Country Club of Miami - HVAC System Replacement

Location: Florida
Posted: Jun 26, 2026
Due: Jul 14, 2026
Agency: Miami-Dade County
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: RPQ No C2026CCMHVAC
Publication URL: To access bid details, please log in.


Title:
Country Club of Miami - HVAC System Replacement
Opening Date:
7/14/2026 2:00:00 PM
Announcement Info:
CHILLER SYSTEM
Replacement of Existing Air-Cooled Chiller CH-1 and Chilled Water Accessories including valves, thermometers, gauges, piping and insulation with metal jacketing for exterior piping.
Replacement of the associated chilled water piping system, two chilled water pumps, one expansion tank, one air separator, one pot feeder, thermometers and required valves and specialties.
Replacement of the associated chilled water piping system, two chilled water pumps, one expansion tank, one air separator, one pot feeder, thermometers and required valves and specialties.
Replacement of (8) eight Air Handler Units and associated Ductwork and Chilled Water Piping.
Replacement of all associated chilled water piping, together with required manual valves, electronic control valves with actuators, fittings, insulation, supports, and final operational testing.

EXPERIENCE REQUIREMENT:
Bidder or Bidder’s Subcontractor shall have completed at least two (2) projects of similar size and scope; in lieu of the references from the Bidder or Bidder’s Subcontractor, the County will consider the references from Bidder’s key personnel in accordance with Resolution No. R-1122-21. Bidder shall provide evidence of this experience; project names; dollar values and contract information for verification purposes. The experience of the bidding or proposing Contractors’ key personnel will be considered in assessing the Contractor’s experience. This information should be entered on form 00450 Bidder’s Statement of Qualifications and Business References, highlighting at least two comparable projects and using additional pages as needed.

BID DOCUMENTS AND PRE-BID MEETING ACCESS:
To receive the bid documents, contact Roberto Ciprian at Roberto.Ciprian@miamidade.gov. The Bid Documents must be requested directly from the Parks, Recreation and Open Spaces Department or your bid may be deemed non-responsive.

Bid Documents will be available on: 06/11/2026

REQUEST FOR CLARIFICATION/INFORMATION:
All requests for information (RFI) must be submitted in writing by 07/02/2026 to Roberto.Ciprian@miamidade.gov and copy the Clerk of the Board at clerkbcc@miamidade.gov. NO PHONE CALLS WILL BE ACCEPTED. RFIs submitted after the specified deadline may not be attended to. Verbal statements made by the County or the Owner’s Representative that are not contained in an RPQ or addendum to the RPQ are not binding on the County and should not form any basis for a bidder’s response to an RPQ.

PRE-BID CONFERENCE:
A Pre-Bid Conference is scheduled for June 18, 2026 @ 10:00 AM at Country Club of Miami - 6801 NW 186th Street Hialeah, FL 33015

Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.
Technical Certification:
Air Conditioning Unlimited, Air Conditioning Limited

Commodities
Code Description
03105 AIR CONDITIONERS (COOLING AND COOLING/HE
03106 AIR CONDITIONING AND HEATING: CENTRAL UNITS, AND
Solicitation Package/Addendums
Type File Name
Package RPQ_No_C2026CCMHVAC.pdf

