| Location: | North Carolina |
|---|---|
| Posted: | Jul 22, 2026 |
| Due: | Aug 12, 2026 |
| Agency: | Division of Highways |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JOSH STEIN DANIEL H. JOHNSON
GOVERNOR SECRETARY
July 22, 2026
SUBJECT: REQUEST FOR QUOTATION
MEMORANDUM TO PROSPECTIVE BIDDERS
The North Carolina Department of Transportation is requesting bids for the following projects in Division
5:
* DE00409 - HL-0008D
County(s): Wake
Location: SR 1301 (Sunset Lake Rd) between SR 1152 and SR 3973
WBS Element: 49367.3.8
TIP No.: HL-0008D
Date of Availability: September 9, 2026
Completion Date for all work: October 9, 2027
* DE00428 - 2028 Wake Primary Resurfacing
County(s): Wake
Location: Various Primary routes in Wake County
WBS Element: 2027CPT.05.01.10921
TIP No.: N/A
Date of Availability: September 12, 2026
Completion Date for all work: April 30, 2028
* DE00444 - HS-2405BA and HS-2405AU
County(s): Franklin, Harnett, and Wake Counties
Location: Various routes in Franklin, Harnett, and Wake County
WBS Element: 50977.3.54, 50977.3.48
TIP No.: HS-2405BA and HS-2405AU
Date of Availability: September 9, 2026
Completion Date for all work: June 12, 2027
Mailing Address: Telephone: (919) 317-4700 Location:
NC DEPARTMENT OF TRANSPORTATION Fax: (919) 317-4710 2612 NORTH DUKE STREET
DIVISION 5 OFFICE Customer Service: 1-877-368-4968 DURHAM, NC 27704
2612 NORTH DUKE STREET
DURHAM, NC 27704
Website: www.ncdot.gov
Project documents, including Proposal, plans (if applicable), or any additional information related to the
project can be found on the Division 5 Project Letting website:
https://connect.ncdot.gov/letting/Pages/Division5Letting.aspx
Any firm that wishes to bid as a prime contractor shall be prequalified as a Bidder or PO Prime Contractor
prior to submitting a bid. Information regarding prequalification can be found at:
https://connect.ncdot.gov/business/Prequal/Pages/default.aspx.
In order to receive due consideration for DE00409, DE00428, and DE00444 your electronic quotation
must be submitted in the online bidding portal no later than 2:00p.m on Wednesday, August 12, 2026.
For questions regarding Division 5 project lettings, please contact me at 919-707-7391 or at
kncooper@ncdot.gov.
Sincerely,
Kayla Cooper, EI
Division 5 Contract Engineer
//knc
cc: Chadwick Hinnant, Division Construction Engineer
Ben Upshaw, PE, Division Project Development Engineer
Ben Lowery, PE, Resurfacing Program Manager
Caleb Whitby, PE, Project Engineer
Montel Sparrow, Traffic Project Manager
Cody Winkler, PE, Resident Engineer
David Conner, Resident Engineer
Robert Bullock, PE, Deputy Division Construction Engineer
Jorgelia Nino, Utilization and Compliance Manager

With GovernmentContracts, you can:
...BN-0012 POC Town of Pittsboro, Town Lake Park Sidewalk Project 2026-07-08_BN...-0012_Town_Lake_Park_Sidewalk_100%_Plans.pdf Doc. Type: ...
Division of Highways
Bid Due: 10/13/2026
...BN-0012 POC Town of Pittsboro, Town Lake Park Sidewalk Project 2026-09-11_BN...-0012_Technical_Specifications.pdf Doc. Type: ...
Division of Highways
Bid Due: 10/13/2026
...RFB #26-077 Lake Myra County Park Phase I RFB #26-077 Lake Myra County ...
Wake County
Bid Due: 10/08/2026
...RFB #26-077 Lake Myra County Park Phase I RFB #26-077 Lake Myra County ...
Wake County
Bid Due: 10/08/2026