Statement of Work
1100-71501 SCI Huntingdon C-Yard Paving Project
I. CERTIFIED MICRO BUSINESS NOTIFICATION
ONLY CERTIFIED MICRO BUSINESSES ARE ELIGIBLE FOR AWARD. The Department of
Corrections has designated this bid opportunity as a Mirco Business Procurement to
provide DGS-certified micro businesses with opportunities to compete against other
DGS-certified micro business for Commonwealth agency and DGS statewide Purchase
Orders. Only certificated micro businesses are eligible to submit a bid and receive an
award. The micro business requirements and certification process can be found on
the following site. The Micro Business Certification will be provided after the self-
certification process on the MCBR site. A valid Department of General Services (DGS)
Micro Business certificate will be required as part of the bid in order to be deemed a
responsive bidder. Any business without a valid certificate on the bid due date and
time may be rejected as non-responsive. This Purchase Order will be monitored for
compliance by the Bureau of Diversity, Inclusion, and Small Business Opportunities
(BDISBO).
II. ELECTRONIC BID RESPONSE
Only electronic bid responses will be accepted. Registered vendors may find
solicitation on the PA Supplier Portal. All bidders are responsible for monitoring
eMarketplace to view any change notices to this IFB. The change notices shall
become incorporated as part of this solicitation. Interested vendors must be
registered to submit a bid. To register and obtain a vendor number, visit the PA
Supplier Portal. Information about the registration and bidding process can be found
at the Supplier Service Center.
III. SCOPE OF WORK
The Commonwealth of Pennsylvania, Department of Corrections (DOC), requires the
milling and paving of approximately 49,525 square feet of the C-Yard exercise area at
SCI Huntingdon, located at 1100 Pike Street, Huntingdon, PA 16654. Milling will only
be required in areas with existing blacktop. Concrete areas will receive an asphalt
overlay. Sub base reconstruction is not anticipated. Refer to Appendix A – C-Yard
Paving Project for satellite image of area.
IV.
1
ISSUIING OFFICER
Questions regarding the bid should be directed towards Steven Buzzard
(sbuzzard@pa.gov). All questions regarding the IFB must be submitted by email.
Subject line of the email must reference: 6100065465 SCI Huntingdon C-Yard Paving
Project. Questions received within 48 hours prior to the bid due date and time will be
answered at the discretion of the Commonwealth. All questions received will be
answered, in writing, and such responses shall be posted to eMarketplace as an
addendum to the IFB. The Issuing Office shall not be bound by any verbal
Statement of Work
1100-71501 SCI Huntingdon C-Yard Paving Project
information, nor shall it be bound by any written information that is not either
contained within the IFB or formally issued as an addendum by the Issuing Office.
V. MANDATORY SITE VISIT
A mandatory site visit will be held on Tuesday, March 10, 2026 at 11:00AM, at SCI
Huntingdon located at 1100 Pike Street, Huntingdon, PA 16654. Each prospective
bidder must attend the site visit. Prospective bidders must email Mike Wenrick at
(mwenrick@pa.gov) to confirm attendance and identify participation 5-days prior to
visit. The Department of Corrections requires that all person(s) attending the site
inspection receive a Security Clearance Check in advance. More information about
the Pennsylvania DOC clearance certificate process can be found on the following
site.
Prospective bidders must attend mandatory site visit to submit a bid. Prospective
bidders who submit a bid without attending the mandatory site visit will be rejected
as non-responsive.
VI. TRADES INVOLVED
The following contractor trades will be required for this project: General Contractor
specializing in paving operations.
VII. CONTRACTOR TASK REQUIREMENTS
The General Contractor will be responsible for milling of existing pavement in pre-
determined areas and a new asphalt overlay to encompass the entire yard area.
To accomplish this task, the contractors are responsible for, but not limited to:
General Contractor:
a. Milling Operations
i. Milling of existing pavement will be required in predetermined areas.
b. Paving Operations
i. Base coat will be applied following milling.
ii. Top coat of asphalt will be applied following the placement of the base
coat.
iii. Areas with existing concrete will receive an acceptable asphalt overlay
in specified areas.
c. Unloading, rigging and leveling of materials equipment.
d. Proper disposal of all waste and debris off-site with documentation to
demonstrate compliance.
2
Statement of Work
1100-71501 SCI Huntingdon C-Yard Paving Project
e. Complete installation of services within a 20-working day period to include at a
minimum:
i. All labor, equipment, and materials necessary for completion of work.
ii. Safe work in accordance with OSHA regulations.
iii. Work per Department of Corrections security protocols and procedures.
iv. Applicable O&M procedures for any newly provided equipment under
this scope of work.
v. Supervision of crews and subcontractors in accordance with this
purchase order.
f. Porta-john
i. Porta-john for crew use. To be removed to staging area outside the
fence at the completion of each work week for service/cleaning by
supplier.
g. Return services and inspection visit within six (6) months of start of operation.
VIII. SPECIFICATIONS
Additional requirements are included in Appendix B – Specifications. The contractor
must adhere to all requirements.
