| Location: | Georgia |
|---|---|
| Posted: | Mar 18, 2026 |
| Due: | Apr 23, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66213-NONST-2026-000000017 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66213-NONST-2026-000000017 | Barrow County Water Supply Connection - Phase I | Hoschton, City Of |
Mar 18, 2026 @ 02:24 PM
|
Apr 23, 2026 @ 02:00 PM
|
Start Date: Mar 18, 2026 @ 02:24 PM ET
End Date:
Apr 23, 2026 @ 02:00 PM ET
Sealed bids will be received by the City of Hoschton, Georgia for furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for the construction of Barrow County Water Supply Connection ¿ Phase I in Hoschton, Georgia.
Bids will be received at Hoschton City Hall, 61 City Square Street, Hoschton, GA 30548 until 2:00 p.m. on April 23, 2026. Any bid received after said time and date of bid opening will not be considered by OWNER. Bids will be publicly opened and read aloud at this time and location. The Project consists of, but is not limited to the following major elements: Installation of approximately 350 LF of 12-inch restrained joint DIP waterline, 300 LF horizontal directional drilling of 20-inch DR17 IPS HDPE with a 12-inch DR9 DIPS HDPE carrier pipe, connections to existing waterlines, a 6-ft x 12-ft solenoid control valve vault, electrical and SCADA, valves and associated appurtenances.
For purchasing hard copy documents or requesting free digital sets regarding this project, you may contact Jessica James at 770-962-1387 or jjames@eminc.biz. For technical questions regarding this project, you may contact Greg Bennett at 770-962-1387 or gbennett@eminc.biz.
| Code | Description |
| 91392 | Maintenance and Repair, Water System, Main and Service Line |
| 91360 | Construction, Water System, Plants, Main and Service Line |
Jennifer Harrison
jkidd@cityofhoschton.com
706 654 3034

With GovernmentContracts, you can:
...RFP 26-009 Pipe Rehabilitation, Pipe Lining Sugar Hill, City Of May 14, 2026 ...
State Government of Georgia
Bid Due: 6/18/2026
...reinforced concrete pipe (RCP), installation of a new standard headwall with stone veneer, ...
City of Sandy Springs
Bid Due: 7/07/2026
..., Albany, Georgia 31701, until 2:30 p.m. on June 10, 2026, for all ...
State Government of Georgia
Bid Due: 6/10/2026
...corrugated metal pipe (CMP), replacement of 8 linear feet of 18-inch reinforced concrete ...
State Government of Georgia
Bid Due: 7/07/2026