| Location: | Texas |
|---|---|
| Posted: | Nov 16, 2025 |
| Due: | Dec 5, 2025 |
| Agency: | City of Waco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2025-059 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project generally consists of the expansion of the existing Bull Hide Wastewater Treatment Facility to 4.0 mgd ADF and 16.0 mgd P2HF, including construction of a new Influent Pump Station, Headworks to screen and degrit, Flow Distribution Structure, Process Trains C and D, Mixed Liquor Splitter Box, Secondary Clarifiers C and D, Disk Filter, UV Disinfection Equipment (replace existing outdated equipment), Solids Storage and Thickening Facilities, Odor Control Systems, Alum Feed Facility, Electrical and Blower Buildings/Enclosures, and site civil piping, grading and drainage improvements.

With GovernmentContracts, you can:
...Switching Station Control Cable) Issue Date & Time 9/10/2026 03:27:32 PM (CT) Close ...
City of Garland
Bid Due: 9/29/2026
...Project: ITB - Heating, Ventilation and Air Conditioning (HVAC) and Controls Upgrades... at ...
Harris County
Bid Due: 9/28/2026
...Project: ITB - Heating, Ventilation and Air Conditioning (HVAC) and Controls Upgrades... at ...
Harris County
Bid Due: 10/05/2026
...Project ID: Title: Pest Control TRWD Facilities Addenda: 2 Release Date: 8/26/2026 Due ...
Tarrant Regional Water District
Bid Due: 9/25/2026