Attachment Preview

Parks, Recreation and Open Spaces
Capital Programs Division
275 NW 2nd Street, 4th Floor, Suite 412
Miami FL 33128
MIAMI-DADE COUNTY, FLORIDA
REQUEST FOR PRICE QUOTATION (RPQ)
Contract No: MCC 7360 Plan
RPQ No: C2026CCMHVAC
INVITATION TO BID
A RPQ has been issued for the work identified below. If you are interested in submitting a bid for this project, please submit your
bid via Electronic Bidding, attention to Jeffery Becar at no later than 7/14/2026 at 02:00 PM. If you have any questions, contact
Lawrence Del Valle at 786/315-2136.
This RPQ is issued under the terms and conditions of the Miscellaneous Construction Contracts (MCC) Program MCC 7360 Plan.
RPQ DETAILED BREAKDOWN
Bid Due Date:
7/14/2026
Time Due: 02:00 PM
Submitted Via: Electronic Bidding
Estimated Value:
$1,176,892 (excluding Contingencies and Dedicated Allowances)
Project Name:
Country Club of Miami - HVAC System Replacement
Project Location:
Country Club of Miami - 6801 NW 186th Street Hialeah, FL 33015
License Requirements: Primary:
Air Conditioning Unlimited; Air Conditioning Limited
Scope of Work:
(Contractor must obtain and submit all permits prior to performing any work).
EXPERIENCE REQUIREMENT:
Bidder or Bidder’s Subcontractor shall have completed at least two (2) projects of similar size and
scope; in lieu of the references from the Bidder or Bidder’s Subcontractor, the County will
consider the references from Bidder’s key personnel in accordance with Resolution No. R-1122-
21. Bidder shall provide evidence of this experience; project names; dollar values and contract
information for verification purposes. The experience of the bidding or proposing Contractors’ key
personnel will be considered in assessing the Contractor’s experience. This information should be
entered on form 00450 Bidder''s Statement of Qualifications and Business References,
highlighting at least two comparable projects and using additional pages as needed.
SCOPE OF WORK: (Contractor must obtain and submit all permits prior to performing any work.)
CONTRACTOR shall review all documents, specifications, and scope of work provided by Miami-
Dade County Parks, Recreation, and Open Spaces Department for work to be completed. Furnish
all labor, equipment, and materials required to comply with the intent of the WORK described in
the contract documents including but not limited to:
1.1 The CONTRACTOR shall provide all labor, materials, tools, equipment, supervision, and
services necessary for the Complete Renovation of the Country Club of Miami Golf HVAC System
Replacement.
1.2 Prior to bidding, the contractor shall perform a site visit to become familiar with existing
conditions, verify measurements, and review all areas in accordance with RPQ documents,
drawings, and provided submittals.
1.3 Prior to submitting bid, contractor shall be required to visit site and become familiar with all
areas and requirements per scope of work required in RPQ and shop drawings/attachments
provided by owner as reference only to complete required documents for permitting project.
Contractor shall be required/responsible to complete on site measurements as applies for
submission per building code for permitting as per shop drawing/attachments by owner as
reference only. All costs shall be included in the Contractor’s bid; drawings shall be submitted to
owner for review prior to submission for permitting.
1.4 Replace all HVAC components as per original drawings and design provided by owner,
including Chiller, Air Handler Units, Ductwork, Griller and dampers, Chilled Water Piping, Exhaust
fans, Heaters, Pumps, Insulation, and controls.
1.5 General Requirements include all required permits, permit fees, bond and necessary
documentation to complete the scope of work according to the latest Florida Building Code and
local regulations
1.6 Project schedule is to be provided at Pre-Construction Meeting. Project duration to be (1) Year
from NTP Date. Project phasing shall be in coordination with current building renovation
contractor, HVAC contractor shall coordinate removal/new installation of all ductwork with
renovation contractor as applies with ceiling demolition and new installation to include required
inspections.
1.7 Work under this contract referenced below shall include, but is not limited to:
Provide Submittals for all products used to include, but not limited to: CHILLER SYSTEM,
PUMPS, AIR HANDLER UNITS, DUCTWORK SYSTEM, ELECTRIC DUCT HEATERS,
