| Location: | Hawaii |
|---|---|
| Posted: | Feb 28, 2026 |
| Due: | Mar 27, 2026 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: The scope of work consists of 1) removal of an above ground storage tank (AST), 4 fuel dispensers, and structural canopy at the former Enterprise 2) removal and replacement of 3 underground storage tanks (USTs), 3 fuel dispenser systems and the associated fuel authorization system, and a structural canopy at the Maintenance Baseyard 3) removal and replacement of a UST at the Lei Stand and 4) removal and replacement of 3 oil-water separators (OWS), removal of 3 fuel USTs and 1 used oil UST, and 3 fuel dispensers at the Hawaii Community College Aeronautics School House.
Amendment
11/13/2025
Replaced Final Plans AO1105 12.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
FINAL ADDENDUM NO 6 AO1105 12.pdf
|

With GovernmentContracts, you can: