ADDENDUM #1 – MCAULIFFE SCHOOL
OXNARD SCHOOL DISTRICT
BID #25-04 – MCAULIFFE SCHOOL ROOFING IMPROVEMENT PROJECT 2026
NOTICE TO ALL CONTRACTORS SUBMITTING BIDS FOR THIS WORK:
You are hereby notified of the following changes, clarifications or modifications to the original Contract
Documents, Project Manual, Drawings, Specifications, and subsequent Addenda. This Addendum shall
supersede the original; Contract Documents, and previous Addenda wherein it contradicts the same and shall
take precedence over anything to the contrary therein. All other conditions remain unchanged.
CHANGES AND/OR CLARIFICATIONS TO THE PROJECT MANUAL, CONTRACT DOCUMENTS, DRAWINGS AND
SPECIFICATIONS:
CLARIFICATION/CHANGES/ADDITIONS TO THE PROJECT MANUAL:
1. Updated Bid Opening date: Friday, April 24, 2026, at 1:30 PM
2. Updated Notice of Intent to Award: Tuesday, April 28, 2026
3. Remove the reference to R-10 insulation. Due to the low window heights on the north side, use 1-inch
polyiso insulation instead.
4. Remove the newly installed HVAC Uni-Strut supports and flashings. Replace them with approved round
or square tube supports or use a roofed-in sleeper detail in these areas.
5. Replace or recover all horizontal and vertical expansion joints with a new Tremply KEE low-profile
expansion joint detail.
6. Note: All built-up roofs (B.U.R.) at McAuliffe are retrofit projects.
QUESTIONS AND ANSWERS:
1. Could the District provide the as-builts as an addendum, as discussed during the job walk with the
District representative?
A. This information can be found in the link below.
https://drive.google.com/drive/folders/1S8f2kZTc3XUbgoThKlKCPMi2KpwpXQ9M?usp=sharing
END OF ADDENDUM #1