ADDITIONAL EQUIPMENT
General Scope of Work
CHILLER SYSTEM
Replacement of Existing Air-Cooled Chiller CH-1 and Chilled Water Accessories including valves,
thermometers, gauges, piping and insulation with metal jacketing for exterior piping.
Replacement of the associated chilled water piping system, two chilled water pumps, one
expansion tank, one air separator, one pot feeder, thermometers and required valves and
specialties.
Replacement of (8) eight Air Handler Units and associated Ductwork and Chilled Water Piping.
Replacement of all associated chilled water piping, together with required manual valves,
electronic control valves with actuators, fittings, insulation, supports, and final operational testing.
Replacement of all Associated Ductwork. Replacement of all associated grilles, dampers, smoke
detectors, duct accessories, supports, and connections as required for a complete and
operational system.
Replacement of the associated electric duct heaters.
Provide labor, materials, equipment, and supervision necessary to remove the existing below-
window air conditioning unit and install one new replacement unit with a cooling capacity of
approximately 6,800 BTU/Hr, including all required accessories, supports, connections, start-up,
testing and disposal of the existing unit.
Replacement of Exhaust Fans and Supply Fans. Provide labor, materials, equipment, and
supervision necessary to remove all the existing exhaust and supply fans and furnish and install
new replacement fans, including all required curbs, adapters, disconnects, backdraft dampers,
bird screens, controls accessories, reconnections, supports, and start-up, as applicable to each
fan location.
Provide Pre and After Test and Balance Report for air and hydronics.
Connect new equipment to the existing fire alarm system.
Provide labor, materials, equipment, rigging, piping, valves, controls interface, start-up, and
supervision necessary to remove the existing air-cooled chiller CH-1 and furnish and install one
new JCI/York air-cooled chiller (e-coat factory applied/electro -deposited epoxy coating):
(1) JCI/York Air-Cooled Chiller YLAA0100Z
Equipment Summary:
• 9.98 EER, 16.6 IPLV
• R-454B Refrigerant
• 460V / 3Ph / 60Hz
• Shell and Tube Heat Exchanger
• Closed-cell Foam Insulated Suction Line
• DX Evaporator with High Efficiency Copper Tubes
• Air-cooled Condenser with Internally Enhanced Copper Tubes and Aluminum Alloy Fins
• Service Isolation Valves
• Totally Enclosed Air-Over (TEAO) Condenser Fan Motors
• Hermetic Scroll Compressors
• BACnet Interface
• Environment Guard Premium
• Louvered (Condenser Only) Enclosure Panels
• Evaporator 1 ½” Double Thick Insulation
• BACnet Communication Gateway
• Elastomeric (Neoprene) Pad Vibration Isolators (Field Mounted)
• Designed, tested, and rated in accordance with ARI Standard 550/590
• ASHRAE 90.1 Energy Efficiency Compliance
• Factory Assisted Startup
• Five (5) Year Parts and Labor Warranty
• Five (5) Year Compressor Parts Only Warranty
Provide stand-alone controls for Chiller
Replacement of the associated chilled water piping system, two chilled water pumps, one
expansion tank, one air separator, one pot feeder, thermometers and required valves and
specialties.
PUMPS
(2) Pumps Grundfos/PACO Pump 7.50 HP; 157 GPM @ 70’ TDH
Equipment Summary:
• Manufactured by Grundfos
• TEFC Motors – 460V / 3Ph / 60Hz with VFD Field installed
• Cast Iron Construction
• Non-overloading Pump Curve
• Vertical Inline, split – Coupled
Accessories:
• Suction Diffuser
• Triple Duty Valve
• Expansion Tank
• Air Separator
Provide stand-alone controls for pumps and VFDs
AIR HANDLER UNITS
Replacement of (8) eight Air Handler Units and associated Ductwork and Chilled Water Piping.
Provide labor, materials, equipment, and supervision necessary to remove the existing chilled
water air handling units located in the Mechanical Rooms and furnish and install new replacement
units for AHU-1 through AHU-8, including all required supports, drains, transitions, reconnections,
start-up, and testing.
ITEM B: (08) JCI / York Blower Coil Unit(s)
Equipment Summary:
Manufactured by Johnson Controls
QTY / TAG / MODEL:
AHU-01 – Vertical Direct Drive Blower Coil – AVD40
AHU-02 – Vertical Direct Drive Blower Coil – AVD40
AHU-03 – Modular Indoor Air Handler Unit – AMI12
AHU-04 – Vertical Direct Drive Blower Coil – AVD30
AHU-05 – Vertical Direct Drive Blower Coil – AVD30
