| Location: | Texas |
|---|---|
| Posted: | Nov 16, 2025 |
| Due: | Dec 5, 2025 |
| Agency: | City of Waco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2025-059 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project generally consists of the expansion of the existing Bull Hide Wastewater Treatment Facility to 4.0 mgd ADF and 16.0 mgd P2HF, including construction of a new Influent Pump Station, Headworks to screen and degrit, Flow Distribution Structure, Process Trains C and D, Mixed Liquor Splitter Box, Secondary Clarifiers C and D, Disk Filter, UV Disinfection Equipment (replace existing outdated equipment), Solids Storage and Thickening Facilities, Odor Control Systems, Alum Feed Facility, Electrical and Blower Buildings/Enclosures, and site civil piping, grading and drainage improvements.

With GovernmentContracts, you can:
...distribution system by providing approximately 1,600 linear feet of new 12-inch water line, ...
City of Andrews
Bid Due: 10/20/2026
..., reliability, and sustainability of the community's drinking water distribution system. This... approximately ...
City of Farmers Branch
Bid Due: 11/03/2026
...; 92597-Water Supply, Treatment, And Distribution/Engineering; 92596-Waste Water Treatment... Federal, State and Municipal ...
State Government of Texas
Bid Due: 12/01/2026
...-Construction, Water System/Plants, Main And Service Line; 91391-Maintenance And Repair, Wastewater Treatment... River ...
State Government of Texas
Bid Due: 11/03/2026