plan Project
Bid No. 26-08
HOUSTON COUNTY GEORGIA
Sealed Bids will be received at the Houston County Public Works Department, 2018 Kings Chapel Rd. Perry, Ga. 31069
until 10:00 AM
Friday, February 6, 2026 for the following project:
Striping of various roadways in Houston County
totaling 35 miles.
Bid and Contract Documents are available at the Houston County web site
https://www.houstoncountyga.gov/business/current-bids.cms .
Houston County reserves the right to accept or reject any or all bids and to waive technicalities.
The bidder’s E-Verify Number shall be marked on the outside of the bid envelope. A completed “E-Verify Affidavit for
Road Construction” shall be included with the bid.
All bids must be accompanied by a Bid Bond in the amount not less than ten percent (10%) of the Total Base Bid.
Performance and Payment Bond, each in the amount of one hundred percent (100%) of the total contract amount, will be
required of the successful bidder. Bonds must be written by an acceptable Surety Company licensed to do business in the
State of Georgia and listed in the Department of Treasury, Circular 570, latest edition.
A mandatory pre-bid conference is scheduled for Wednesday, January 28, 2026, in the Houston County Public Works
Office, 2018 Kings Chapel Road, Perry, Georgia. The meeting will begin at 10:00 AM.
All potential bidders must be GDOT prequalified. For more information, please contact
Ken Robinson at 478-987-4280.
Houston County, Georgia
2025 Safety Action Plan Funding
Page 3
Section 200
INSTRUCTIONS TO BIDDERS
1. Defined Terms: The term "Bidder" means one who submits a Bid directly to Owner, as distinct from a
sub-bidder, who submits a bid to a Bidder. The term "Successful Bidder" means the lowest, qualified,
responsible and responsive Bidder to whom Owner (on the basis of Owner's evaluation as hereinafter
provided) makes an award. The term "Bidding Documents" includes the Invitation to Bid, Instructions to
Bidders, Notice to Bidders, the Proposal, proposed Contract Documents (including all Addenda issued
prior to receipt of Bids) and location maps.
2. Copies of Bidding Documents:
2.1 Complete sets of Bidding Documents must be used in preparing Bids; Owner assumes no
responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding
Documents.
2.2 Owner in making copies of Bidding Documents available on the above terms does so only for the
purpose of obtaining Bids on the Work and does not confer a license or grant for any other use.
3. Qualifications of Bidders: To demonstrate qualifications to perform the Work, each Bidder must be
prepared to submit within five days of Owner's request, written evidence, such as financial data, previous
experience, past litigation history, present commitments and other such data as may be called for in the
General Conditions. Each bidder must be properly licensed in the State of Georgia and on the current
GDOT prequalified contractors list to be considered.
4. Examination of Contract Documents and Site:
4.1 It is the responsibility of each Bidder before submitting a Bid, to (a) examine the Bidding
Documents thoroughly, (b) visit the sites to become familiar with local conditions that may affect
cost, progress, performance or furnishing of the Work, (c) consider federal, state and local Laws
and Regulations that may affect cost, progress, performance or furnishing of the Work, (d) study
and carefully correlate Bidder's observations with the Bidding Documents, and (e) notify Owner
of all conflicts, errors or discrepancies in the Bidding Documents.
4.2 Before submitting a Bid, each Bidder will, at Bidder's own expense, make or obtain any additional
examinations, investigations, explorations, tests and studies and obtain any additional information
and data which pertain to the physical conditions (surface, subsurface and Underground
Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance
or furnishing of the Work and which Bidder deems necessary to determine its Bid for performing
and furnishing the Work in accordance with the time, price and other terms and conditions of the
Bidding Documents.
4.3 The lands upon which the Work is to be performed, rights-of-way and easements for access
thereto and other lands designated for use by Contractor in performing the Work are identified in
the Bidding Documents. All additional lands and access thereto required for temporary construc-
tion facilities or storage of materials and equipment are to be provided by Contractor. Easements
for permanent structures or permanent changes in existing structures are to be obtained and paid
for by Owner unless otherwise provided in the Bidding Documents.
4.4 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder
has complied with every requirement of this Paragraph 4, that without exception the Bid is
premised upon performing and furnishing the Work required by the Bidding Documents and such
Houston County, Georgia
2025 Safety Action Plan Funding
Page 4
means, methods, techniques, sequences or procedures of construction as may be indicated in or
required by the Bidding Documents, and that the Bidding Documents are sufficient in scope and
detail to indicate and convey understanding of all terms and conditions for performance and
furnishing of the Work.
5. Interpretations and Addenda:
5.1 All questions about the meaning or intent of the Bidding Documents are to be directed to Owner.
Interpretations or clarifications considered necessary by Owner in response to such questions will
be issued by Addenda mailed or delivered to all parties recorded by Owner as having received
the Bidding Documents. Questions received less than three (3) days prior to the date for opening
of Bids may not be answered. Only questions answered by formal written Addenda will be
binding. Oral and other interpretations or clarifications will be without legal effect.
5.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by Owner.
6. Bid Security: All bids must be accompanied by a Bid Bond in the amount not less than ten percent (10%)
of the Total Base Bid. Performance and Payment Bond, each in the amount of one hundred percent
(100%) of the total contract amount, will be required of the successful bidder. Bonds must be written by
an acceptable Surety Company licensed to do business in the State of Georgia and listed in the
Department of Treasury, Circular 570, latest edition.
7. (OMITTED)
8. Indemnification: The Contractor must agree to indemnify and to hold the Owner, its employees, and
agents harmless from any and all claims for damages to persons and/or property arising out of or in any
way connected with the performance by Contractor of any work, services, or functions contracted for.
9. Contract Time: The number of days within which, or the dates by which, the Work is to be completed
and ready for final payment shall be from the issuance of the notice to proceed until July 31, 2026 and
is set forth in the Proposal and the Agreement.
10. Liquidated Damages: As time is an essential element in this contract, all work shall be completed within
the allotted time as specified in item nine (9) above. For each calendar day that any portion of the road
construction shall remain uncompleted after the end of the time specified, the amount of Two Hundred
Dollars per calendar day ($200.00/day) will be assessed. The amount is assessed not as a penalty, but
as a predetermined and agreed liquidated damages to be used, in part, to pay any additional expenses
incurred by the Owner as a result of being delayed.
11. Substitute or "Or Equal" Items: The materials and equipment described in the Bidding Documents
establish a standard of required function, dimension, appearance and quality to be met by any proposed
substitution. No substitution will be considered unless written request for approval has been submitted
by the Bidder and has been received by Owner at least fifteen days prior to the date for receipt of Bids.
Each such request shall include the name of the material or equipment for which it is to be substituted
and a complete description of the proposed substitute including drawings, cuts, performance and test
data and any other information necessary for an evaluation. A statement setting forth any changes in
other materials, equipment or Work that incorporation of the substitute would require shall be included.
The burden of proof of the merit of the proposed substitute is upon the Bidder. The Owner's decision of
approval or disapproval of a proposed substitution shall be final. If Owner approves any proposed
substitution, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders
shall not rely upon approvals made in any other manner. This paragraph will only apply to major material
Houston County, Georgia
2025 Safety Action Plan Funding