AHU-06 – Vertical Direct Drive Blower Coil – AVD08
AHU-07 – Vertical Direct Drive Blower Coil – AVD12
AHU-08 – Vertical Direct Drive Blower Coil – AVD30
General Features:
• 460V / 3Ph / 60Hz
• Rubber-in-Shear Isolators
• 2” Throwaway Filter
• 3-Speed EC Motor
• Double wall construction
• Stainless Steel Drain Pan for AVD
• Non-Fused Door Interlock Disconnect
• Closed Cell Foam Insulation for AVD
• Stainless Steel Coil Casing for AVD
Replacement of all associated chilled water piping, together with required manual valves,
electronic control valves with actuators, fittings, insulation, supports, and final operational testing.
Provide stand-alone controls with control valves, sensors and thermostats for all AHUs.
DUCTWORK SYSTEM
Replacement of all Associated Ductwork.
Provide labor, materials, equipment, and supervision necessary to remove and replace the
ductwork associated with AHU-1 through AHU-8.
New ductwork shall be fabricated from galvanized steel and provided with required insulation.
Ductwork installed within the Mechanical Rooms shall be double-wall construction.
Replacement of all associated grilles, dampers, smoke detectors, duct accessories, supports, and
connections as required for a complete and operational system.
ELECTRIC DUCT HEATERS
Replacement of the associated electric duct heaters.
(8) eight Warren Technology electric duct heaters.
ITEM D: (08) Warren Technology Electric Duct Heater(s)
D-1 – 12 kW
D-2 – 21 kW
D-3 – 3 kW
D-4 – 4 kW
D-5 – 9 kW
D-6 – 1 kW
D-7 – 1 kW
D-8 – 1 kW
Equipment Summary:
• Manufactured by Warren Technology
• 460V / 3Ph / 60 Hz
• Aluminized Steel Construction
• SCR Controls
• Manual Reset High Limit
• Fan Interlock Relay
• Disconnecting Contactors
• Air Pressure Switch
• Control Transformer
Provide stand-alone controls for all heaters.
ADDITIONAL EQUIPMENT
Replacement of Existing Cart Storage Office Air Conditioning Unit.
Provide labor, materials, equipment, and supervision necessary to remove the existing below-
window air conditioning unit and install one new replacement unit with a cooling capacity of
approximately 6,800 BTU/Hr, including all required accessories, supports, connections, start-up,
testing and disposal of the existing unit.
Replacement of Exhaust Fans and Supply Fans.
Provide labor, materials, equipment, and supervision necessary to remove all the existing exhaust
and supply fans and furnish and install new replacement fans, including all required curbs,
adapters, disconnects, backdraft dampers, bird screens, controls accessories, reconnections,
supports, and start-up, as applicable to each fan location.
TESTING AND INTEGRATION
Provide Pre and After Test and Balance Report for air and hydronics.
Connect new equipment to the existing fire alarm system.
1.7 Contractor to submit documentation, submittals etc. at Pre-Construction meeting. Once
submittals are approved materials are to be ordered immediately. Contractor is fully aware of
deadline established and is responsible for any necessary expedited delivery charges.
1.8 Written delivery date confirmations are to be submitted on a bi-weekly basis.
Contractor shall secure/enclose a safe work environment to all areas for public accessibility and
protection of public property during completion of the project.
Contractor shall always leave public access to all walkways. This includes during work hours as
well as after work hours.
1.9 Contractor shall work with coordinating project schedule with all parties involved, including
park manager and construction supervisor. If applicable, contractor shall be responsible for
completing project in multiple phases as to not disrupt the daily park operation schedule.
1.10 Contractor shall be required to secure/fabricate safe working conditions to areas sensitive to
public access and environment regulated within guidelines to any governing agency. This includes
during work hours as well as after work hours.
Material storage area to be determined at pre-construction meeting.
Contractor shall perform all required daily clean-up of jobsite; all areas shall be left in a broom
clean condition.
1.11 Contractor to include all drawings, shop drawings, specifications, reports, plans required for
permitting by the building department as reflected per owner’s drawings. Contractor will submit
product approval and/or manufactures specifications upon pre-construction meeting.
1.12 Contractor shall be responsible for attaining all pertinent permits from any and all governing
