| Location: | Georgia |
|---|---|
| Posted: | Nov 14, 2025 |
| Due: | Dec 23, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-77030-NONST-2026-000000019 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-77030-NONST-2026-000000019 | Animal Control Facility Project | Troup County Board Of Commissioners |
Nov 14, 2025 @ 03:02 PM
|
Dec 23, 2025 @ 02:00 PM
|
Start Date: Nov 14, 2025 @ 03:02 PM ET
End Date:
Dec 23, 2025 @ 02:00 PM ET
TROUP COUNTY ANIMAL CONTROL FACILITY
144 Sam Walker Drive, LaGrange, GA 30240
Sealed proposals from general contractors will be received by Troup County Purchasing Department, in 100 Ridley Avenue, Suite 3100, until 2 p.m. at the time prevailing in LaGrange, Georgia on 23 DEC 2025 for the Animal Control Facility located at 144 Sam Walker Drive, LaGrange, GA 30241. At the time and place noted above the proposals will be publicly opened.
The contract, if awarded, will be on a lump sum basis. No bid may be withdrawn for a period of sixty (60) days after time has been called on the date of the opening.
The project is to be substantially complete in one hundred and eighty (180) consecutive calendar days. Anticipated start date for construction is on or about 30 JAN 2026.
Bids delivered to:
Troup County Purchasing Department
100 Ridley Ave., Suite 3100
LaGrange, GA 30240
Late bids will not be accepted.
Mandatory Pre-Bid to be held on 20 NOV 2025 at 2 PM on the Project Site. All requests for clarification or additional information must be made via email ONLY to Ramona Gillham, Troup County Purchasing Director at rgillham@troupcountyga.gov and/or Skip Smith, Smith Design Group, Inc. at skip@sdgarch.net. No phone calls or contacts other than email is allowed. Contacting any other party prior to the bid opening for information will require that any bid submitted by said bidder being non-responsive. No requests will be allowed after 11 DEC 2025 at close of business (COB).
Any and all addenda for this project will be posted at www.troupcountyga.gov Please see links below for Project Manual and Drawings
https://www.dropbox.com/scl/fi/akkwux5lh30m2ho7d5d50/2518-Project-Manual-ANIMAL-CONTROL-FOR-BIDDING.pdf?rlkey=0mnurvadit7ef6u540hv81r3q&st=ef4vw1nu&dl=0
https://www.dropbox.com/scl/fi/2fp3ulldc8h4375cf1gfp/2518-Animal-Control-FOR-BIDDING-12-NOV-2025.pdf?rlkey=aeqbupyubyayvewb8ctzv91gw&st=ypt0yurk&dl=0
| Code | Description |
| 90924 | Building Construction, Commercial and Institutional |
| 90921 | Building Construction, Industrial, Warehouse, etc. |
Ramona Gillham
rgillham@troupcountyga.gov
706-883-1635

With GovernmentContracts, you can:
...Construction, Commercial and Institutional 90930 Building Construction, (Not Otherwise Classified) 90960... Maintenance and ...
State Government of Georgia
Bid Due: 7/23/2026
...Pre-Bid Conference - Worth County GRAD Select Site Industrial Complex Roadway Construction Worth... ...
State Government of Georgia
Bid Due: 7/14/2026
..., Industrial, Warehouse, etc. 90922 Building Construction, Non-Residential, Office Bldg., etc. 90923... Building ...
State Government of Georgia
Bid Due: 7/13/2026
...Description 33055 Fencing, Temporary Construction and Other Industrial or Safety Uses 90638 General..., ...
State Government of Georgia
Bid Due: 7/14/2026