IX. SCOPE OF WORK REQUIREMENTS
The Scope of work shall include, but is not limited to:
a) Submission of a Project Schedule.
b) Coordination between General Contractor and Sub-contractors to ensure the
timely completion of the project in accordance with the DOC approve Project
schedule.
c) Demolition and removal of all construction debris from the site.
d) Coordination of the work with the institution for access and
equipment/material staging.
e) All work, access, and temporary construction to be performed in accordance
with OSHA and DOC safety regulations.
f) Manufacturer’s standard warranty for new provided equipment [minimum of
one (1) year comprehensive parts and labor].
g) Submittals for DOC approval of all major equipment, materials, sub-
assemblies, assemblies, equipment/supplier’s design details.
h) A project sign is NOT required.
X.
3
REPAIR SHALL INCLUDE ALL WORK OR MATERAILS TO MEET THE FOLLOWING
a) Compliance with applicable portions International Building Code, International
Statement of Work
1100-71501 SCI Huntingdon C-Yard Paving Project
Mechanical Code, NECC.
b) OSHA Standards for installed safety devices under this project.
c) Contact Greg Powell at SCI Huntingdon for access and follow-up site visits:
(814) 643-2400 EXT 1400.
d) The desired timeframe for this work to be completed is Spring/Summer of
2026.
e) This work is located inside the secure perimeter of the facility. Tool control
tool control procedures and personnel clearances will be required for this
work.
XI. INSTITUTION WILL PROVIDE THE FOLLOWING SERVICES & COMPONENTS
a) Upon submission of proper clearance, tool inventory and control
documentation, access to work area between 7:30AM to 3:30PM
Monday thru Friday, access to all available utilities and dining facilities
within the limitations of the institution.
b) Tool-check and check in starting after the morning count clears (between
6:30AM and 7:30AM).
c) Secure staging inside the institution for major materials and select
tools/materials subject to approval.
XII. CONTRACTOR REQUIREMENTS
Prevailing Wages. The Contractor agrees to comply with Act 442 – Pennsylvania
Prevailing Wage Act and all applicable Pennsylvania Department of Labor & Industries
rules and regulations. Prevailing wage showing in Appendix C – Prevailing Wages.
Insurance. The contractor shall purchase and maintain, at its expense, the following
types of Insurance, issued by companies acceptable to the Commonwealth. A.
Workmen’s Compensation Insurance sufficient to cover all the employees of
contractor working to fulfill this Purchase Order. B. Comprehensive General Liability
Insurance, including bodily injury and property damage insurance, to protect the
Commonwealth and the Contractor from claims arising out of the performance of this
Purchase Order. The amount of bodily injury shall not be less than $500,000 for injury
to or death of persons per occurrence. The amount of Property Damage Insurance
shall not be less than $300,000 per occurrence. Such policies shall name “The
Commonwealth of PA-DOC” as an additional insured. Prior to the commencement of
work under this Purchase Order, the Contractor must provide the Commonwealth
with current Certificates of Insurance which evidence that the Commonwealth has
been included on the policy as an additional insured. These certificates must include
the Purchase Order location and a brief description of the Purchase Order work.
These certificates shall contain a provision that coverage afforded under the policy
shall not be canceled or charged until at least thirty (30) days prior written notice has
been given to the Commonwealth.
4
Statement of Work
1100-71501 SCI Huntingdon C-Yard Paving Project
Laws. The contractor must comply with the laws set forth through the regular
construction process. These laws include:
a) The Public Works Employment Verification Act
b) The Steel Products Procurement Act
c) The Separations Act
d) Right to know Law Clause
e) Contractor Integrity Provisions
f) Contractor Responsibility Provisions
g) Nondiscrimination/Sexual Harassment Clause
h) Offset Provision
i) ADA Provision
General. Provisions of all related hardware to accomplish proper installation is the
supplier’s responsibility.
XIII. BIDDING REQUIREMENTS
Bidders must complete and attach the following documentation to the bid response
in order to be considered responsive.
a) Costs through PA Supplier Portal
b) Appendix D – Domestic Workforce Utilization Form
c) Appendix E – Worker Protection and Investment Certification Form
Pursuant to Executive Order 2021-06, Worker Protection and Investment
(October 21, 2021), the Commonwealth is responsible for ensuring that every
Pennsylvania worker has a safe and healthy work environment and the
protections afforded them through labor laws. To that end, contractors and
grantees of the Commonwealth must certify that they are in compliance with
all applicable Pennsylvania state labor and workforce safety laws. Such
certification shall be made through the Worker Protections and Investment
Certification Form (BOP-2201) and the completed form must be submitted
with the bid, proposal or quote.
d) Provide a copy of your Micro Business Certification
XIV. CONTRACTOR QUALIFICATIONS
After the bid opening, and prior to awarding the Purchase Order, the Department has
the right to request references (name, addresses and telephone numbers) of similar
work performed in the previous two (2) years as proof of qualifications to perform
the work involved.
5