entities (i.e., City of Miami, Miami-Dade RER, Electrical, Plumbing, Miami-Dade Public Works,
Miami-Dade Water & Sewer, DERM, Fire, FDEP, Florida Department of Health, South Florida
Water Management, US Army Corps of Engineers, etc.) needed to begin and complete all phases
of work.
1.13 Contractor shall coordinate all required inspections/tests and documentation required by
any/all governing entities, i.e., City of Miami, Miami-Dade Building Department, etc.
1.14 It shall be the contractor’s responsibility to ensure that all required regulatory or proprietary
permits are obtained prior to commencement of work.
1.15 Contractor shall obtain all required permits and forward to Miami Dade County Parks within
five (5) days of receipt of dry run plans.
1.16 Contractor to call Underground Locating Company and have all underground located at least
48 hrs. prior to any excavation and shall provide ticket number to any of the Project Managers.
Contractor to provide ticket numbers provided by underground locating company to owner.
CONTRACTOR SHALL BE RESPONSIBLE FOR UNDERGROUND LOCATIONS WITHIN THE
PROPERTY LINE. Contractor shall provide for any and all means of utility location necessary to
carry out the intent of the work.
Contractor shall be responsible for relocation of any utilities, such as electrical conduit, plumbing,
low-voltage, sprinkler lines etc. to carry out the intended work.
Contractor to provide any exploratory digging as required; inclusive of hand digging.
Contractor is responsible for all Surveying & Layout required. Red Line (As-built) drawings to be
always maintained on site. Accurate survey (Inverts, Dimensions, Locations, etc.) to be reflected
on red line (as-built) plans. These are to be reviewed on a weekly basis by Project Manager.
Three signed and sealed as-builts to be submitted prior to final payment approval. Refer to item
21 for further as-built requirements.
1.17 Contractor is responsible for all MOT (Maintenance of Traffic) required under this project.
1.18 Contractor to coordinate all required inspections/tests and documentation required by any/all
governing entities, i.e., City of Miami, Miami-Dade Building Department, Miami-Dade Water and
Sewer, Miami-Dade Public Works, Plumbing, Electrical, Fire, Florida Department of Health,
DERM, FDEP, South Florida Water Management, FPL, etc.
1.19 Contractor shall provide temporary fencing and safety barriers as directed to maintain a safe
work site. Coordinate fencing and barrier requirements with Owners Representative as job
progresses.
1.20 Miami-Dade County Park and Recreation has specified certain brand names because it
seeks to match products currently in use at other Park facilities. Any specified products or
systems intended to be substituted by the Contractor, must be submitted to the Project Manager
within 30 calendar days after receipt of the Notice to Proceed. Only one (1) request for
substitutions will be considered for each product. When substitutions are not accepted, the
Contractor shall provide specified product. The request is to be accompanied by complete cost
data of the proposed substitution, substantiating compliance with the contract documents,
including product identification and description, performance and test data, references and
samples where applicable, and an itemized comparison of the proposed substitution with the
product specified. Refer to attached form required with proposed substitution. The request is to be
accompanied by data relating to contract time schedule and aesthetic effect when applicable.
When redesign by the Architect or Engineer is required to accommodate an alternate product or
system, all costs of this redesign are to be paid by the Contractor requesting the substitution.
When additional work is required by other contractors to accommodate the alternate product or
system, all additional cost of this work is to be paid by the Contractor requesting the substitution.
Failure to place orders for specified products or systems sufficiently in advance of installation
scheduled date(s) not considered a valid reason upon which Contractor may base request for
Substitutions or for deviations from Contract Documents. Requested substitution will be accepted
as an approved equal or rejected, solely at the discretion of the Owner’s Project Manager with
Architect’s or Engineer’s written approval.
