| Location: | Georgia |
|---|---|
| Posted: | Mar 18, 2026 |
| Due: | Apr 15, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-77017-NONST-2026-000000050 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-77017-NONST-2026-000000050 | IFB#311 TO 317 CONTRACT FOR PIPE INSTALLATION 2 INCH -8INCH-12INCH -16INCH -20/24INCH -30INCH-36INCH | Douglasville-Douglas County Water & Sewer Authority |
Mar 18, 2026 @ 03:14 PM
|
Apr 15, 2026 @ 02:00 PM
|
Start Date: Mar 18, 2026 @ 03:14 PM ET
End Date:
Apr 15, 2026 @ 02:00 PM ET
DOUGLASVILLE ¿ DOUGLAS COUNTY WATER AND SEWER AUTHORITY
8763 Hospital Drive
Douglasville, Georgia 30134
INVITATION FOR BIDS
CONTRACT FOR
30-INCH DUCTILE IRON PIPE INSTALLATION
IFB# 316
March 18, 2026
The Douglasville-Douglas County Water and Sewer Authority (hereinafter referred to as the ¿Authority¿) is soliciting competitive sealed bids from qualified contractors for a non-exclusive two (2) year contract for the installation of 30-inch ductile iron pipe for Authority projects to consist of the successful contractor being required to install such quantities of 30-inch ductile iron pipe as may be requested by the Authority on an as-needed basis. No minimum quantity of work is guaranteed by the Authority under said contract. Each specific ductile iron pipe installation project under the contract shall be authorized by the issuance of a separate, detailed written Work Order. The Authority will secure and submit all required permits and acquire any necessary easements prior to the issuance of the Work Order for a project to commence.
The Scope of Work includes the provision by the successful contractor of all labor, tools, equipment, and supervision necessary for the installation of 30-inch ductile iron pipe for Authority projects, including, but not limited to, all pavement cutting, boring and excavation, bedding, tapping, soil erosion and sedimentation control, grassing, landscaping, and all other activities necessary for proper pipe installation in accordance with the project installation plans for the applicable Work Order and the Authority¿s Design and Construction Standards. The Authority will provide all pipe and materials necessary to complete said 30-inch ductile iron pipe installation projects.
| Code | Description |
| 91340 | Construction, Pipeline, Including Aerial Crossings |
| 91339 | Construction, Pipe Culvert |
| 91356 | Construction, Utility and Underground Projects |
| 91392 | Maintenance and Repair, Water System, Main and Service Line |
| 91360 | Construction, Water System, Plants, Main and Service Line |
Joseph Morency
jmorency@ddcwsa.com
770-920-3864

With GovernmentContracts, you can:
...26-009 Cove Creek Drive and Spring Street Sewer Main Replacement Flowery Branch, City ...
State Government of Georgia
Bid Due: 6/04/2026
...Description Opening Date/Time Closing Date/Time 26-009 Cove Creek Drive and Spring Street Sewer... ...
Flowery Branch city
Bid Due: 6/04/2026
...of approximately 1,356 linear feet of 8-inch PVC sanitary sewer main and the ...
State Government of Georgia
Bid Due: 6/10/2026
...driveway. The contractor shall also connect 10 LF of 2? SDR sanitary sewer ...
State Government of Georgia
Bid Due: 6/03/2026