| Location: | Texas |
|---|---|
| Posted: | Nov 16, 2025 |
| Due: | Dec 5, 2025 |
| Agency: | City of Waco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2025-059 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project generally consists of the expansion of the existing Bull Hide Wastewater Treatment Facility to 4.0 mgd ADF and 16.0 mgd P2HF, including construction of a new Influent Pump Station, Headworks to screen and degrit, Flow Distribution Structure, Process Trains C and D, Mixed Liquor Splitter Box, Secondary Clarifiers C and D, Disk Filter, UV Disinfection Equipment (replace existing outdated equipment), Solids Storage and Thickening Facilities, Odor Control Systems, Alum Feed Facility, Electrical and Blower Buildings/Enclosures, and site civil piping, grading and drainage improvements.

With GovernmentContracts, you can:
...for HVAC Water Treatment Services, Water Treatment Equipment Repairs, and Cooling Tower Cleaning...
Tarrant County
Bid Due: 7/06/2026
.... Without proper water treatment, these traits cause scale, corrosion, and biofouling that ...
El Paso Independent School District
Bid Due: 7/01/2026
...6100019530 Annual Contract for San Antonio Public Library HVAC Water Treatment Services The ...
City of San Antonio
Bid Due: 6/23/2026
...Water Pump Station; (13) Sludge holding tanks; (14) Solids Building with thickening equipment... ...
City of Fort Worth
Bid Due: 6/25/2026