Work required may include, but is not limited to the following trades: Park Site-Work, Carpentry,
Etc.
1.21 Contractor shall be responsible to furnish all temporary utilities as required to complete all
work, this shall include, but is not limited to, electric, water, phone, toilet facilities, etc. Miami Dade
County Parks shall not provide any temporary utility services for the contractors use.
1.22 CONTRACTORS submitting bids for work are responsible to list appropriate subcontractors
required to complete all areas of work required.
1.23 Contractor is responsible for the safety and security of the job site. Any vandalism, theft, etc.
which occurs during the construction time is the responsibility of the Contractor. No monetary
compensation shall be granted if any of the above occurs. Contractor is required to have proper
insurance to cover ongoing work on the job site. If Contractor opts to hire an independent Security
Company, such company is to be properly bonded and insured.
1.24 Contractor shall provide twenty-four hour, seven days a week emergency contact phone
number for emergencies. Contractor’s contact person shall be able to address and resolve site
emergencies on behalf of the contractor.
1.25 Contractor shall be responsible for the safety and security of the job site. Any vandalism,
theft, etc. which occurs during the construction time is the responsibility of the contractor.
Contractor is required to place construction signs, cones, orange plastic safety barrier fencing,
and caution signs at the job site.
Contractor to ensure Project Site is secured daily at Close of Business Day.
1.26 Contractor will be required to complete work during daily operations, areas that accessible
by public will be required at all times (restroom, restaurant, etc.).
1.27 The contractor may be required to perform work in various sections at different working
hours, due to club activities; all areas will be cleaned and free of dust, debris, etc. for the next
day’s operation.
1.28 Contractor shall be responsible for all his/her work until accepted by the owner. Owner has
final acceptance of work/product installed even after final inspection by AHJ. Any damage to any
newly completed or in progress work will be the sole responsibility of the contractor to fix at no
additional cost to the owner. No time extension will be granted for any delays related to such
damages.
1.29 Bidders shall provide any information requested by the department to show they have the
capacity to perform the work specified in this RPQ.
1.30 The Contractor is responsible for repairs on anything damaged that is outside of this scope.
This includes but not limited to: sod, concrete, asphalt, stucco, masonry, paint, etc. All work must
be performed in accordance with all local, state and federal guidelines. All products used shall be
Miami-Dade County approved as well as approved by the Florida Building Code.
1.31 The Contractor is responsible for keeping the site clean during and after construction.
Furthermore, the Contractor ensures removal and proper disposal of all debris generated in
accordance with local, state and federal laws.
1.32 This Scope of Work is not intended to be an all-inclusive description of the Contractors
duties and responsibilities. It is intended to be an “included but not limited to”, outlined to assist
the Contractor with a guideline as to what is expected in their scope of work. As such, the
Contractor understands and accepts that anything that can be reasonably expected in their scope
of work is included and that the basis of determination shall be an objective, typical industry
standard for said work.
BID DOCUMENTS AND PRE-BID MEETING ACCESS:
To receive the bid documents, contact Roberto Ciprian at Roberto.Ciprian@miamidade.gov. The
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Bid Number: FB26-0107 Bid Title: RFQ Clearwell Tank Design Category: Invitation to Bid ...

City of Flagler Beach

Bid Due: 7/31/2026

...Follow AGE Fuel Tank Active Contract Opportunity Notice ID FA481926Q0057 Related Notice Department... ...

DEPT OF DEFENSE

Bid Due: 7/22/2026

...Description: TANK CLEANING SERVICES, WASTEWATER TREATMENT PLANTS, TC Department: Purchasing Buyer...

Palm Beach County

Bid Due: 5/15/2030

...Number: 26-15 Title: East Putnam Regional Water Tank Maintenance Due Date: 08-06-2026 02:00 ...

County of Putnam

Bid Due: 8/06/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.