Bid Solicitation: SPD125-SPDAD-5902
|
|
Header Information
|
|
Bid Number:
|
SPD125-SPDAD-5902
|
Description:
|
Big Bear Tennis Court Rehab Project
|
Bid Opening Date:
|
05/27/2025 01:59:59 PM
|
|
Purchaser:
|
Joni Yang
|
Organization:
|
Special Districts
|
|
Department:
|
SPDADMIN - ADMINISTRATION
|
Location:
|
ADENG - Engineering
|
|
Fiscal Year:
|
25
|
Type Code:
|
RB - Request For Bid
|
Allow Electronic Quote:
|
Yes
|
|
Alternate Id:
|
|
Required Date:
|
05/15/2025
|
Available Date
:
|
05/21/2025 05:59:59 PM
|
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
Big Bear Tennis Court Rehab Project
|
|
Bulletin Desc:
|
The contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project, which includes the construction of two (2) tennis courts and the court, as well as clean-up activities, traffic control, and all other work necessary to complete this project. All work must be executed in accordance with the Bid Documents, including Plans and Specifications.
|
|
|
Ship-to Address:
|
Reception
Eng Tech
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415
US
Email: SDDprocurement@sdd.sbcounty.gov
Phone: (909) 386-8800
|
Bill-to Address:
|
Special Districts Department
Fiscal Specialist
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415
US
Email: rosa.lopez@sdd.sbcounty.gov
Phone: (909) 386-8800
|
Print Format:
|
|
File Attachments:
|
Section A - Bidding Requirements 1 of 7
Section A - Bidding Requirements 1 of 7.R
Section A - Bidding Requirements 1 of 7.R1
Section A - Bidding Requirements 1 of 7 R2
Section A - Bidding Requirements 1 of 7 R3
Section B - Contract Agreement and Bonds 2 of 7
Section C - Prevailing Wage 3 of 7
Section D - General Conditions 4 of 7
Section E - Special Conditions 5 of 7
Section F - Technical Specifications 6 of 7
Section F - Technical Specifications 6 of 7.R
Section G - Contract Drawings 7 of 7
Section G - Contract Drawings 7 of 7.R
Addendum No. 1
Pre-Bid Meeting Agenda & Signed In Sheet
Addendum No. 2
Addendum No. 3
Addendum No. 4
Addendum No. 5
|
Form Attachments:
|
|
|
Required Quote Attachments
|
|
|
Amendments:
|
|
Amendment #
|
Amendment Date
|
Amendment Note
|
1
|
05/20/2025 03:04:58 PM
|
Attachment File Changes: Header 1. File 'Addendum No. 4': File 'Addendum No. 4' added .
|
2
|
05/21/2025 04:58:21 PM
|
Header 1. Available Date changed from "05/15/2025 05:59:59 PM" to "05/21/2025 05:59:59 PM". 2. Bid Opening Date changed from "05/22/2025 01:59:59 PM" to "05/27/2025 01:59:59 PM". Attachment File Changes: Header 1. File 'Addendum No. 5': File 'Addendum No. 5' added . 2. File 'Section A - Bidding Requirements 1 of 7 R3': File 'Section A - Bidding Requirements 1 of 7 R3' added . 3. File 'Section F - Technical Specifications 6 of 7.R': File 'Section F - Technical Specifications 6 of 7.R' added . 4. File 'Section B - Contract Agreement and Bonds 2 of 7': Order changed from "5" to "6". 5. File 'Section C - Prevailing Wage 3 of 7': Order changed from "6" to "7". 6. File 'Section D - General Conditions 4 of 7': Order changed from "7" to "8". 7. File 'Section E - Special Conditions 5 of 7': Order changed from "8" to "9". 8. File 'Section F - Technical Specifications 6 of 7': Order changed from "9" to "10". 9. File 'Section G - Contract Drawings 7 of 7': Order changed from "10" to "12". 10. File 'Pre-Bid Meeting Agenda & Signed In Sheet': Order changed from "13" to "15". 11. File 'Addendum No. 1': Order changed from "12" to "14". 12. File 'Addendum No. 2': Order changed from "14" to "16". 13. File 'Section G - Contract Drawings 7 of 7.R': Order changed from "11" to "13". 14. File 'Addendum No. 3': Order changed from "15" to "17". 15. File 'Addendum No. 4': Order changed from "16" to "18".
|
3
|
05/22/2025 07:35:23 AM
|
Attachment File Changes: Header 1. File 'Addendum No. 5': File 'Addendum No. 5' deleted . 2. File 'Section A - Bidding Requirements 1 of 7 R3': File 'Section A - Bidding Requirements 1 of 7 R3' deleted . 3. File 'Addendum No. 5': File 'Addendum No. 5' added . 4. File 'Section A - Bidding Requirements 1 of 7 R3': File 'Section A - Bidding Requirements 1 of 7 R3' added .
|
|
|
Item # 1:
(
650
-
48
)
|
The contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project, which will include the construction of two (2) tennis courts and the reconstruction of one (1) existing tennis court, which will be adapted for use as a multi-purpose court, as well as clean up activities, traffic control, and all other work necessary to complete this project. All work must be executed in accordance with the Bid Documents, including Plans and Specifications.
|
|
NIGP Code:
|
650-48
Recycled Recreational and Park Equipment
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
JOB - Job
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2:
(
912
-
65
)
|
The contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project, which will include the construction of two (2) tennis courts and the reconstruction of one (1) existing tennis court, which will be adapted for use as a multi-purpose court, as well as clean up activities, traffic control, and all other work necessary to complete this project. All work must be executed in accordance with the Bid Documents, including Plans and Specifications.
|
|
NIGP Code:
|
912-65
Maintenance and Repair, Tennis/Sport Court
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
JOB - Job
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 3:
(
968
-
61
)
|
The contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project, which will include the construction of two (2) tennis courts and the reconstruction of one (1) existing tennis court, which will be adapted for use as a multi-purpose court, as well as clean up activities, traffic control, and all other work necessary to complete this project. All work must be executed in accordance with the Bid Documents, including Plans and Specifications.
|
|
NIGP Code:
|
968-61
Pavement Marking Services (Including Removal of Markings)
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
JOB - Job
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 4:
(
909
-
22
)
|
The contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project, which will include the construction of two (2) tennis courts and the reconstruction of one (1) existing tennis court, which will be adapted for use as a multi-purpose court, as well as clean up activities, traffic control, and all other work necessary to complete this project. All work must be executed in accordance with the Bid Documents, including Plans and Specifications.
|
|
NIGP Code:
|
909-22
Building Construction, Non-Residential (Office Bldg., etc.)
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
JOB - Job
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 5:
(
330
-
13
)
|
The contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project, which will include the construction of two (2) tennis courts and the reconstruction of one (1) existing tennis court, which will be adapted for use as a multi-purpose court, as well as clean up activities, traffic control, and all other work necessary to complete this project. All work must be executed in accordance with the Bid Documents, including Plans and Specifications.
|
|
NIGP Code:
|
330-13
Fencing, Chain Link (Including Fabric, Gates, Panels, Posts and Fittings)
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
JOB - Job
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|
|
|
SBCOUNTY_SBCOUNTY_AWS_PROD_BUYSPEED_2_bso
|
|